Project Cost Control.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.
Advertisements

© 2011 All Rights Reserved APM Heathrow Branch Meeting 11 th September 2012 Practical Use of Earned Value for Real- time Forecast and Control Nick Brown.
 Costs are planned, measured, analyzed and controlled in terms of project activities.  Expenditure for any activity is incurred evenly over the duration.
1 What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis.
Monitoring and Control Earned Value Management (EVM)
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Introduction -Discussed preparation of the overall plan for the project - as well as its implementation. -The control system quantitatively measures actual.
Chapter 10: Monitoring and Controlling Change
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
November 3, 2002CVEN349 - Maxwell1 Procurement and Materials Management Module 6.2 November 3, 2002.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Chapter 10 Project Monitoring and Control
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
Project Management 6e..
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
1 ev14a Interactive Session 4 u Tuesday, July 17 7pm to 10pm u Build a sqa plan for the dental office software u Assume a 3-person, development team, a.
Chapter 4: Schedule, cost, and situation analysis (pt. 2) ISE 443 / ETM 543 Fall 2013.
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Chapter 15 Cost Control.
King Fahd University of Petroleum & Minerals
EARNED VALUE MANAGEMENT (EVM)
Earned Value Management System (EVMS). Given: –total budget of $100,000 –12 month effort –produce 20 units Status: –spent to date: $64,000 –time elapsed:
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Earned Value SOS section Sp8Jan24ev3. Earned Value Analysis One approach to measuring progress in a software project is to calculate how much.
Earned Value management This presentation is just a short introduction to a few terms and concepts. I am sure there will be training sessions in the next.
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
PREPAREDBY: PREPARED BY: Ahmed Al Tayeb Saed Al Qeshawe Tareq Amen Abdalla Syiam SUPERVISED BY: Dr. Kamalain K. Shaat CHAPTER8: Application Of Controls.
Project Management 6e..
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
MEASURING AND FORECASTING COMPLETION. PROGRESS BY DISCIPLINE.
Earned Value Analysis Tracking Project Progress. Introduction | Components | Project Scenario | Values | Calculations | Forecasts | Summary l What Is.
Project Management Information System What?? Objective: –Record & report relevant information and status of various components of project –Highlight the.
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Schedule Control (Earned Value)
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis.
The Construction Process TimeCost Linked Schedules Linked Estimating Recipes The Building Model: 5D Concept.
Project Management 1 Project Control. Project Management 2 Topics Project Control Status Reporting Earned Value Analysis.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Measuring Progress HNC Project Management. Measuring Schedule Performance Break project tasks up into small work units. Work units that are too large.
Earned Value Analysis by Miles M. Hamby, PhD Copyright©2014 Miles M
Project Monitoring
TOPIC-8B- PROJECT COST CONTROL
PROJECT MANAGEMENT AND CONTROL
Earned Value Management
ENGR 281 Engineering Scholars Program Project Management Life Cycle Overview K. F. Reinschmidt J. L. Frank / Marathon Ashland Petroleum LLC Chair in.
Project Cost Management
Work Packages / Deliverables Completed
By Dr. Awad Hanna Ross Umentum
Progress and Performance Measurement and Evaluation
Earned Value - What is it
An Introduction to Earned Value Performance Measurement
PROJECT COST MANAGEMENT
Earned Value Measures Planned Value (PV) Earned Value (EV)
ENGINEERING MANAGEMENT (GE 404)
فرآيند كنترل پروژه.
Controlling cost.
Earned Value Management
Project - Execution stage
Project Management Life Cycle
Earned Value $$$.
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Chapter 13: Software Project Management
Presentation transcript:

Project Cost Control

Reasons for Project Cost Control PROGRESS PAYMENTS CHANGE IMPACT CONFORMANCE TO PLAN PROJECT FINAL COST PROJECT DATE OF COMPLETION

Project Cost Control Reasons For PLANNING PERFORMANCE MEASURING PERFORMANCE COMPARING ACTUAL AND PLANNED PERFORMANCE ADJUSTING PLANS AS REQUIRED

WORK BREAKDOWN REDUCTION OF COMPLEXITY SHORT PLANNING INTERVALS COST ESTIMATING SIMPLIFICATION COST COLLECTION SIMPLIFICATION COST / SCHEDULING

VARIANCES COST : SCHEDULE : DEVIATION FROM BUDGET. NO CONSIDERATION FOR PLANNED SEQUENCE. SCHEDULE : A COMPARISON BETWEEN PLANNED AN SCHEDULED ACTIVITIES.

