Investing in Climate Action, investing in LIFE Detailed information on the 2014 call for proposals for action grants– guidance to applicants 12/06/2014.

Slides:



Advertisements
Similar presentations
Research and Innovation Summary of MS questions on the Commission's proposal for DG Research & Innovation Research and Innovation Rules for Participation.
Advertisements

Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
The LIFE Integrated Projects
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
Capitalising the full potential of online-collaboration for SME innovation support Horizon 2020 call Innosup (Participant Portal code: H2020-INNOSUP )
The new LIFE Programme Opportunities for IL stakeholders Esther Pozo Vera Sector Coordinator Neighbourhood, Central Asia and Gulf States European.
Erasmus+ programme Key Action 2 Strategic partnerships Project application form.
PART 2: THE SUB-PROGRAMMES AND TYPES OF INTERVENTION LIFE presentation1.
A project implemented by the HTSPE consortium This project is funded by the European Union SUSTAINABLE GROWTH LIFE
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
Name, Surname, Position Event, Date, Place Managing a LIFE project.
1 Framework Programme 7 Guide for Applicants
APPLICATION FORM OF ROBINWOOD SUBPROJECT SECOND STEP 1. The short listed Local Beneficiaries work together to create international partnerships and prepare.
PART 3: HOW TO PREPARE March 2014LIFE presentation1.
Regulatory requirements in the current programming period Funchal, 18 November 2010.
ACP S&T Programme - Stakeholder conference October Implemented by the ACP Secretariat Funded by the European Union EDULINK - ACP Science and.
Technical Assistance Office SOCRATES / Lingua 1 and 2 Information seminar for co-ordinators of successful pre-proposals Carla Donda 28 January 2005.
1 Eurostat’s grant policy for 2010 Luxembourg, 23/03/2010 Unit A4 – Financial Management Section 3 – Grant procedures and agreements.
Investing in Climate Action, investing in LIFE Introduction to the new LIFE Programme Charlotte Slater, ICF GHK 12/06/2014 Greek workshop.
Application procedure From theory to practice Dieter H. Henzler, Steinbeis-Transfercenter Cultural Resources Management, Berlin.
Grant Application Form (Annex A) Grant Application Form (Annex A) 2nd Call for Proposals.
Commission proposal for a new LIFE Regulation ( ) Presentation to Directors Meeting DK 22 May 2012.
Technical Assistance Office 1 Contract, Reports and errors to avoid! GRANT AGREEMENT 2005 Comenius coordinators’ meeting, 17/10/2005 Maryline Fiaschi,
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
1. TEMPUS PROGRAMME PROJECT REPRESENTATIVES’ MEETING Brussels, March 2010 Management of the Grant Agreement.
Concept Note Preparation CYPRIOT CIVIL SOCIETY IN ACTION IV.
Investing in Climate Action, investing in LIFE Detailed information on the 2014 call for proposals for action grants– guidance to applicants 12/06/2014.
EuropeAid/152087/DD/ACT/LB Cultural activities 2016 Information Session 13 th June 2016.
LIFE+ Project evaluation and selection Markéta Konečná 9 April 2013.
TAIEX-REGIO Workshop on Applying the Partnership Principle in the European Structural and Investment Funds Bratislava, 20/05/2016 Involvement of Partners.
Sharing solutions for better regional policies European Union | European Regional Development Fund Erika Fulgenzi Policy Officer | Interreg Europe JS
The LIFE Programme Iñigo Ortiz de Urbina LIFE External Assistance Regional coordinator Technical Assistance to Support the Development of Green.
A project funded by the European UnionImplemented by a consortium led by Get ready for the call! Next steps for building partnerships and developing a.
WP8 Project management Milan Gocić University of Niš
Monitoring Expert, NEEMO GEIE
How to Prepare a Good Proposal?
Lessons from the Evaluation Phase
The 6th Framework Programme
European Commission “Intelligent Energy for Europe”
Content of Tender Dossier Instructions to Tenderers
INVESTING IN SYRIAN HUMANITARIAN ACTION (ISHA)
What is a grant? A direct financial contribution – donation – from EU budget An action - contributing to EU policy achievement Functioning of a body acting.
Funding schema to support public/private initiatives
GREECE-ALBANIA IPA CROSS BORDER COOPERATION PROGRAMME
Drafting the Guidelines for applicants
PROJECT MANUAL Galina Georgieva Project Officer
NPA eMS application – Project Information
07/11/2018 The new LIFE Programme Sylvie LUDAIN Laszlo BECSY DG ENV
The LIFE program 13th Meeting of the Marine Strategy Coordination Group (MSCG), Brussels, 13/05/2014 Dørte PARDO LÓPEZ DG Environment, Unit E.3 European.
ERASMUS+ KA3 European Youth Together EACEA Tuesday 24th April 2018.
External Monitoring Expert, NEEMO
Workshop with the 8 PAF related Proposals & the Habitats Committee
CENTRAL EUROPE first call for proposals
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
Opening seminar of the project
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
Helene Skikos DG Education and Culture
Information Session Brussels, 7 November 2018.
DG ENV/MSFD 2018 call for proposals
United Nations Voluntary Fund on Disability (UNVFD)
2012 Annual Call Steps of the evaluation of proposals, role of the experts TEN-T Experts Briefing, March 2013.
COGAIN Kick-Off 5-6 September, 2004 FINANCIAL GUIDELINES
FINANCING NATURA 2000 Agenda item 2.1 CGBN Co-ordination Group
A Sea for Life MSFD related projects under Integrated Maritime Policy
Commission proposal for a new LIFE Regulation CGBN meeting
The – new – LIFE program (Integrated Projects)
DG Environment, Unit D.2 Marine Environment and Water Industry
DG Environment, Unit D.2 Marine Environment and Water Industry
Presentation transcript:

Investing in Climate Action, investing in LIFE Detailed information on the 2014 call for proposals for action grants– guidance to applicants 12/06/2014 Greek workshop

Agenda Guidance to applicants Opportunity for Q&A Is LIFE for me? Success rates Timetable Components of the 2014 LIFE call Guidance and support Application forms LIFE CLIMA and IP award criteria Key steps in preparing an application What is eligible for co-funding E-proposal tool Key messages Frequently asked questions – general guidance to applicants Opportunity for Q&A

Is LIFE for me? Be SURE that LIFE is the appropriate funding programme for your Environment and Climate Action project (NOT a structural fund, NOT an operational business financing tool, NOT a research tool) READ the application guidelines Be AWARE of all the exceptions that may apply to you Ensure financial coherence; Watch COST EFFECTIVENESS FOCUS - Do NOT include Actions not related to the objective of your proposal CHECK whether your project fully fits with a priority project topic, or you will receive fewer points The SELECTION procedure of LIFE is a very tough, through and detailed one.

Is LIFE for me? What awaits the beneficiaries I Project management: minimum 1 full-time equivalent Associated beneficiaries/Co-financers: As many as necessary to make it a success and as s/he can handle Reporting: In English (annexes in language of the application (relevant translation costs incurred after project start are eligible) Every 18 months technical and financial progress reports, 1 progress report with 2nd pre-financing payment request (after consumption 1st pre-financing), 1 final report with payment request.

Is LIFE for me? What awaits the beneficiaries II Monitoring obligations Monitoring of Project Outcomes: Follow-up on the targeted environmental/climate outcomes related to at least one of the relevant outcome indicators and to the replicability/transferability of the related actions (MAWP) Monitoring of Project Progress: Ensure timeliness and full compliance of the project with the proposal

Is LIFE for me? What awaits the beneficiaries III Support: An external Monitoring Team (MoT) for technical and financial FAQ related to reporting and project management; EASME/Commission for IPs under the sub-programme for environment for bigger issues (modification requests, payments), but always through MoT Visits: MoT: first 9 months after project start, then once a year; EASME/Commission: at most once in the lifetime of the project, normally towards the end. Knowledge Sharing, Publicity, and Recognition

