Coordinator’s report . Magdalena Kowalska.

Slides:



Advertisements
Similar presentations
Bericht zu ISOLDE Low-energy precision experiments:
Advertisements

The GATE-LAB system Sorina Camarasu-Pop, Pierre Gueth, Tristan Glatard, Rafael Silva, David Sarrut VIP Workshop December 2012.
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Magdalena Kowalska, CERN PH-SME-IS ISOLDE scientific coordinator’s report ISCC meeting, July 6, 2011 Beam requests and schedule 2011 Experimental statistics.
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
ISCC 24 May 2004L.M. Fraile L.M. Fraile, CERN PH/IS ISOLDE scientific coordinator’s report ISOLDE Collaboration Committee 24 th May 2004 ISOLDE scientific.
Catlyn Colson. Recap of Previously Completed Work Previously I had done the following: Built the Database, started basic layout of the webpage, connected.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
January 27, 2010 Sunflower Project Monthly Conversion Meeting – January.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
K. Riisager, TA8 ISOLDEEURONS PCC-Meeting, Mainz (Germany), April 2006 Recent highlights from ISOLDE News from the facility –Users meeting, February.
Physics coordinator report: Shifts 2014 Schedule 2015 Access, safety and courses b508 and 275 Magdalena Kowalska.
Compressor status AWAKE Technical Board meeting 19 August 2015.
B508 and 275 Magdalena Kowalska. b275 2 AEGIS laser lab ASACUSA test setup g-BAR? Storage of big parts, test stands? Test setups SSP, detector labs Electronics.
News, plans, wrap-up -- CLIC workshop, Febr. 5 th Lucie Linssen, CLICdp, wrap-up, February 5th Lucie Linssen.
ISOLDE Workshop and Users meeting 2011 Nanostructured Calcium Oxide Targets for the Production of Argon Beams João Pedro Ramos 7 th of December 2011 Dr.
L.M. Fraile, CERN PH/IS ISOLDE scientific coordinator’s report INTC meeting, 15 February 2007 ISOLDE scientific coordinator’s report INTC meeting, 15 February.
ISOLDE Physics Coordinator Report Schedule Access to the hall Visits b275 and b508 Magdalena Kowalska.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
Scheduling News. Magdalena Kowalska. Injector schedule since last meeting 2 Confirmation of 2 week proton prolongation – until December 17 th : 35 ->
ISOLDE Physics Report Magdalena Kowalska. Injector schedule since last meeting 2 September: confirmation of 2 more weeks with protons – until December.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Last years of the SC-ISOLDE and move to the PS-booster H. Haas CICECO, Universidade de Aveiro, Aveiro, Portugal and CERN/PH-IS, CH-1211 Geneve-23,
ENSAR : European Nuclear Structure and Application Research Maria J. G. Borge.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
ISOLDE PH report Schedule 2012 Physics results 2012 Experiments, users New template Safety Long shutdown PH and ENSAR news Magdalena Kowalska Yorick Blumenfeld.
REXTRAP plans for 2005 And future developments Pierre for the REX TEAM, REX’s day, 11/03/2005.
Magdalena Kowalska, CERN PH-SME-IS ISOLDE scientific coordinator’s report ISCC meeting, November 4, 2010 Running period 2010 Status of INTC shifts Accelerator.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
Redesign/ Change Management Team 3. Point of Actions  Joint Application Design (JAD) session (2 weeks)  Representatives from each department  Overview.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, February 11, 2008 ISOLDE scientific coordinator’s report INTC meeting, February.
Schedule Access to the hall b508. Magdalena Kowalska.
NA61/SHINE run schedule/plans:
and Attachments Communicating Information and Attachments.
PH Department News Discussion with management
INFORMATION AND TRAINING FOR END USER
Welcome! The Welcome Back webinar will begin in a few moments
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
ISOLDE physics & technical report: INTC 8th Feb 2017
SCHEDULE Nov 1st - Assembly Table Complete
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
ISOLDE PH report Schedule 2012 Physics results 2012 Experiments, users
Welcome! The 1/25 COP call will begin in a few moments.
Alexander Herlert, CERN (PH-SME-IS)
Difficult beams accepted in 2014 (updated since last meeting)
A. Herlert, CERN PH-SME-IS
ReCAP Data Part 4: EDD (Electronic Document Delivery)
Magdalena Kowalska, CERN PH-SME-IS

Scheduling News . Magdalena Kowalska.
Magdalena Kowalska, CERN PH-SME-IS
A. Herlert, CERN PH-SME-IS
Junior Spring/Summer College Workshop 2018
Thomas Nilsson, CERN EP/IS
Magdalena Kowalska, CERN PH-SME-IS
Network of Judicial Registers
Present and Future test facilities for High-intensity Targetry CERN
Mats Lindroos for The ISOLDE team
Thomas Nilsson, CERN EP/IS
New procedures 2013: registration access
INTC matters . Magdalena Kowalska.
Magdalena Kowalska, CERN PH-SME-IS
A. Herlert, CERN PH-SME-IS
Project Progress Summary - Week 18
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Alexander Herlert, CERN (PH-SME-IS)
Presentation transcript:

Coordinator’s report . Magdalena Kowalska

Shifts 2012 Shift balance: 1009 open shifts for IS experiments, 53 shifts for LOIs Shift requests: 833 shifts for 71 IS exp vs 657.5 in 2011; 40 shifts for 14 LOIs 20 IS experiments with no beam requests REX requests: 377.5 shifts (IS + LOIs) Scheduled 2012 2011 Weeks with protons 37 29 All shifts (IS+LOI+MD) 565 491.5 Shifts for IS exp 539 440 Shifts for LOIs 26.5 31.5 # of IS exp 51 61 # of LOIs 10 8 REX runs / exp 11 / 17 10 / 14 REX shifts (IS +LOI) 221.5 190.5 Average shifts/day 2.08 2.31 Delivered 2012 2011 Protons 11.5e19 8.05e19 All shifts (IS+LOI+MD) 529 463.5 Shifts for IS exp 416 313.5 Shifts for LOIs 15.5 16 REX shifts (IS +LOI) 221.5 190.5 Average IS shifts/day 1.61 1.55

Delivered shifts 2012

Delivered shifts 2011

Remaining shifts Low-energy IS experiments (including WITCH): 364.5 shifts Post-accelerated REX experiments: 216.5 shifts HIE-ISOLDE shifts (Oct12): 429 shifts

Physics since last meeting & LS1 New method and groups - incomplete fusion with T-REX: Milano & Cracow TISD: CaO-Helicon (on GPS) to produce C and possibly Ar beams The only WITCH run this year 44Ti for astrophysics (GPS): 44Ti source from PSI, setup behind REX Mn for COLLAPS (Manchester) and some SSP users Hg for TAS (1st run since a few years) and priority collections 11Be which failed in the summer LS1 times: Protons to ISOLDE: from June 16, 2014 Protons stop on December 15, 2014 Protons back to ISOLDE – April 2015 (very preliminary)

ISOLDE publications CERN library encourages us to create an ISOLDE “space” in CDS (CERN Document Server) Their team can find Theses and INTC documents, But our experimentalists would need to register their articles (small work for each experiment, but large if everything done by one person) Follow-up that ISOLDE theses are put in CDS Acknowledgements in articles?

CERN Bulletin about ISOLDE

Website layout Help from CERN communications team to make ISOLDE website CERN-standard Our responsibility: copy content and keep it up to date (easier than now)

New CERN website