FUTURES INDUSTRY BUSINESS CONTINUITY AND DISASTER RECOVERY 2010 INDUSTRY TEST RESULTSDR VII November 2010 Compiled and Developed by Tellefsen and Company,

Slides:



Advertisements
Similar presentations
The Why, What and How of Disaster Recovery Plan Testing Presented By: Ed Deveau.
Advertisements

GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Yokogawa Network Solutions Presents:
IT RISK MANAGEMENT BEST PRACTICES TOOLS AND PROCEDURES Prepared For Futures & Options Expo A Panel Discussion --
FUTURES INDUSTRY BUSINESS CONTINUITY AND DISASTER RECOVERY 2007 INDUSTRY TEST RESULTSDR IV November 5, 2007 Compiled and Developed by Tellefsen and Company,
1 The interconnection of business registers Judit Fischer – DG Internal Market and Services Budapest, 14 June 2010.
How to commence the IT Modernization Process?
Creating and Submitting a Necessary Wayleave Application
Copyright Hub Software Engineering Ltd 2010All rights reserved Hub Document Exchange Product Overview Secure Transmission for Transaction-based Documents.
S.NO.COMPARISON BETWEEN SAFEKHATAOFFLINE ACCOUNTING SOFTWARE 1 Completely hosted accounting information in the cloud Susceptible to computer/server.
Copyright© JSE Limited Project Orion Release C Market Communication Session 17 August 2007 Leanne Parsons.
CCNA – Network Fundamentals
Controlling the Future A look into governing the Futures Market Russ Deboodt BA 543 May 18, 2011.
ITS Offsite Workshop 2002 PolyU IT Security Policy PolyU IT/Computer Systems Security Policy (SSP) By Ken Chung Senior Computing Officer Information Technology.
Hands-On Microsoft Windows Server 2003 Networking Chapter 7 Windows Internet Naming Service.
By Saurabh Sardesai October 2014.
Electronic Data Interchange (EDI)
Lesson 19 Internet Basics.
Business Continuity & Disaster Recovery Planning at The Chicago Board of Trade Presented By: Bryan Durkin Sr. Vice President The Chicago Board of Trade.
Topics OATS Overview, Rules and Reporting Obligations Order Reports
TELLEFSEN AND COMPANY, L.L.C. SEC Regulation SCI and Automation Review Policy Compliance March 2013 Proprietary and Confidential.
Network security policy: best practices
MSF Testing Introduction Functional Testing Performance Testing.
Futures Industry Disaster Recovery Test Briefings June 6, 2012 “DR IX” Prepared and Moderated by John Rapa, CBCP Tellefsen and Company, L.L.C.
Lawson System Foundation 9.0
The BIM Project Execution Planning Procedure
November 2009 Network Disaster Recovery October 2014.
CME FIXML Initiatives © Chicago Mercantile Exchange Inc. All rights reserved. 2 CME FIXML Projects 2004  FIXML 4.4 Positions Services API (Currently.
Futures Industry Disaster Recovery Test Briefings June 19, 2012 “DR IX” Prepared and Moderated by John Rapa, CBCP Tellefsen and Company, L.L.C.
Futures Industry Disaster Recovery Test Briefings September 16, 2010 “DR VII” Prepared and Moderated by John Rapa, CBCP Tellefsen and Company, L.L.C.
Futures Industry Disaster Recovery Test Briefings June 2007 “DR IV” Prepared and Moderated by John Rapa, CBCP Tellefsen and Company, L.L.C.
TESTING STRATEGY Requires a focus because there are many possible test areas and different types of testing available for each one of those areas. Because.
Roles and Responsibilities
Futures Industry Disaster Recovery Test Briefings September 22, 2009 “DR VI” Prepared and Moderated by John Rapa, CBCP Tellefsen and Company, L.L.C.
PAR CONFERENCE Homeland Defense A Provider’s Perspective Lessons from TMI Dennis Felty November 15, 2001.
ADC Meeting ICEO Standards Working Group Steven F. Browdy, Co-Chair ADC Workshop Washington, D.C. September, 2007.
Futures Industry Disaster Recovery Test Briefings June, 2009 “DR VI” Prepared and Moderated by John Rapa, CBCP Tellefsen and Company, L.L.C.
E-TRADING SYSTEMS UPDATE November 2003 THE FIA IT DIVISION THE FIA IT DIVISIONPRESENTS FIA Expo Conference FIA Expo Conference.
THE FIA INFORMATION TECHNOLOGY DIVISION Presents A Multi-Panel Forum March, 2003 FIA Boca Conference Prepared By Tellefsen Consulting Group, Inc.
SEC Regulation SCI Automation Review Policy Compliance December 2014 Proprietary.
Information Availability Brett Paulson Sr. VP and Chief Information Officer Board of Trade Clearing Corporation FIA – November 7, 2002.
Immunization Data Exchange (BYIM v 2.0*1) Transporting the Message to the IIS Nathan Bunker & John Parker Updated 08/05/2011.
Futures Industry Disaster Recovery Test Briefings June 8, 2011 “DR VIII” Prepared and Moderated by John Rapa, CBCP Tellefsen and Company, L.L.C.
What Standards Can Do For You FIA IT Standards Working Group December 10, 2002.
Computer Emergency Notification System (CENS)
Exploring Office 2003 – Grauer and Barber HTML And Basic Web page.
Futures Industry Disaster Recovery Test Briefings September, 2007 “DR IV” Prepared and Moderated by John Rapa, CBCP Tellefsen and Company, L.L.C.
Business Continuity Program Orientation (insert presentation date) (This presentation is a template that requires adjustments to meet your needs)
1 THE FIA IT DIVISION PRESENTS REDUCING TRADING COSTS A PANEL DISCUSSION Moderated By: Moderated By: 2003 FIA Expo Tellefsen Consulting Group, Inc.
Chicago Board of Trade  The World’s Leading Futures Exchange sm Chicago Board of Trade  The World’s Leading Futures Exchange sm FIA presentation November.
HP Enterprise Services HomeTown Health Presentation July 7, 2010 Partnering for Success!
Situation of ANA data and metadata in 2008 Transmission to the OECD : progress report.
Futures Industry Disaster Recovery Test Briefings June, 2008 “DR V” Prepared and Moderated by John Rapa, CBCP Tellefsen and Company, L.L.C.
Consultative process for finalizing the Guidance Document to facilitate the implementation of the clearing-house mechanism regional and national nodes.
1 Encore Data Distribution Services Workshop February 19, 2004.
Compliance Monitoring and Enforcement Audit Program - The Audit Process.
TrainingRegister® Training Management Software Maintain Permanent Training Records for Each Individual Monitor and Track Required Training Know Who Needs.
NERC Lessons Learned Summary LLs Published in September 2015.
Futures Industry Disaster Recovery Test Briefings June, 2009 “DR VI” Prepared and Moderated by John Rapa, CBCP Tellefsen and Company, L.L.C.
Futures Industry Disaster Recovery Test Briefings July 11, 2007 “DR IV” Prepared and Moderated by John Rapa, CBCP Tellefsen and Company, L.L.C.
Business Continuity Planning for OPEN OPEN Development Conference September 18, 2008 Ravi Rajaram IT Development Manager.
Role Of Network IDS in Network Perimeter Defense.
1 Options Clearing Corporation Encore Data Distribution Services April 22, 2004.
Roles and Responsibilities
Instructor Materials Chapter 5 Providing Network Services
CCNA Routing and Switching Routing and Switching Essentials v6.0
Chapter 10: Device Discovery, Management, and Maintenance
CCNA Routing and Switching Routing and Switching Essentials v6.0
Chapter 10: Device Discovery, Management, and Maintenance
Contract Requirements for Suppliers
Presentation transcript:

