M.Sekido, R.Ichikawa,H.Osaki, T.Kondo,Y.Koyama(CRL)

Slides:



Advertisements
Similar presentations
Colorado Center for Astrodynamics Research The University of Colorado ASEN 5070 OD Accuracy Assessment OD Overlap Example Effects of eliminating parameters.
Advertisements

RHESSI/GOES Observations of the Non-flaring Sun from 2002 to J. McTiernan SSL/UCB.
Space Weather influence on satellite based navigation and precise positioning R. Warnant, S. Lejeune, M. Bavier Royal Observatory of Belgium Avenue Circulaire,
VieVS User Workshop 14 – 16 September, 2011 Vienna SPACECRAFT TRACKING Lucia Plank.
How The GPS System Works. How the GPS System Works 24 satellites + spares 6 orbital planes 55° inclination Each satellite orbits twice every 24 hours.
Principles of the Global Positioning System Lecture 11 Prof. Thomas Herring Room A;
How Global Positioning Devices (GPS) work
Physics 114: Lecture 15 Probability Tests & Linear Fitting Dale E. Gary NJIT Physics Department.
SVY 207: Lecture 4 GPS Description and Signal Structure
11 Regarding the re-definition of the astronomical unit of length (AU) E.V. Pitjeva Institute of Applied Astronomy, Russian Academy of Sciences Workshop.
New correlator MicroPARSEC Igor Surkis, Vladimir Zimovsky, Violetta Shantyr, Alexey Melnikov Institute of Applied Astronomy Russian Academy of Science.
Modern Navigation Thomas Herring MW 11:00-12:30 Room A
Recent determination of Gamma with Cassini M.T. Crosta, F. Mignard CNRS-O.C.A. 5th RRFWG, June, Estec.
Modern Navigation Thomas Herring
ASTROMETRY OBSERVATION OF SPACECRAFT WITH VERY LONG BASELINE INTERFEROMETRY ---- A STEP OF VLBI APPLICATION FOR SPACECRAFT NAVIGATION ---- M.Sekido, R.Ichikawa,H.Osaki,
Radio Astronomy Applications Group Kashima Space Research Center National Institute of Information and Communications Technology EGU2005 GI3-1TH5P-0057.
THE SOFTWARE CORRELATOR FOR ESA DELTA-DOR L. Iess, R. Abelló, A
Arrival time of halo coronal mass ejections In the vicinity of the Earth G. Michalek, N. Gopalswamy, A. Lara, and P.K. Manoharan A&A 423, (2004)
1 Gbps Disk-Based VLBI Observation for Future East Asia VLBI Observations Kiyoaki Wajima 18 March 2009 동아시아 VLBI 워크샵 Yamaguchi University Introduction.
P. Wielgosz and A. Krankowski IGS AC Workshop Miami Beach, June 2-6, 2008 University of Warmia and Mazury in Olsztyn, Poland
Colorado Center for Astrodynamics Research The University of Colorado 1 STATISTICAL ORBIT DETERMINATION ASEN 5070 LECTURE 11 9/16,18/09.
Modern Navigation Thomas Herring MW 11:00-12:30 Room
Evaluation of Global Ionosphere TEC by comparison with VLBI data Mamoru Sekido, Tetsuro Kondo Eiji Kawai, and Michito Imae.
Giga-bit Geodesy e-VLBI at 22GHz Hiroshi Takaba Gifu University, Japan.
Chapter 7 Estimates, Confidence Intervals, and Sample Sizes
1 SVY 207: Lecture 12 Modes of GPS Positioning Aim of this lecture: –To review and compare methods of static positioning, and introduce methods for kinematic.
VLBI Oct Development Status of Broadband VLBI System (Gala-V) -(II) M.Sekido (1), K.Takefuji (1), H.Ujihara (1), M.Tsutsumi.
Astrometric VLBI Observation of Spacecraft with Phase Delay M.Sekido, R.Ichikawa,H.Osaki, T.Kondo,Y.Koyama (National Institute of Information and Communications.
03/6/121 Using the VLBA for Spacecraft Navigation Jonathan Romney National Radio Astronomy Observatory VLBA 10 th Anniversary 2003 June 9 – 12.
1 SVY 207: Lecture 6 Point Positioning –By now you should understand: F How receiver knows GPS satellite coordinates F How receiver produces pseudoranges.
Principles of the Global Positioning System Lecture 09 Prof. Thomas Herring Room A;
From you host … Dr. H. Introduction Communications design requires us to think about the following issues: Communications design requires us to think.
Principles of the Global Positioning System Lecture 08 Prof. Thomas Herring Room ;
Radio Astronomy Applications Group Kashima Space Research Center IUGG2003, Sapporo (C) ISAS Orbit Determination of The NOZOMI Spacecraft using Differential.
M.P. Rupen, Synthesis Imaging Summer School, 18 June Cross Correlators Michael P. Rupen NRAO/Socorro.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
WEC meeting TED status and WEC timing.
Variability.
Thomas Herring, IERS ACC, MIT
Copyright © Cengage Learning. All rights reserved.
SUR-2250 Error Theory.
Chapter 7. Classification and Prediction
Lutetia Flyby Rosetta Radio Science Investigations RSI
ASEN 5070: Statistical Orbit Determination I Fall 2014
ASEN 5070: Statistical Orbit Determination I Fall 2015
EEE4176 Applications of Digital Signal Processing
GWDAW - 8 University of Wisconsin - Milwaukee, December
Statistics: The Z score and the normal distribution
High-Precision Astrometry of the S5 polarcap sources
ASEN 5070: Statistical Orbit Determination I Fall 2015
L. Kogan (NRAO), S. Likhachev, I. Girin, & V. Ladigin (ASC)
SC/ UNIT- 5 CBS RADARSAT / KARTHIKA A, AP/ECE
Mattia Mercolino, ESA/ESOC
MICROSECOND TIME KEEPING TO IMPROVE POWER SYSTEM CONTROL & OPERATION
Unfolding Problem: A Machine Learning Approach
TWSTFT using DPN signals
Astrometry Observation of Spacecraft with Phase delay
Orbit Determination of The NOZOMI Spacecraft using Differential VLBI Technique According to the ISAS announcement the NOZOMI has completed its final Earth.
Kamil Teke and Johannes Böhm
Interferogram Filtering vs Interferogram Subtraction
Early indications of performance
Nonlinear regression.
(National Astronomical Observatory of Japan)
Basic theory Some choices Example Closing remarks
Principles of the Global Positioning System Lecture 14
Principles of the Global Positioning System Lecture 11
Correlator Growth Path
Agenda Background and Motivation
Unfolding with system identification
Planetary Radio Interferometry and Doppler Experiment (PRIDE)
Presentation transcript:

VLBI Observation for Spacecraft Navigation (NOZOMI) – Data Processing and Analysis Status Repot M.Sekido, R.Ichikawa,H.Osaki, T.Kondo,Y.Koyama(CRL) M.Yoshikawa,T.Ohnishi(ISAS), W.Cannon, A.Novikov (SGL), M.Berube(NRCan), NOZOMI VLBI group(CRL,ISAS,NAOJ,GSI,…) Today, I wish to report current statue of our approach to SC navigation with VLBI. We are collaborating with ISAS of Japan, SGL, and NRCan.

Spacecraft Navigation with VLBI: Motivation Required for increased accuracy for future space missions: For landing, orbiting, & saving energy SC Astrometry R01 R02 VLBI + R&RR Requirements for navigation accuracy is increasing in space missions.

NOZOMI’s Earth Swing-by NOZOMI was launched in July 1998. Due to some troubles, new orbit plan with Earth swing-by was proposed. R&RR observations were difficult in some period Apr. May Mar. Jan. Feb. Jun. May 22, 24, 27 June 4 VLBI Observations NOZOMI was Japanese first Mars mission lunched 1998. Its orbit plan was changed due to some problems. And eventually, it went to Mars with two Earth swing-by. During these two swing-bys, a request for supporting with VLBI was arose. Because they are afraid loosing R&RR data during that period, since the high gain antenna of the SC faced to the the instead of the Earth. I will talk here about the experiments at the end of May and beginning of June. The NOZOMI was approaching to the earth for the second swing-by at these time.

