Heidelberg Module Production

Slides:



Advertisements
Similar presentations
Working With Acrylic 1. Acrylic Uses 2. Cutting Acrylic
Advertisements

ATLAS Module building at Glasgow
Module production at Heidelberg Responsibilities: assembly and test of 60 F- modules (5 m) September 28: Series module # 12 finished  20% reached Full.
M. Gilchriese SQP Clearance June 8, M. Gilchriese 2 Overview A1-2 inners have been mounted on backbone An A1-2 outer has been mounted on the backbone.
Scratch Robots Catapult. Premium Quality Junk Modules Catapult – Step 1 Parts: - 8.5” x 11” cardboard - 4”x6” Foamie - 1 Starbucks.
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
TRD Status meeting Münster Clemens Adler TRD ROC Status The long and winding road to production start.
TRD status meeting GSI Clemens Adler TRD (Pre-)Production Status New Results/Experiences Problematic issues Production Plans Timescale.
Polishing the Ferrules Howard Budd Sep Polishing Epoxy on the Ferrule We glued fibers in the 10 ferrules that Dave Warner gave us One problem.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
Scintillating Fiber and Ribbon Production Update Alan Bross MICE CM 16 October 8, 2006.

Embedded Programming and Robotics Lesson 5 Motor Control 1.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
19 Oct NIKHEF update 3 lines of attack: 1)Heating (Mod 30) 3 days at 45 C, 4 days at 48 C Q1: Change in geometry, gas tightness, gain? Q2: Effect.
16-Oct-15S.Movchan Straw manufacturing and QC1 Straw machine status polished anvil new welding configuration software for on-line seam quality control.
G.Sirri – INFN Bologna Videoconf Gluing machine New solution under test: rigid plastic frame instead of lateral tapes and.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
D. Nelson October 7, Serial Power Overview Presented by David Nelson
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
Visit to Heidelberg Loek Ceelie Henk Schuijlenburg.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
WEEK 1 You have 10 seconds to name…
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
19/5/2004LHC-b OTR PRR1 Schedule and Resources Jan Spelt.
Strasbourg status Ring 7 pilot run François Didierjean.
TRD Workshop RomaniaClemens Adler Heidelberg ROC Status Material procurement, Chamber Status TRD workshop Cheile Grandistei, Romania,
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization:
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
Prototype Review November 20, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status anvil new welding configuration software for on-line seam quality control conclusion.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
ELECTRIC VEHICLE PROJECT CAR BUILDING PROCEDURES BY: PIERRE PEASHA CENTENNIAL HIGH SCHOOL BAKERSFIELD, CA.
网上报账系统包括以下业务: 日常报销 差旅费报销 借款业务 1. 填写报销内容 2. 选择支付方式 (或冲销借款) 3. 提交预约单 4. 打印预约单并同分类粘 贴好的发票一起送至财务 处 预约报销步骤: 网上报账系统 薪酬发放管理系统 财务查询系统 1.
Activity report from LNF Panels Soldering tests Production site and tooling status WPC miscellanea (+7 cm layout, cathode costs, aging tests)
ECAL LED monitoring system upgrade status 04/09/20131.
University of Wisconsin
CHAPTER 1 -The pre-insulated air ducting panels
Build-It-blocks Creative Robotics
Status of straw production straw module assembling
Long irradiation at the side
Soldering process 1 Add the soldering material on the soldering pad of speaker in order to solder the wire on the speaker.
Overview of the Frascati Production Facilities
Online Gifts Buy for wishes happy mother's day to yours choice and with happy gifts find here:
Apparel Production Management
Apparel Production Management
Apparel Production Management
Apparel Production Management
Apparel Production Management
Apparel Production Management
Apparel Production Management
Ageing workshop - N.Tuning
Hamburg Bonding Report
Module/Ladder Assembly
Module Production in Brussels
مديريت موثر جلسات Running a Meeting that Works
PRACTICAL ELECTRONICS
Speed, Distance and Time
Fin & Countertop Sample Kit Instructions
Presentation transcript:

Heidelberg Module Production Straw Production: Modification of straw confectioning machine successfully finished: reliable crimping of wire locators optimization of hole production process Significant speed-up: 4 min / straw for cutting etc. 2 min / straw for soldering Production runs full swing (i.e. ~200 straws / week)

Heidelberg Module Production Module-0 finished last week: currently being tested Production of Module-1 has started and is already 60% completed Serial Production has started !! Our goal of 1 module / 7 days seems feasible Biggest worry now: material flow ! Technology: Panel gluing: using glue strips at every at 5 cm from glue thickened with silica power gives excellent results

Heidelberg Module Production