FUTURES INDUSTRY BUSINESS CONTINUITY AND DISASTER RECOVERY 2010 INDUSTRY TEST RESULTSDR VII November 2010 Compiled and Developed by Tellefsen and Company, L.L.C.

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS I. I.Background3 II.Executive Summary7 III.Overall Test Results10 IV.Problems Encountered24 V.Lessons Learned27 VI.Suggested Next Steps31 TABLE OF CONTENTS Page Number:

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS The FIA Information Technology Division conducted the first annual Disaster Recovery (DR) Test in October Starting in Q1, 2010, the FIA Business Continuity Committee began detailed preparations for this years seventh annual industry-wide test. A Working Group was convened to discuss and agree on a date, goals, objectives, etc. I.BACKGROUND

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS Two futures Industry BC/DR symposiums were held in June and September in New York and Chicago. Panelists included representatives from the major exchanges and clearinghouses: CBOE Futures Exchange Chicago Climate Futures Exchange CME Group (CBOT, CME, NYMEX, COMEX) CME Clearing ELX Futures ICE Exchanges ICE Futures US ICE Clear US ICE Clear EU International Derivatives Clearing Group Kansas City Board of Trade KCBT Clearing Corp. MEFF Minneapolis Grain Exchange Bourse de Montreal Options Clearing Corp. BACKGROUND (Contd) …

