RPC Readiness for installation

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

CMS RESISTIVE PLATE CHAMBERS Lecce, 25 September 2003 Content Barrel single/double gap production and QC Barrel chamber production and QC Barrel production.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
UPDATE ON CMS RESISTIVE PLATE CHAMBERS CMS RPC Barrel Collaboration GR1, 5 Aprile 2004.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT meetings Quite many constrains! 1.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
SunSatFriThursWedTuesMon January
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
ELENA installation progress F. Butin / ELENA collaboration.
SRG Gantt Chart Template
PIXEL CAEN Installation Status
DCFEB Production for LS2
Agenda MC Aug 13.
Feb March April May June July Spiral 1 Spiral 2
Brief Status SPS Prototype PSB Prototype Installed in LS1
Production ad Quality control of RPCs for the CMS muon barrel system
BSS Prep work at CERN and Acceptance of Parts
Working plan for 2017 Acquisition and Control Electronics
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
on behalf of the RF group
LS1 Committee January 24th, 2014
Renovation of the 45-year old PS magnets
Baby MIND beam test status
10/month is the present production rate 2 FTE + sporadic contributions
MicroMegas Mechanical Meeting --- Cern April 2014
CMS RPC Endcap RE1 Status Report
Preparations for test of
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
Installation plans from mid 2005
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
Centralized Classroom and Event Scheduling: Fall 2018
13-block rotation schedule
RPC Detector Control System
Assembled by the Rubicon Forest Protection Group
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
RPC SYSTEM LAYOUT and DIMENSIONS
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
April May April May June July July June August Sept August
TGac Status and Timeline
PBIS Update October 2005.
CNGS horn / reflector in 2005: The story of the glass ring insulator
McDonald’s calendar 2007.
Drift Tubes CSN1 1-2 April 2003 f.gasparini 22/04/2019.
PLANNING LOOKING AHEAD…. Long Term Goals (Assigned to…)
RPC Detector Control System
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
McDonald’s calendar 2007.
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Plans for the 2004 CSC Beam Test
SAME 15 existing quadrupoles (QFS, QDS, QFL)
2015 January February March April May June July August September
Repair campaign 2017 Repair campaign 2016 Repair campaign 2015 TS2 TS1
Presentation transcript:

RPC Readiness for installation New shorter service block has been built. But changing it on the installed chambers was very difficult: in both chambers we broke the gas inlet -Chamber in Sector 10 already replaced (last week). -Chamber in sector 4 to be replaced in April. 4 149 153 150 154 Integration problem 5 142 3 105 108 155 Sector 4 and 10 interference between cable tray and RPC service block 114 141 115 280 157 - 116 269 113 - 283 282 275 44 140 268 6 38 32 144 17 41 41 112 34 2 139 36 8 281 - 270 279 145 43 267 223 48 110 33 out 3 bi gap W +2 184 175 187 138 - 86 59 198 60 109 106 137 63 183 12 8 174 107 111 179 177 180 151 56 152 - 186 82 64 102 65 83 117 - 62 100 118 133 134 103 104 9 - 11 - 123 124 10 Ready for installation Under test Installed Not at ISR

W+2 Production and test : W+2 Production Accept. Italy-Sophia At ISR. Ready for Installation RB4 1 cham. sect.8 (To replace sect. 4) Done March. March April Cham 123 (sect. 10 ) and cham 150 (sect. 4) will be repaired at ISR end of April.

Missing chambers arrive at CERN on 16 March ISR Status: W+1 5 3 146 Sector 4 (chimney). RB2-RB3 at ISR: 21 March RB4-RB1. Assembling in March 05. RB1 Missing chambers arrive at CERN on 16 March RB4 Missing RB4 Under test in Bari. 148 204 18 - 206 76 73 21 - 90 88 143 6 222 225 219 291 31 2 234 273 75 91 87 - 220 221 156 20 224 227 226 3 bi gap out W +1 194 172 182 - 119 39 205 49 67 71 164 52 162 12 27 190 203 202 47 211 235 46 66 - 210 35 93 80 207 53 68 101 - 51 218 10 129 97 130 - 11 - 126 125 10 Under test To be tested Ready for installation Not at ISR

Production and test : W+1 Accept. Italy-Sophia At ISR. Ready RB2 done Sect 6 End of March RB1 3 cham: Sect 5-11-12 March 3 cham Sect 5-11-12 16 March Middle April RB3 1 cham. 21 March Chimney Sect 4 Feb 05 RB3-RB2 March 05 RB4-RB1 March RB3-RB2 April RB4-RB1 21 March End April Middle April Middle May RB4 4 cham: sect 3-5 -6 March April

RB1 3 missing chambers under test in Pavia 4 ISR Status: W0+ 5 3 209 RB1 3 missing chambers under test in Pavia RB3 4 missing chambers at ISR on 21 March RB4 missing RB4 to be tested in Bari - 208 - 274 284 6 122 233 2 169 168 236 11 74 278 271 - 277 16 192 232 Z (+) Face 3 bi gap out W 0 - 12 8 191 188 173 - 95 81 94 99 - 79 132 9 - 11 160 - 158 10 Under test To be tested Ready for installation Not at ISR

Production and test : W0+ Accept. Italy-Sophia Expected At ISR. Ready RB2 Done done Middle May RB1 3 cham. sect 6-10 April End of April . End of May RB3 21 March Middle April RB4 4 cham. sect 2 -3 May End of June

ISR STATUS: W-1 /W-2 sect 10-11 61 290 - 85 3 bi gap 131 201 11 - 161 159 RB1 3 chambers to be built + 4 under test in Pavia RB2 1 chamber to be built RB3 4 chamber under test in Italy RB4 2 chambers to be repaired 10 W -1 Z (-) Face 189 72 54 70 3 bi gap 285 55 288 163 - 128 123 11 Under test 10 To be tested Ready for installation Not at ISR

Production and test :W-1/W-2 Set 10/11 Production Accepted Italy-Sophia Expected at ISR. Ready RB2 1 cham April May June July RB1 3 cham. RB3 done RB4 To be repaired

RPC readiness vs DT schedule: W+2/W+1/W0+ Coupling - Installation W+1 36 DT All chamber but S1/ S 7 and MB4To W0+ 18 DT All but MB4To Middle of May W+2 6 MB4 S 3-5-9-10-11 Ready 9 MB4To W0+ W+1 End of June 3 MB4 W0 + 6 MB4To W+1 18 DT W-1 W-2 S 10/ S11 July RB1s under test. Ready middle of April. Chimney RB2-RB3 ready middle April Chimney RB1-RB4 ready middle May 11 April – 6 May 30 May – 17 June 4 July – 22 July 5 Aug- 23 Aug

Production and test status : W0- 4 3 - - 5 170 333 - 89 2 229 6 236 Z (-) Face 3 bi gap out W 0 231 40 1 96 92 165 - 84 78 166 12 12 8 6 - 212 213 93 289 - 292 9 Under test 11 - To be tested 10 Ready for installation Not at ISR

Production and test : W0- Accept. Italy-Sophia Expected At ISR. Ready RB2 2 cham. Sect 4-9 April May July Aug.-Sept RB1 7 cham: May June 05 Aug-Sept RB3 3 cham. April RB4 done April June

Production and test : W-2/W-1 Very preliminary W-2/W-1 All Production Ready RB2 Start March End ‘05 /Beg ‘06 RB1 Start April RB3 Start Feb RB4