A Draft Funding Model for the SKA

Slides:



Advertisements
Similar presentations
SKA New Technology Demonstrator Ray Norris CSIRO Australia Telescope National Facility.
Advertisements

SAR Overview Business Case Review Logical SARPhysical SAR Implementation Review 1.
SADC HPC Workshop, 2 Dec 2013, Cape Town
1 RESEARCH INFRASTRUCTURES Synergy in using FP7 and SFs for the development of Research Infrastructures Warsaw, 13 February 2006 Hervé Pero, European Commission.
Paul Alexander DS3 & DS3-T3 SKADS Review 2006 DS3 The Network and its Output Data Paul Alexander.
SKA South Africa Overview Thomas Kusel MeerKAT System Engineering Manager April 2011.
ASKAP Central Processor: Design and Implementation Calibration and Imaging Workshop 2014 ASTRONOMY AND SPACE SCIENCE Ben Humphreys | ASKAP Software and.
DVA-1 Project Management Proposal Chris Langley, NRAO 1 US SKA Consortium Meeting - DVA-1 Project Management Proposal June 3-4, 2010.
March 2009LOFAR MKSP Update: SKA and PrepSKA Paul Alexander.
Research Infrastructures The Research Infrastructures in FP7.
SKA Pre Construction Phase Infrastructure Tracy Cheetham Carel van der Merwe General Manager: Infra & Site OpsInfrastructure System Engineer
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
INFRA:DISH = DISH INFRA: LFAA = LFAA INFRA:SDP = SDP INFRA:CSP = CSP INFRA:SADT = SADT INFRA:MGR = MGR INFRA:AIV = No IF? Infra ICD Leads.
Ocean Observatories Initiative Common Execution Infrastructure (CEI) Overview Michael Meisinger September 29, 2009.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
Andrew Faulkner1 Technology Readiness Levels 4 th SKADS Workshop, Lisbon Technology Readiness Levels TRLs Andrew Faulkner.
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
Rosie Bolton1 SKADS Costing work 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS Costing work: Spreadsheets to scalable designs Rosie Bolton Dominic.
Andrew Faulkner1 SKADS and SKA 4 th SKADS Workshop, Lisbon SKADS and SKA Andrew Faulkner.
1 Support for New Research Infrastructures in the EU 7 th Framework Programme for Research Elena Righi European Commission SKADS Workshop, Paris, 4 September.
IIIrd SeaSearch Full Group Meeting Limassol, Cyprus Tuesday May 25-27, 2004 SeaDataNet-Design Study proposal.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
2 nd convergence workshop: introduction R. T. Schilizzi Penticton 22 July 2004.
AAs in PEP Jan Geralt Bij de Vaate. PEP Project Execution Plan for the pre construction phase of the SKA Consortium to be formed AA-low ready for construction.
SKA System Design Kobus Cloete 9 December 2010 AAVP Workshop "Exploring the Universe with the world's largest radio telescope"
Piemonte Workshop 1 11 September 2006 Paolo Salieri European Commission DG ENTR-H4 Security research in FP7.
CASS, Marsfield Phil Diamond 4 October 2011 SKA Pre-Construction Phase: Where we are, and what we’re trying to achieve ?
Peter Wilkinson1 Conclusions 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS aims to –Demonstrate SKA Scientific Viability and Readiness –Demonstrate.
Peter Wilkinson SKADS Workshop: Paris 10 October nd SKADS Workshop: Introduction “What is it about?” Peter Wilkinson University of Manchester.
1 - RAP-11/17/08 SSEC Agenda Suggestions Preparations for SSEC2 at Cape Town Bob Preston.
FASR Software Considerations Gordon Hurford SSL AUI – August 2007.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
P.NapierEVLA Advisory Committee, 11 June EVLA Phase II Implementation/Funding P. Napier.
Australian SKA Pathfinder (ASKAP) David R DeBoer ATNF Assistant Director ASKAP Theme Leader 06 November 2007.
Roshene McCool1 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Local Oscillator distribution over fibre Roshene McCool SPDO – Signal.
Roshene McCool SKADS Workshop 2007 DS3 – T1 Network Infrastructure and Data Transmission Roshene McCool Simon Garrington University of Manchester.
The North America Array Technology Development and the Realization of the SKA-High Steven T. Myers & Jim Ulvestad NRAO 15 Oct 2009 USSKA Consortium Meeting.
UlvestadEVLA Advisory Committee Meeting September 6-7, Future EVLA Operations Jim Ulvestad.
Paul Alexander 2 nd SKADS Workshop October 2007 SKA and SKADS Costing The Future Paul Alexander Andrew Faulkner, Rosie Bolton.
Atacama Large Millimeter/ submillimeter Array - ALMA ASAC Charges For Oct 31 ASAC Report to ALMA Board Al Wootten JAO Interim Project Scientist.
Rosie Bolton 2 nd SKADS Workshop October 2007 SKADS System Design and Costing: Update and next steps Rosie Bolton University of Cambridge.
Square Kilometre Array eInfrastructure: Requirements, Planning, Future Directions Duncan Hall SPDO Software and Computing EGEE 2009.
Paul Alexander1 DS3 Deliverable Status 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DS3 Deliverables Review.
Report to the ASC on project organization and critical issues E. Migneco ASC meeting, Amsterdam, march
FP6 and research infrastructures Main instruments Integrated infrastructure initiative (I3), several M€/year, 4-5 years communication network development,
The North America Array Technology Development and the Realization of the SKA-High Steven T. Myers NRAO 14 May 2009 USSKA Consortium Meeting Washington,
Alessandro Lonardo Referente Locale TT Sezione di Roma 1 Piero Vicini
Integration & Commissioning
IEEE Std 1074: Standard for Software Lifecycle
Capability reporting Francesco Schillirò INAF- OACT
Outcross Resources - Services Overview
Scientific Computing At Jefferson Lab
Jim Cordes Cornell University
Management Breakout: MREFC Budget Summary Victor L
VLA to EVLA Transition Plan
Department of Licensing HP 3000 Replatforming Project Closeout Report
Mark McKinnon EVLA Project Manager
Delta Water Supply Project
WECC 2019 Scenarios – Scoping
Water & Environmental Affairs
SDP Interface Identification
DG Environment, Unit D.2 Marine Environment and Water Industry
Preliminary Project Execution Plan
Job de Kleuver NWO-I/APPEC
Commissioning Data – Who and Why?
FASER LS2 work coordination meeting
Presentation transcript:

