Lecture 5 Dozer TSP-308 MPK Ferdinand Fassa.

Slides:



Advertisements
Similar presentations
Excavators Cranes(will discuss another section)
Advertisements

production estimate Question 1
10 OUTPUT AND COSTS CHAPTER.
Excavating and Lifting Part 1
Loading and Hauling.
Loading and Hauling Part 2
© Easy Guides Australia A scraper means a piece of earthmoving equipment with the ability to scrape and move a quantity of soil and to discharge it at.
11 OUTPUT AND COSTS © 2012 Pearson Addison-Wesley.
3-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped bucket capacity is 2.10 CY (1.6 CM). The machine.
Lecture 4 Excavating and Lifting
Draglines and Clamshells
Eng. Malek Abuwarda Lecture 8 P1P1 Construction Methods Lecture 8 Loading and Hauling.
Lecture 7 Loading and Hauling
Chapter 3 Measuring Excavation and Sitework
Measuring Sitework, Excavation, and Piling
Excavating and Lifting Hmwk Ch 2 # 1,2,5,8 Ch 3 #2,4,6,10.
TRUCKS THE MOST COMMON HAULING EQUIPMENT USED FOR MILITARY CONSTRUCTION SITE ARE 2 1/2, 5, AND 20 TON DUMP TRUCKS. THE HAUL CAPACITY CAN BE EXPRESSED.
Earthwork QTO Stage 1 Preconstruction Stage 2: Procurement
Ground-Based Primary Transport TOPICS: Conventional ground skidding equipment Mechanical felling, tree processing & forwarding equipment & systems Management.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Chapter 11 Finishing Equipment
Excavating and Lifting Part 2
Lecture 3 Earthmoving Materials
CTC-375 Construction Methods
Chapter 2 (supplement): Capacity and Level-of-Service Analysis for Freeways and Multilane Highways Objectives of this presentation: By the end of this.
COURSE INTRODUCTION CEM 530 CONSTRUCTION EQUIPMENT AND METHODS BY
10 Output and Costs Notes and teaching tips: 4, 7, 23, 27, 31, and 54.
Inclined Plane, Wedge, & Screw
10 OUTPUT AND COSTS CHAPTER.
© 2010 Pearson Education Canada. What do General Motors, Hydro One, and Campus Sweaters, have in common? Like every firm,  They must decide how much.
Loading and Hauling Part 1
Estimating Ahmed Elyamany, PhD, AVS. EARTHWORK AND EXCAVATION bank  Earth that is to be excavated is called bank measure. loose  Earth that is to be.
Lecture 11 Advance Design of RC Structure Retaining walls
Excavating and Lifting Part 1
Important Features for Utility Tractors Herb Willcutt MSU Ag & Bio Engineering 11/15/06.
Loading and Hauling Part 2
Lecture 6 Loading and Hauling
CONSTRUCTION TECHNOLOGY & maintenance
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 6 Machine Equipment Power Requirements.
Compaction and Stabilization Equipment
Trimble GCS900 Dual Antenna System Why Trimble uses a Dual Antenna Solution and why it is the better solution?
Lecture 2 Introduction to Earthmoving
Planning for Earthwork Construction
SHOVELS.
1. 2 Civil Engineering Practice Introduction Instructor: Dr. Attaullah Shah Lecture # 1 Department of Civil Engineering Swedish College of Engineering.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 7 Dozers.
ESTIMATING EARTHWORK DR. Nabil Dmaidi.
OUTPUT AND COSTS 10 CHAPTER. Objectives After studying this chapter, you will able to  Distinguish between the short run and the long run  Explain the.
Soil And Rock General Soil Characteristics Trafficability – ability of soil to support weight of vehicles under repeated traffic –Controls traffic on unimproved.
Bradshaw Model. Upstream Downstream Discharge Occupied channel width Channel depth Average velocity Load quantity Load particle size Channel bed roughness.
BY B.JITHENDRA KUMAR Shaper Machine. Introduction The shaping machine is used to machine flat metal surfaces especially where a large amount of metal.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 5 ESTIMATING EARTHWORK.
Obtaining Moving Cycle Times ©Dr. B. C. Paul 2000 revised 2008 Note – The methods shown in these slides are adapted to use FPC, a program produced by.
Dr. Subhash Technical Campus
Inclined Plane, Wedge, and Screw
Inclined Plane, Wedge, & Screw
Inclined Plane, Wedge, & Screw
Mechanical Advantage and Efficiency
CONSTRUCTION METHODS & TECHNOLOGY
TRUCKS & HAULING EQUIPMENT
Lecture 7 Excavators TSP-308 MPK Ferdinand Fassa.
Lecture 6 scrapers TSP-308 MPK Ferdinand Fassa.
CONSTRUCTION EQUIPMENT MANAGEMENT
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Inclined Plane, Wedge, and Screw
Inclined Plane, Wedge, and Screw
Inclined Plane, Wedge, & Screw
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Inclined Plane, Wedge, & Screw
Inclined Plane, Wedge, and Screw
Presentation transcript:

Lecture 5 Dozer TSP-308 MPK Ferdinand Fassa

OUTLINE Introduction Dozer Performance Characteristics Classified on the basis of running gear Blade Dozer Function Dozer Production Estimating Dozer Safety

Introduction A dozer is Tractor unit that has blade attached to push material from one location to another. It is designed to provide for drawbar work. The amount of material the dozer moves is dependent on the quantity that will remain in front of the blade during the push.

Introduction (2) Machine used to push or pull objects / material by means of mounted attachment or drawbar Function To doze dirt To push or pull (add traction - drawbar) moving equipment To pull ripper

Dozer Performance Characteristics (2) Dimension & Dozing Position PITCHING TILTING ANGLING

Dozer Performance Characteristics Classified on the basis of running gear: Crawler type Wheel type Crawler Dozer Wheel Dozer Work on variety of soil Good on firm soils and concrete Work over almost terrain Best for level and downhill work wet weather Good for short work distances Good for long travel distances Can handle tight soil Best in handling loose soils Slow return speeds, 5-10 mph Fast Return speeds, 8 -26 mph Can push large blade loads Can handle only moderate blade loads

Dozer Performance Characteristics (3) Dozer Function Stripping Backfilling Spreading

Dozer Production Estimating Dozing Productivity Blade volume, Vb = 0.8HWL Production, Pb = (Vb)/(Tp + Tr + Tm) H = height of pile of dirt at the inside edge of each track W = width of pile at the inside edge of each track L = length of dirt pile  width of blade Tp = time to push (doze) Tr = time to return (usually backward in reverse) Tm = time to maneuver H1 H2 W1 W2 L

Estimating Dozer Production Total Cycle Time = Fixed Cycle Time + Variable Cycle Time Dozer Production = (Blade Capacity * Efficiency)/ Total Cycle Time

Estimating Dozer Production Fixed Cycle Time: Maneuver, Gear Change, Loading & Dumping.

Estimating Dozer Production Variable Cycle Time: Doze & Return.

Dozer Production

Dozer Production Example A power-shift crawler tractor has a rated blade capacity of 10 LCY. The dozer is excavating loose common earth and pushing it a distance of 200 ft. Maximum reverse speed in third range is 5 mph. Estimate the production of the dozer if job efficiency is 50 min/h.

Dozer Production Example Fixed Time = 0.05 min (Table slide 22) Dozing Speed = 2.5 mph (Table slide 23)

The machine in example above has an Owning & Operating cost of $ 40 The machine in example above has an Owning & Operating cost of $ 40.5 per hour. Operator in the area where the proposed work will be performed are paid a wage of $ 15.5 per hour. What is the unit cost for pushing the material?

Job Management ~ Techniques Downhill Dozing Minimal grade resistance Blade load is increased Reduces cycle times Slot Dozing Shallow trench or path cut between loading and dumping areas to increase the blade capacity that can be carried on each cycle. As much as 50% increase in capacity. Blade-to-Blade Dozing Combined capacity is greater than each separately. Can be mechanically coupled for large jobs.

Slot Dozing

Blade to Blade Dozing

Practice Dozing performed at a slow speed 2 mph. Return speed Is 4 mph whit maneuve time is about 0.05 min. The dozer is excavating loose common earth and pushing it a distance of 95 ft. A track dozer can push an average blade load 7 lcy. Owning & Operating cost of $ 50 per hour. Operator in the area where the proposed work will be performed are paid a wage of $ 12 per hour. Q..? What production in loose cubic yard can be expected? Assume a percent swell of 0.25 and a job efficiency equal to 45 min per hour. What is the actual production that can be expected in bank cubic yard..? What is the unit cost for pushing this material?

Practice Answer

Practice (2) Answer

Thank You