Heart of Florida Loop East Section

Slides:



Advertisements
Similar presentations
Public Meeting Presentation March 15, Project Location Project Purpose –Traffic reliever to I-95 –Integrate road with the Northwest Sector Plan.
Advertisements

From US 17 to SR 11 and SR 11 to Cone Road FPID No
Titusville to Edgewater Bike Loop PD&E Study
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Space Coast Loop Trail - Brevard County
River to Sea TPO May 28, 2014 River to Sea TPO May 28, “I-4 BEYOND the ULTIMATE” PD&E REEVALUATION STUDY From west of US 27 to west of Kirkman Road.
Bike Routes and Pedestrian Routes. Bike Route Goals Create a safe route through the city Connecting parks, schools, and subdivisions Raise awareness of.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
Transportation Planning Organization(TPO) City Council Workshop November 12, 2013.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
2014 TOP TEN. 10 Federal Highway/Federal Transit Certification Noteworthy Practices:  Strategic Planning process and priorities  Complete Streets.
FY Budget Worksession Parks & Recreation Division July 13, 2015.
Reasons for Exploration
Regional Trails Corridor Assessment. Project Goals »Complete the regional trails network in the TPO Planning Area and advance the Florida Greenways and.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS TYLER MEYER, AICP 2015 AMPO Conference Clark County, NV October 2015.
Lake to Lake Cycling Route and Walking Trail Greenbelt Cycling Route Workshop Presentation by Richard Hui October 2, 2013.
Land Area and Location. Georgia has _____ counties.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
Transportation Projects City Council Workshop May 14, 2013.
CENTRAL FLORIDA EXPRESSWAY AUTHORITY FY Five Year Work Plan December 10, 2015 Presented by: Jeanette Maldonado-Ambler, PE Atkins.
1. 2 February Alliance Workshop St. Louis Regonal Freightway Alliance Needs Analysis and Freight Development Committee Terminal Rail Association.
Welcome!. OVERVIEW Limited access reconstruction/relocation of US 31 from US 30 to US 20. The project area includes the communities of LaPaz and Lakeville,
Getting Our Feet Wet Local and Regional Resiliency Efforts Importance to R2CTPO Project Overview Next Steps.
Solid Waste Disposal Discussion Solid Waste and Resource Recovery Sally Palmi.
Preliminary Estimated Cost
Office of Greenways & Trails
SR 417 Extension Sketch-Level Traffic & Revenue Evaluation
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Regional Roads Committee
Central Polk Parkway PD&E Study
A Presentation to: River to Sea TPO BPAC November 9, 2016.
Major Projects in Development
Project Overview Multimodal improvements to 22.5 miles of I-66
2010 Regional Intelligent Transportation Systems Plan: 2017 Progress Report on Implementation The Florida-Alabama, Okaloosa-Walton, and Bay County Transportation.
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
FY 2011 Status Report on the Ormond Beach Downtown CRA
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
SR 417 Extension Sketch-Level Traffic & Revenue Evaluation
River to Sea TPO Meeting US 92/International Speedway Boulevard
Kerr Tar Project Update – June 2016
THE EAST COAST GREENWAY
Your name, group, a member of the Circuit Trails Coalition
CR184 (Quintette Road) Bridge #480045
SANDY SPRINGS CITY COUNCIL MEETING
River to Sea TPO Public Outreach FY 2016/17
Trail Projects. Trail Projects US 1 (SR 5) From Kennedy Parkway to Dale Avenue FM No.: Work Mix: Bike Path / Trail Phase: Design / Construction.
River to Sea Transportation Planning Organization Sea Level Rise
Woodinville-Duvall Road Widening Project Update
September 25, 2018 District 5 SUN Trail Update
St. Johns River-to-Sea Loop Trail Summit
LRTP Modeling Status Update
SCTPO Transportation Alternatives & Trail Project Priorities
projects update ATLANTA district
Transportation Impact Fees and Funding
ELECTRICAL CIRCUITS AND CONSTRUCTIONS An electrical circuit is a network consisting of a closed loop, giving a return path for the current 2.
TELL THE TPO Community Transportation Survey
Committee Update August 27, 2018.
LRTP Modeling Status Update
Volusia County Good afternoon,
Save our Springs and Rivers
Walker Street Reconstruction Project 25% Design Public Hearing
River to Sea TPO Public Outreach FY 2016/17
Monterey County Project Report for Measure X Expenditures
Church Road Community Meeting
2045 LRTP Overview United Way of St Johns County May 10, 2019.
Space Coast TPO State Road (S.R.) 528 Update
2045 LRTP Overview North District Citizens Planning Advisory Committee.
Public Workshop September 26, 2019.
Presentation transcript:

Heart of Florida Loop East Section BPAC Meeting June 10, 2015

Heart of Florida Loop-East Section In the River to Sea TPO planning area, the Heart of Florida Loop consists of the Florida Black Bear/SR 40 Trail, US 17 Trail and the Spring to Spring Trail (a total of 39 miles).

Heart of Florida Loop-East Section SR 40 Trail US 17 Trail Spring to Spring Trail

Florida Black Bear/SR 40 Trail Connecting Marion, Lake and Volusia Counties Volusia County Limits: St. Johns River to US 17 Width: 12 feet Length: 6.5 miles Current Status: PD&E/feasibility study programmed in FY 2020 Estimated Cost: $1.1 million

US 17 Trail Developed in conjunction with the widening of US 17/SR 15 Limits: Ponce de Leon Boulevard to SR 40 (east side) Width: 12 feet Length: 6.84 miles Current Status: Design & Right of Way (40% design plans) Estimated Cost: $1.2 million (construction not funded) Proposed Roadway Typical Section 

Spring to Spring Trail Gap H Gap G Gap F Seminole/Volusia Gap

Goals of the RTCA Complete the regional trails network in the River to Sea TPO planning area Advance the FGTS Plan by identifying trails for the 2015 Opportunity Map Update Develop/finalize trail alignments and connections Inventory existing trail gaps and develop conceptual plans and cost estimates

Regional Trail Connections to the Heart of Florida Loop St. Johns River to Sea Loop/East Coast Greenway (alternate route) SR 40 Trail East Central Regional Rail Trail

Thank You