A Draft Funding Model for the SKA A Scenario Based on US SKA RFI May 2009

What is a Funding Model? A coordinated, coherent and equitable plan for the allocation and optimisation of funds to construction, operation and ultimately decommissioning of the SKA

Scope An option based on the US SKA RFI* Integrates US SKA RFI and Astronet Infrastructure Roadmap Phase 3 and decommissioning not in scope Assumes 2014 site infrastructure construction start * US SKA RFI submitted to the US Decadal Review Board in April 2009

Funding Proposal Construction Phase Capital Cost €1670 M (Phase 1+Phase 2) Phase 2 - 1/3 Split among Europe, Rest of World and USA Phase 1 – Europe assumes 60% costs Phase 1 – Host assumes 20% costs Post PrepSKA Phase added Phase 1 Construction starts 2015 Contingency costs included [Insert link on wiki to view spreadsheet]

Timelines interposed Proposed SKA Timeline Feb 2009 Phase 1 funding request Phase 2 funding request External Engineering Review of design SSEC Site Rec SKA-mid+low Complete Phase 1 complete Prod. Readiness Review Pathfinder implementation Pathfinder operations Early Science SKA mid+low SKA Ops 06 | 08 | 10 | 12 | 14 | 16 | 18 | 20 | 22 | 24 | Concept Design System Design Detailed Design, Prod. Eng. &Tool’g Full SKA mid + low construction and commissioning Phase 1 Construction EC-FP7: PrepSKA System design Funding Governance Site Characterisation Mobilisation Infra Plan’g Concept design & for SKA-high System design SKA-hi SKA-high Construct US TDP SKADS Proposed SKA Timeline Feb 2009 06 | 08 | 10 | 12 | 14 | 16 | 18 | 20 | 22 | 24 PrepSKA Post PrepSKA €5 M Phase 1 Phase 2 SKA-high Construct Detailed Design €60 M Costed Design Timeline as described in the US SKA RFI Apr 2009

Construction Civil Works €170 M Main building Small buildings Land acquisition Grading Water Roads Power supply and back-up Security Antennae foundations Power reticulation Antennae and RF Systems Antenna unit cost ~ €160 K Receivers unit cost ~ €40 K Signal Transmission €90 M Trenching Leasing dark fibre lines Monitor and control Clockwork distribution network Signal Processing €100 M Correlator Phase 1 Correlator Phase 2

Construction Software Development €100 M Observation preparation Telescope operations Monitor and control Data handling, storage distribution Calibration and imaging Special data processing Customisable from existing applications Off-the-shelf applications Draws on existing code Requires 1000 Person years or 100-150 people Computing Hardware €150 M Off the shelf ~ €30 M Exaflop scale computer ~ €100 M Data storage and distribution ~ €20 M Data Integration + Testing €70 M 100 people 7 years Project Management + Contingency project management 10% of direct costs Contingency 20% of direct costs

Operations US SKA RFI €150 M/yr: Astronet €10 M/yr for Phase 1 Power €50 M/yr Personnel €50 M/yr Materials & Services* €20 M/yr IFCI IWCI €30 M/yr * Includes leasing dark fibre lines Astronet €10 M/yr for Phase 1 €100 M/yr for Phase 2

Not Known Treatment of Pathfinders Phase 3 costs Time Value of money, currency fluctuations in exchange rates, etc. Power costs

Issues Treatment of in kind contributions pre-construction Selected site capex and opex impact Impact of different governance models Feasibility of capped costs approach