100 90 80 70 60 50 40 30 20 10 5 10 15 TIME PERIOD REPORT DATE % COST BAC % COST 100 90 80 70 60 50 40 30 20 10 BCWS BEHIND SCHEDULE AV ACCOUNT. VARIANCE ACWP CV COST VARIANCE TO DATE SV SCHEDULE VARIANCE BCWP (EARNED VALUE) 5 10 15 TIME PERIOD

Progress by DISCIPLINE

ENGINEERING

DRAWING MILESTONES START DRAFT - 20% DRAFT COMPLETE - 65% OFFICE CHECK - 80% OWNER REVIEW - 85% FINAL DRAFT - 90% APPROVAL WITH HOLDS - 95% FINAL OWNER APPROVAL - 100%

DISCIPLINE WGT. VALUE % ESTIMATED DRAWINGS BUDGETED MANHOURS DISCIPLINE CIVIL ARCHITECTURAL STRUCTURAL MECHANICAL PIPING ELECTRICAL INSTRUMENTATION 20 35 50 40 15 200 1250 2500 1500 4000 3000 15000 8.3 16.7 10.0 26.7 20.0 100 TOTAL ENGINEERING VALUE

TOTAL PIPE DWGS. DWGS. IN MILESTONE MILESTONE VALUE % DISCIPLINE % COMPLETE MILESTONE 10 5 50 START DRAFT DRAFT COMPLETE OFFICE CHECK OWNER REVIEW FINAL DRAFT APPRV. W/ HOLDS FINAL APPROVED 20 65 80 85 90 95 100 4.0 6.5 8.0 8.5 9.0 9.5 20.0 TOTAL PIPING DISCIPLINE PROGRESS 65.5

WEIGHTED VALUE PROJECT CONTRIBUTION DISCIPLINE % COMPLETE CIVIL ARCHITECTURAL STRUCTURAL MECHANICAL PIPING ELECTRICAL INSTRUMENTATION 90 70 80 75 65.5 60 50 8.3 16.7 10.0 26.7 20.0 7.5 11.7 6.6 17.4 12.0 5.0 TOTAL ENGINEERING PROGRESS 67.7 %

PROCUREMENT MEASUREMENT

PROCUREMENT MEASUREMENT MATERIAL TAKE OFFS PURCHASE REQUISITIONS PURCHASE ORDERS

FUNCTIONS FUNCTION % WEIGHTED VALUE ESTIMATED QUANTITIES ESTIMATED MANHOURS FUNCTIONS MATERIAL TAKE-OFF (DWGS) PURCHASE REQUISITIONS PURCHASE ORDERS 150 200 100 400 700 26.6 46.7 26.7 TOTAL PROCUREMENT VALUE 1500 100

TAKE OFFS DRAWINGS REQUIRING TO'S DRAWING WITH TO'S COMPLETE PHYSICAL PROGRESS 150 75 50%

PURCHASE REQUISITIONS ESTIMATED PR's 200 PR's APPROVED FOR PURCHASE 50 PHYSICAL PROGRESS 200 50 25%

PURCHASE ORDERS QUANTITY PLACED = 50% DOLLAR VALUE SHIPPED = 50% 28 PO's OUT OF 100 = 14% 1 MILLION DOLLARS EXPLANTED OUT OF 50 MILLI0NS = 1% PHYSICAL PROGRESS = 14 + 1 = 15%

WEIGHTED VALUE PROCUREMENT CONTRIBUTION FUNCTIONS % COMPLETE 13.3 11.7 4.0 MATERIAL TAKE-OFFS PURCHASE REQUISITIONS PURCHASE ORDERS 50 25 15 26.6 46.7 26.7 TOTAL PROCUREMENT PROGRESS 29.0

ESTIMATED MANHOURS WEIGHTED PERCENTAGE MILESTONE MOBILIZATION & GRADE FOUNDATION COMPLETE STRUCTURAL COMPLETE EQUIPMENT ERECTION COMPLETE PIPING COMPLETE ELECTRICAL COMPLETE MECHANICAL COMPLETION COMMISSIONING 2000 4800 3600 5600 1000 6800 5200 5 12 9 14 25 17 13 TOTAL PROJECT VALUE 40000 100

WEIGHTED % % COMPLETE PROJECT CONTRIBUTION MILESTONE MOBILIZATION & GRADING FOUNDATION STRUCTURAL STEEL EQUIPMENT ERECTION 5 12 9 14 100 80 30 10 5 9.6 2.7 1.4 TOTAL PHYSICAL PROGRESS 18.7

TOTAL ENGINEERING PROGRESS

DESIGN/ENGINEERING OVERALL COMPLETE BUDGETED MANHOURS WEIGHTED VALUE % % COMPLETE PROJECT CONTRIBU- TION ENGINEERING PROCUREMENT 15000 1500 90.9 9.1 67.7 29.0 60.6 2.6 TOTAL CONTRACT PROGRESS 16500 100 63.2

PRODUCTIVITY PROFILES

PRODUCTIVITY PROFILES FACTORS AFFECTING PRODUCTIVITY PROFILES PROJECT LOCATION JOB COMPLEXITY WORKING HOURS LABOR DENSITY SUPERVISION QUALITY WEATHER MIXTURE OF NATIONALITIES DISCIPLINE

BUDGET MANHOURS UTILIZED THEORETICAL % BUDGET MANHOURS UTILIZED PRODUCTIVITY 12 23 33 42 50 57 63 76 87 100 1.2 1.1 1.O 0.9 0.8 0.7 0.6 0.5 * * * * * * * * * * 10 20 30 40 50 60 70 80 90 100 PHYSICAL COMPLETION %

CREDIT BY EARNED MANHOURS ORIGINAL ESTIMATE ESTIMATE REMAINING EARNED 2000 MHRS 1000 MHRS