EVLA Racks Bins and Modules PDR

Slides:



Advertisements
Similar presentations
Preliminary Design Review EVLA 1 st and 2 nd Local Oscillators.
Advertisements

Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Glenair Micro-D Connectors: New Product Offerings.
Author George Peck EVLA Hardware Monitor and Control PDR March 13, APPLICATIONS AND DEVICE INTERFACE ISSUES.
DATA TRANSMISSION SYSTEM MIKE REVNELL. OUTLINE Top level specifications Basic architecture Fiber plant DTS module Digitizers Formatter Deformatter Transition.
EVLA SAMPLERS " High speed wide band 3-bit for most bands " Lower speed narrower band 8-bit for bands with RFI. 1.
40m Suspension Electronics Benjamin Abbott California Institute of Technology 10/18/01 G R.
E. Hazen, Boston University BU Meeting, Apr. 6, 2001 Front-end Readout of the CMS Hadronic Forward Calorimeter (HF) Conceptual Design (Summary) by Eric.
3/5/2007(c) 2007 UEI Inc.1 Design Review United Electronic Industries DNR-12 -3U 12 DNA Rack With CPU/NIC Enclosure.
Multi-beam Patch Antenna Design Mustafa Konca Supervisor: Prof. Dr. Sener Uysal.
Click to edit Master subtitle style Chapter 3: Networking Topologies, Connectors and Wiring Standards Instructor:
SJD / TAB1 Fiber Tasks Preliminary Design Review December 5, 2001.
ZTF Interconnecting Scheme Stephen Kaye
Bob Hayward Receiver Engineer Feed & Front End PDR Feb Feed & Front End PDR Monitor & Control and Cryogenics.
SJDLO/IF/FO - May 19-20, Production & Maintenance Steven J. Durand Thursday - May 20, 2004.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Racks, Bins & Modules PDR Paul Harden 17 June 2002 EVLA Vertex Room ( and other mechanical considerations) This file has been modified from the original.
Author Bob Broilo EVLA Hardware Monitor & Control PDR March 13, ANTENNA SERVO AND SUBREFLECTOR CONTROLLER.
Physical Transmission
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
James Robnett EVLA M&C Hardware PDR March EVLA M&C Hardware PDR Voice Communications.
Jim RuffAntennas & Feeds PDR 2/12/02 1 Antennas & Feeds Mechanical Design Feed Cone Feed Mounting Horn Fabrication.
Jim RuffAntennas & Feeds CDR 2/17/05 1 EVLA Feed Cone Current Status Feed Circle Layout Structural Design Feed Mounting Feed Heaters Cost.
Wayne M. KoskiEVLA Front-End CDR – EVLA Receiver Monitor & Control April 24, EVLA Front-End CDR EVLA Receiver Monitor & Control F317 and F320 Modules.
SJDAdvisory Committee Dec Production & Maintenance Steven J. Durand December, 2004.
Bob Hayward Receiver Engineer Feed & Front End PDR Feb Feed & Front End PDR Q, Ka, K, Ku & X-Band Receivers Backup Slides.
Dan MertelyEVLA Feeds CDR 17 February RFI Concerns Relating to EVLA Feeds Dan Mertely.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Paul Harden VLA Veteran EVLA LO-IF PDR 22 January EVLA IF/LO EVLA “LOW BAND” CONVERTERS For 4/P/L/S/C and Ku Bands.
Network infrastructure for CERN DataCenter HEPiX Fall 2015.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
CLARITY MATRIX FIBER VIDEO EXTENSION October 2015.
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Slot – ID.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Monitor & Control Transition.
RF over Fiber - Application Riedel solutions for broadcast applications 1 Application Examples – RF over Fiber.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
Single Cryocooler 1.2 to 116 GHz Receiver for ngVLA S. Weinreb, A. Soliman, and H. Mani July 30, Rationale 2.Synergistic Reflector Design 3.Dewar.
Future LBO Developments
Cosmic Microwave Technology, Inc.
NSG 4070 Signal generator and immunity test system Dr. Heinrich
Data Center Network Topologies
EVLA Project Peter Napier
Production & Maintenance
EVLA Advisory Committee Meeting System Status
EVLA NSF Mid-Project Review System / Antenna Status
EVLA NSF Mid-Project Review System / Antenna Status
Terry Cotter LO/IF Group Leader
LO/IF System Requirements
Budget, Schedule, Contingency
EVLA LO/IF Racks/Bin/Modules
EVLA System PDR System Overview
EVLA M/C Software PDR, 14 May 2002
EVLA Receivers PDR Transition Planning Author Daniel (Mert) Mertely
DAQ Racks, Bins and Modules Internal Design Review
Terry Cotter LO/IF Group Leader
Terry Cotter LO/IF Group Leader
EVLA Advisory Committee Meeting System Status
PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem.
Background Information P.Napier
A. To reduce television interference B. To reduce signal loss
Correlator Growth Path
EVLA Advisory Committee Meeting System Status
Safety, reliability and maintainability
EVLA Advisory Panel Mtg. System Overview
Presentation transcript:

EVLA Racks Bins and Modules PDR Jim Jackson 2/24/2019 EVLA RBM PDR 17 June 2002

What will be covered? Vertex room layout Vertex room LO/IF rack/bin/module designs CEB LO/IF rack/bin/module designs Digitizer/IF DTS rack/bin/module designs Antenna MCB rack design Vertex room fiber optic patch panel Jim Jackson 2/24/2019 EVLA RBM PDR 17 June 2002

Considerations Top Priority – minimize self generated RFI Cooling Ease of maintenance Cost Connectors Jim Jackson 2/24/2019 EVLA RBM PDR 17 June 2002

RFI Shielding of racks/bins and modules New packaging design for high speed digital Improved shielding of IF/LO electronics Filtering of power and control signals Use of honeycomb filter materials Use of fiber optics Jim Jackson 2/24/2019 EVLA RBM PDR 17 June 2002

RFI Shielding of vertex room New feed cone Modifications to walls and floor Door gaskets Cable penetrations HVAC penetrations L-band feed penetrating floor Jim Jackson 2/24/2019 EVLA RBM PDR 17 June 2002

Cooling Use of honeycomb filter materials Use of solid extruded heatsinks Flomerics Flotherm software Modeling of airflow in racks and modules Identifies potential hot spots Jim Jackson 2/24/2019 EVLA RBM PDR 17 June 2002

Maintenance Tradeoffs between RFI integrity and easy access Blind mate connectors on LO/IF modules No blind mate connectors on Digitizer/IF DTS MCB routers/switches Jim Jackson 2/24/2019 EVLA RBM PDR 17 June 2002

Cost Use of extrusions where possible New blind mate connectors on modules Existing VLA connectors very expensive or obsolete Reuse of some hardware Bins CEB racks Jim Jackson 2/24/2019 EVLA RBM PDR 17 June 2002

Connectors Blind Mate Others connectors Coax: OSP (same as VLBA and ALMA) Data/Power: D-SUB or military style D-SUB is current default (ALMA and ATNF) Other styles still being researched Others connectors As required Jim Jackson 2/24/2019 EVLA RBM PDR 17 June 2002