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS The scope of this years initiative was designed to test disaster recovery back-up connectivity and functionality between exchanges, clearinghouses and member firms: – –Test firm back-up to exchange back-up sites (DR-DR). – –Verify connectivity. – –Test round-trip communications capabilities. The symposium sessions were well attended by numerous operations managers and BC/DR representatives from various clearing and non-clearing firms. Regular Committee conference calls were held between May and October (bi-weekly and weekly). BACKGROUND (CONTD) …

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS The Committee including representatives from: – –Clearinghouses – –Exchanges – –FCMs – –Clearing firms – –Non-clearing firms – –Key service providers – –Independent software vendors Post-test interviews with firms and survey forms were used to fine tune the results. BACKGROUND (Contd) …

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS The seventh annual industry-wide disaster recovery test in the U.S. financial services sector was highly successful, largely in part to the good working relationship between exchanges and the firms. Major U.S. and international futures exchanges, clearinghouses, FCMs and clearing firms participated in this years test: 73 FCMs, clearing firms and non-clearing firms and 38 trading participants participated - an increase over last year ~72% of firms tested successfully II.EXECUTIVE SUMMARY

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS This years test initiative was expanded to include several domestic and international exchanges: Bourse de Montreal Chicago Climate Futures Exchange ELX Futures The exchanges and clearinghouses demonstrated that their systems, processes and procedures simultaneously worked very well, communicating from back up systems/sites. EXECUTIVE SUMMARY (CONTD) …

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS Feedback from the firms, exchanges and clearing houses indicated that this was a valuable and worthwhile exercise and that the industry should continue to do more common testing in the future Firms indicated that the test helped them: – –Exercise their business continuity/disaster recovery plans – –Identify internal single points of failure – –Tighten up and document their business continuity procedures – –Better understand the need for cross-training – –Test connectivity with exchanges DR sites EXECUTIVE SUMMARY (CONTD) …

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS 13 domestic and international futures exchanges and clearinghouses, 73 clearing/non-clearing firms* and 38 trading firms participated** in the test Test participants included clearing firms, non- clearing firms and non-clearing trading participants 61% of all futures clearing firms participated Participant firms represent a significant critical mass of futures order flow and liquidity: ~88% of overall futures exchanges volume. *Some firms are common members of multiple exchanges **Represents non-clearing trading participants III.OVERALL TEST RESULTS

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS Tested via member firms back up connectivity to back up CBOEdirect trading platform Scripted trade entry for VIX futures contracts Transmitted trades to the OCCs back up systems via MQ Transmitted regulatory data to NFA via FTP. CBOE FUTURES EXCHANGE

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS Tested via member firms back up connectivity to CCFE electronic trading system DR site hosted by ICE Scripted trade entry occurred for RGGI and SFI futures contracts and block trades Tested the availability and operability of the exchanges market surveillance applications, hosted out of the DR site Tested connectivity and trade submission to the Clearing Corps DR site. CHICAGO CLIMATE FUTURES EXCHANGE

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS Tested member firms back-up connectivity to GLOBEX trading platform Entered a script of orders for various products Received ex-pit, block trade information via CME remote site portal URL Generated trade reporting and SPAN files from 10/22 trade date Received PCS and large trader information from member firms Transmitted trade registry data and SPAN files via FTP. CME GROUP / CME CLEARING

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS Tested via eSpeed electronic trading system Trade date was Monday October 25 th Trading products included all ELX UST and Eurodollar futures contracts via eSpeed supported APIs Block trades or EFP trade types were not accepted. ELX FUTURES

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS Utilized the IDEX XT trading system from the back up site Trade orders were received by IDEX Market Operations Trades were reported and automatically matched and executed with a trade date of October 23. Generated trade confirmations and transmitted to firms NFX/IDEX trades were automatically processed for clearing and settlement to the IDCH. INTERNATIONAL DERIVATIVES CLEARING GROUP

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS Tested member firms back-up connectivity to the ICE Trader electronic trading system Scripted order entry for Cotton, Russell 2000 and Sugar futures contracts Trade management via PTMS and TIPS systems for test trades Trade messages sent via FIXML to Clearing Members Clearing file submission via AFTS – –Match off files, report files, Large Trader, PCS and SPAN files. ICE FUTURES US / ICE CLEAR US

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS Tested member firms back-up connectivity to the ICE Exchange electronic trading system DR site Scripted order entry for Canola, Cotton, Russell 2000, Sugar and Brent futures contracts Tested ICE Block and other non trading functionality from DR site WebICE reporting via Internet portal for deal reporting, position reports, etc. ICE EXCHANGES

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS Tested member firms back-up connectivity to the ICE Exchange electronic trading system DR site Tested ECS, AFTS, Crystal Reports, ICE Block and other non trading functionality from DR site. ICE CLEAR EU

