Proposer: Marie Clark, ScottishPower Panel Date: 16th January 2014

Slides:



Advertisements
Similar presentations
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Advertisements

Review of industry code governance 26 March 2010.
Mod for Discussion on 7 th January 2011 Draft Outline of Potential Refinements to the User Pays Modification Process Action RG Based on discussions.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Proposer: insert Panel Date: insert 0XXX: Mod Title: insert title Guidance: These slides are meant to provide a brief overview for the UNC Panel, to introduce.
Gas Performance Assurance Framework 11 th January 2013 Confidential.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Allocation of Unidentified Gas Statement 2013/14 6 th February 2012.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Proposer: Matthew Hatch Panel Date: 15 th May 0501: Treatment of Existing Entry Capacity Rights at the Bacton ASEP to comply with EU Capacity Regulations.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Administrative Changes to the UK-Link Manual Modification 414 and SIS Removal David Addison.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Gas Performance Assurance Framework 11 th January 2013.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
IGT and Shipper Workgroup meeting 28 th February 2011.
Vale of Aylesbury Local Plan
Proposer: Matthew Hatch Panel Date: 20/10/16
Review of Demand Estimation Times for Modification Proposal 461
Code Governance Review UNC Modification Proposals
xrn4361 UK Link Future Release 2
Introduction of Code Contingency Guidelines Document
CSEP NExA Update Marie Clark ScottishPower 28th September 2006.
Proposer: BP Gas Marketing Ltd Panel Date: 17 April 2014
Proposer: National Grid NTS Panel Date: 17th April 2014
Assignment Workshop 2 16th September 09, Solihull.
Modification th July 2008.
Change Management Committee – June 2019 Update
CSEPs Reconciliation Proposals
Exit Capacity Substitution and Revision
UNC 0XXX: Mod Title: insert title
The Necessary Criteria for a UNC Modification Proposal
Proposer: Malcolm Montgomery Panel Date: 20/10/16
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Modification 0333A – implementation info
Development of Firm Monitor & GBA
Proposer: Colette Baldwin – E.ON Panel Date: 21st August 2014
Joint Office Presentation for Modification 0678
UNC Modification Proposal 0362
Proposer: Marie Clark, ScottishPower Panel Date: 7 February 2014
Introduction of Code Contingency Guidelines Document
Modification Proposal 0474: Inclusion of the guidelines relating to the “Customer Settlement Error Claims Process” within UNC governance.
Proposer: Transporter /
AUG Query Responses 21st November 2013.
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
Hands-On: FSA Assessments For Foreign Schools
Richard Fairholme Transmission Workstream 4th September 2008
Modification 0448 – European Driven Change Process Flow Diagram
Deferral of Retrospective Updates Functionality
Proposer: Colette Baldwin – E.ON Energy Solutions Ltd
DN Interruption Phase II
Data Office POAP April/May 2019
Title slide [from Title Slide master]
UNC Modification 0634 (Urgent) – Post Implementation Assessment
Change Management Committee – November 2019 Update
Modification Proposal 136
Joint Office UNC Elections
Joint Office UNC Elections
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
DSG Governance Group Recommendations.
Joint Office UNC Elections
Xoserve Draft UIG Incentives Modifications 20 May 2019
Proposer: Tracey Saunders, Northern Gas Networks
Presentation transcript:

Proposer: Marie Clark, ScottishPower Panel Date: 16th January 2014 0475: Mod Title: Update to Section G, Annex G3 (Prospective Erroneous Large AQ Calculation Proforma) Guidance: These slides are meant to provide a brief overview for the UNC Panel, to introduce what is trying to be achieved, to help them understand and decide the best process to be followed for new modifications. Please aim to be as brief as possible and not justify nor make the case for the Modification. Notes are provided in italics and if this template is being used should be removed. The Joint Office is available to help and support the drafting of any modifications, including guidance on completion of the Modification template and the wider modification process. Contact: enquiries@gasgovernance.co.uk or 0121 288 2107. Proposer: Marie Clark, ScottishPower Panel Date: 16th January 2014

Why change? Please use bullets to summarise what in the UNC is wrong and creating problems This Modification seeks only to update the AQ Values currently contained within Section G, Annex G-3 with those currently held within the LDZ CSEP NExA, Annex A The assignment of an AQ value from Annex G-3 represents an estimate only of the domestic customer’s consumption. This process can be used to appeal a domestic AQ where specific information relating to the gas ratings of appliances at a customer’s property is not known. The use of the AQ Values within the LDZ CSEP NExA was considered a reasonable alternative in the absence of any published consumption information relating to domestic occupied properties When Mod 392 was raised it omitted to include the requirement to update Annex G-3. This Modification will ensure the continued alignment of AQ Values held within Annex G-3 and the LDZ CSEP NExA, Annex A

Options Update to Section G, Annex G-3 only Please use bullets to summarise what options have been considered to fix the identified problem. Is a UNC modification the only route? Update to Section G, Annex G-3 only

Solution Please use bullets to briefly outline the solution contained within the modification. Update UNC Section G, Annex G-3 with the revised AQ values implemented via Mod 392 It is not proposed at this time that a formal review of the AQ values contained within the above table is undertaken to determine if they remain reflective of new build AQ values. A periodic review of these AQ values is undertaken via the iGT Shipper Group in accordance with the procedure implemented within iGT UNC Mod 051.

Recommended Steps Please use bullets to summarise the recommended steps. Please indicate how long you think the assessment process should last and if self-governance should apply or not. The Proposer recommends that this modification should be: (delete as appropriate) Subject to self-governance route