Submission trend 2007-2012

Success rate consolidated

Timetable for 2014

Components of the 2014 LIFE call "Traditional" Projects: LIFE Environment and Resource Efficiency (ENV) LIFE Nature and Biodiversity (NAT) LIFE Environmental Governance and Information (GIE) LIFE Climate Change Mitigation (CCM) LIFE Climate Change Adaptation (CCA) LIFE Climate Governance and Information (GIC) Preparatory Projects Integrated Projects (sub-programme for environment only) Technical Assistance Projects (sub-programme for environment only) Capacity Building Projects (NGO Operating Grants = separate call)

Guidance and support Information sources include: LIFE Regulation MAWP LIFE Web page Application Packages National Contact Points - when preparing the proposal, the applicants may wish to consult the relevant LIFE National Contact Point; the complete list of the names and contact addresses of the national authorities for LIFE in the Member States can be found on the LIFE website at http://ec.europa.eu/environment/life/contact/nationalcontact/index.htm

Application forms and process The application form includes: Guidelines for Applicants (and forms) Evaluation Guidelines Model Grant and Common Provisions Comparative Document (is LIFE the right instrument? Which strand?): Vs. Horizon 2020 vs. structural funds NAT (vs. BIO) vs. ENV vs. CCA vs. CCM // GIE vs. GIC?

Application forms and process – Environment or climate sub-programme Projects falling under one of the project topics Climate mitigation or adaptation is a by-product but not the central objective Clear link to the specific objectives for the three environmental priority areas Climate Climate mitigation or adaptation is the main goal Clear link to the specific objectives for the three climate action priority areas

CLIMA Award criteria (2014-2017) Overall pass score: 55 of 100 possible points

IP Award criteria (2014-2017) Overall pass score: 55 of 100 possible points

Key steps in preparing an application I When preparing your proposal, the following main types of eligible actions must be clearly distinguished: Preparatory actions (A Actions), Land purchase/lease of land and/or compensation payment for land use rights (B Actions), Concrete implementation actions (C Actions), Monitoring of the impact of the project actions (D Actions), Communication and dissemination actions (E Actions), Project management and monitoring of project progress (F Actions). To be taken eligible for funding, all actions must meet each of the following conditions: the need of the action has to be well justified in view of the objectives of the project; the long-term sustainability of the investments must be guaranteed. See application guidelines for more detail on these actions

Key steps in preparing an application II READ the application guidelines Be SURE that LIFE is the appropriate funding programme for your Environment and Climate Action project (NOT a structural fund, NOT an operational business financing tool, NOT a research tool) Be AWARE of all the exceptions that may apply to you Ensure financial coherence; Watch COST EFFECTIVENESS FOCUS - Do NOT include Actions not related to the objective of your proposal CHECK whether your project fully fits with a priority project topic, or you will receive fewer points The SELECTION procedure of LIFE is a very tough, thorough and detailed one.

Key steps in preparing an application III Common reasons for failure: No clear EU relevant environmental or climate action focus Not convincingly demonstrative or pilot Key points to remember: Life does not finance: Compensatory action under Art. 6 of the Habitats directive Actions that should be (or are) financed under Structural Funds or CAP Research projects Be clear and precise – applications are evaluated on what is submitted (not on the potential of the idea) Read documents Read about and talk to ongoing projects Start preparing early and make use of all available resources http://ec.europa.eu/environment/life/index.htm

Key steps in preparing an application III Common reasons for failure: No clear EU relevant environmental or climate action focus Not convincingly demonstrative or pilot Key points to remember: Life does not finance: Compensatory action under Art. 6 of the Habitats directive Actions that should be (or are) financed under Structural Funds or CAP Research projects Be clear and precise – applications are evaluated on what is submitted (not on the potential of the idea) Read documents Read about and talk to ongoing projects Start preparing early and make use of all available resources http://ec.europa.eu/environment/life/index.htm

What is eligible for co-funding In general: All cost directly related to the project objectives Personnel costs (if public authority: 102% rule) External assistance (limited to 35% of the budget) Equipment (special rules on depreciation) Overheads (limited to 7%) Consumables/Other costs Land purchase (only for nature or climate change objectives, and with dedication to nature purposes)

E-proposal tool Full online process Preparation / Submission Communication Revision Amendment Structured data Can allow third parties to see applications in development https://webgate.ec.europa.eu/eproposalWeb/ The application tool contains all administrative (A), technical (B and C) and financial (F) forms required, and functionalities to attach relevant documents (maps, photos, diagrams, graphs, mandatory administrative and financial annexes). Guidelines to applicants will provide complete details regarding the use of the eProposal tool and the application forms. .