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS Members tested connectivity to CME GLOBEX trading system Participated in post-trade testing - generated a subset of October 22nd trades to member firms Transmitted trade confirmations from KCBT Clearing Corp. Accepted EFP, change records, PCS and large trader records. KANSAS CITY BOARD OF TRADE

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS Tested via the MEFF production ETS environment Simulated a failure of their London POP and successfully failed over to the backup system during the test Members entered trades and received reports Transfer files were delivered from clearing Clearing data was restricted and not sent to member firms back office systems. MEFF

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS Trades were entered for MGEX products into the CME GLOBEX platform and MGEX TEMS system. Trades were processed by MGEX Clearing via the MGEX DR site TREX trade files were generated by the MGEX DR Clearing Server and placed on the MGEX DR FTP server The MGEX DR remote access and FTP servers were accessible with the same logins and passwords as the production system. MINNEAPOLIS GRAIN EXCHANGE

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS Tested the SOLA electronic trading system via the Toronto back up site Orders were entered with an October 23 rd trade date Trades were transmitted to firms via HSVF and ATR protocols Post-trade transmission to CDCC was not part of the scope of the test. BOURSE DE MONTREAL

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS OCC successfully tested from their back up site Supported FTP+, Pull/Push, NDM and MQ file connectivity IP addresses and TCP Ports were unchanged, as they were in production for this test Firms submitted file transmissions and received output files. OPTIONS CLEARING CORP.

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS A number of problems were encountered; most were resolved quickly, although some caused an unexpected delay to test progress Types of problems that were encountered included: – –MQ session ID and MQ channel connectivity problems; messaging and routing of M1 records – –Incorrect firewall configuration parameters, IP addresses/incorrect network configuration – –Firewall access problem with a dynamic vs. static IP address. IV.PROBLEMS ENCOUNTERED

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS – –Due to the scope of the exercise being back up to back up, some firms did not have back up connectivity links to the exchange (i.e., Chicago only disruption scenario), and could not participate in the test scope – –Problem with an exchange application prevented the ability to reset their session – –Incorrect contact name/numbers at firms – –Incorrect user ID login/misunderstood how IDs were configured. PROBLEMS ENCOUNTERED (CONTD)…

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS – –Improper FIX tag input – –Member firm server connectivity – –Time zone conversion/configuration issue – –Access rights for market supervisory workstations in DR were not set up properly. PROBLEMS ENCOUNTERED (CONTD)…

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS The futures industry proved that it is capable of successfully orchestrating an industry-wide disaster recovery test Most problems that were encountered were rectified quickly, although some caused an unexpected delay to the restoration of full processing capabilities Under real life situations, most problems could probably be resolved within hours or by the next business day. V.LESSONS LEARNED

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS The exchanges and clearinghouses internal support processes and procedures worked well Firms and exchanges indicated that the test helped them: – –Identify some internal single points of failure – –Tighten up and document their business continuity and system fail over procedures – –Improve test scripts and plans for future tests – –Identify/refine pre-test and post-test procedures for connectivity testing – –Better understand the need for cross-training – –Test connectivity to/from DR sites. LESSONS LEARNED (CONTD)…

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS Firms must be aware of any environmental impact on their network fire walls caused by test requirements: – –Highlight any environmental impact or expectations on the firms – –Pre-register via the FIA registration portal/participate in ping testing – –Have proper network staffing support actively engaged during the test – –Be aware of any firewall impact and make changes accordingly to accommodate testing. LESSONS LEARNED (CONTD)…

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS A number of firms apparently did not pre-register and showed up for the test at several exchanges: – –They were set up and most tested successfully, however, this placed an additional demand on exchange and clearing house support staffs – –Participation in pre-test ping testing should be mandatory for future test initiatives. LESSONS LEARNED (CONTD)…

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS Survey firms and exchanges for input to future testing Announce the details, goals and objectives of the next DR test - Saturday October 29, 2011 Broadly market future test initiatives to firms IT, operations, trading and senior management, to ensure a wider dissemination of test information within all firms Institute a version control process to mark test plan/test script changes with a version timestamp and commentary on what was changed. VI.SUGGESTED NEXT STEPS

CG Consultants to the Financial Services Industry 2010 FUTURES INDUSTRY DR TEST RESULTS Provide more clarity and details in test plans/scripts if technical changes will be required by firms (e.g., MQ configuration or IP address changes) ; add an appropriate section to test plan formats. Coordinate the October 2011 date with SIFMA; this facilitates firms to participate that are joint FIA/SIFMA members. SUGGESTED NEXT STEPS (Contd) …