E-proposal tool

E-proposal tool

E-proposal tool

E-proposal tool

E-proposal tool

E-proposal tool

There is significant competition for LIFE funds Key messages There is significant competition for LIFE funds You can't get a grant if you don't submit an application – on time... It takes time and money to prepare an application Proposals that fail are poorly prepared.

Frequently Asked Questions: General Guidance to Applicants In which language may the proposal be submitted? The Contracting Authority recommends that applicants fill in the technical part in English, although proposals may be submitted in any of the official EU languages, except Irish/Maltese. The grant agreement, project management, formal reporting and all communication with the Contracting Authority have to be in English. The title of the proposal and form B1 ("Summary description of the project") must always be submitted in English. Form B1 may also be submitted in the language of the proposal. Who may submit a proposal? A proposal may be submitted by any legal person registered in the European Union. Applicants may fall into three types of beneficiaries: (1) public bodies (public authorities), (2) private commercial organisations and (3) private non-commercial organisations (including NGOs). Who may participate in a project? Once a proposal has been accepted for co-funding, the applicant will become the coordinating beneficiary who is legally and financially responsible for the implementation of the project. An associated beneficiary may be legally registered outside the European Union, provided that the coordinating beneficiary is based in the EU. Any activities to be carried out outside the EU must be necessary to achieve EU climate objectives and to ensure the effectiveness of interventions carried out in the Member State territories to which the Treaties apply. There is no obligation to involve associated beneficiaries in a LIFE proposal. A project co-financer only contributes to the project with financial resources, has no technical responsibilities, and cannot benefit from the EU financial contribution.

Frequently Asked Questions: General Guidance to Applicants What is the optimal budget for a LIFE project? There is no fixed minimum size for project budgets. While large ambitious projects (i.e. over EUR 5 million total costs) have been financed several times in the past, very small projects (i.e. below EUR 500,000 total costs) have seldom succeeded due to the limited output and consequently the low added value. What is the maximum rate of EU co-financing under LIFE? For the duration of the first LIFE multiannual work programme for 2014-2017, the maximum EU co-financing rate for LIFE action grant projects is 60% of the total eligible project costs. How much should project beneficiaries contribute to the project budget? The coordinating beneficiary and any associated beneficiaries are expected to provide a reasonable financial contribution to the project budget. What is the optimal starting date and duration for a project? The earliest possible starting date for these projects is 16 July 2015. Any costs incurred before the project's starting date will not be considered eligible and cannot be included in the project budget. the project duration must correspond to what is necessary to complete all of the project's actions and to reach all its objectives. Most projects last for 2–5 years. Outsourcing of project activities The beneficiaries should have the technical and financial capacity and competency to carry out the proposed project activities. It is therefore expected that the share of the project budget allocated to external assistance should remain below 35%.

Frequently Asked Questions: General Guidance to Applicants How long should a LIFE proposal be? A proposal should be as concise and clear as possible. Applicants should avoid voluminous proposals and should not provide excessively detailed descriptions. Clear and detailed descriptions should, however, be provided for all project actions. Long term sustainability of the project and its actions It is obligatory that throughout the duration of the project, the beneficiaries consider how these investments will be secured, maintained, developed and made use of or replicated after the end of the project. This should be built into the proposal. Replication and dissemination LIFE projects are expected to be widely replicated and results disseminated in order to ensure a strong European added value beyond the investment into the LIFE project itself. Research activities Whereas EU funding for research activities is provided under Horizon 2020 – the Framework Programme for Research and Innovation (2014–2020), limited research aimed to improve and enhance the knowledge data underpinning the project may be carried out within a LIFE project. Complementarity with other EU funding programmes According to Article 8 of the LIFE Regulation, activities supported from the LIFE Programme must ensure consistency and synergies, and avoid overlap with other funding programmes of the Union. It is essential that beneficiaries check whether the actions proposed under their project in practice could be, or are, funded through other EU funds.

Opportunity for Q&A