Japanese and Canadian VLBI Stations participated in NOZOMI VLBI observations. ISAS,CRL,NAOJ, GSI,Gifu Univ, Yamaguchi Univ. Hokkaido Univ. SGL, NRCan supported. Algonquin SGL & NRCan Tomakomai (Hokkaido Univ.) Mizusawa (NAO) Usuda (ISAS) Gifu (Gifu Univ.) Tsukuba (GSI) Yamaguchi (Yamaguchi Univ.) VLBI observations were made by wide support from Japanese VLBI community and Canadian groups. We appreciate for their support and could get important experience of SC VLBI observations. Koganei (CRL) Kagoshima(ISAS) (uplink) Kashima (CRL)

For astrometry of S.C. Tasks to be done are VLBI for Finite distance radio source A New VLBI delay Model corresponding to the CONSENSUS model. Narrow band width signal Group delay or Phase delay Delay Resolution: (nano/pico seconds) Ambiguity problem Data Processing and Analysis software IP-sampler boards recording to HD Software correlation & Analysis software For astrometric analysis of SC coordinates, tasks to be done are making a formulation of observation equation corresponding to the consensus model. The signal from SC is not so wide as that of quasar. The delay resolution is up to oder of nano seconds in case of group delay. To increase the the resolution, we can use phase delay. But we need to solve ambiguity for that. For this analysis we developed a software correlator and own analysis software.

VLBI delay model for finite distance radio source Normal VLBI VLBI for finite distance radio source B X Y S B X Y RX0 K I will introduce the formulation of delay model of Finite distance radio source, briefly here. Delay of Normal VLBI is expressed by solar products of source vector and baseline vector. Corresponding one for finite distance radio source can be expressed in the same form, if we used a pseudo source vector defined by this way. This was proposed by Fukushima in 1993. Based on this form, we made a coordinates transformation in terms of general relativity. (Fukuhisma 1993 A&A)

VLBI delay model for finite distance radio source CONSENSUS MODEL (M.Eubanks 1991) Finite Distance VLBI MODEL (Sekido & Fukushima 2003) Obtained formula is quite similar with the Consensus model but different at some terms.

Analysis Procedure Compute a priori (delay, rate) (C) and partials We modified CALC9 for our use(finite VLBI). (Thanks to NASA/GSFC group for permission to use) Extracting Observable (tg, dtg/dt, tp)(O) with software correlator. Computing O-C and least square parameter estimation We made implementation this new delay model in a software by modification of CALC9. Thanks to GSFC/NASA group for permission to use that. Observables are derived by software correlator. Then residual of O-C was analyised by least square fitting of parameters.

Group Delay(Post-fit Residual) Rate residual This is an example of post fit residual of least square analysis with group delay and delay rate. The delay residual are distributed in the same order of the closure of dela, as you see. Delay Residual

Group Delay (Domestic Baselines) 6/4(R&RR) 6/4(VLBI) June 4 Orbit motion May 27 This is preliminary result of radio source coordinates in celestial sphere estimated with Japanese domestic baselines. The reason of the Algonquin baseline is not included will be shown later. The origin of this plot is the coordinates of the SC orbit determined by R&RR measurements by ISAS. The SC is moving rather rapidly since it is near the earth and approaching. Our results are almost consistent with OD of ISAS and JPL within the formal error. But the error bar is in order of arc seconds because of low delay resolution and using Japanese domestic baselines. Origin is Orbit on May 27, which was Determined by ISAS with R&RR Origin is Orbit on June 4.

Phase delay Closure of Phase delay (Kashima-Usuda-Tsukuba) Phase delay is also another approach to get high angular resolution even with short baselines. A correlation software to extract phase delay with main carrier signal was developed. The signal to noise ratio was much improved since only frequency around the main carrier is used. Fringe phase was extracted with high SNR. Since the SC was observed for a long time without switching, we could connect phase delay without ambiguity in this case. Closure of the phase delay was taken to see the accuracy of observable. This is a plot of time span of about 3 and half hours. The drifting parts of phase are due to known problem of recording or processing. Please ignore that. The closure delay is distributing quite uniformly in flat line. This indicates phase delay observable is extracted correctly and its precision is about a few tens of pico seconds.

Phase Delay Analysis 4 June 2003 Post Fit Delay Residual (sec) By using these phase delay observables, we can estimate SC coordinates. The total amount of ambiguity is not known but it can was estimated with clock offset of each stations. The residual is distributing in order

The OD(ISAS) is correct? True delay rate is obtainable from Doppler data. DS ~ 6 arc sec Comparison with a priori dt/dt computed from XYZ(OD) (9000km) seems to be correct, since Then, is XYZ(OD) really correct? Or remaining bugs in our analysis ?.

Summary NOZOMI VLBI observations were performed with domestic and intercontinental baselines. Finite VLBI delay model was derived. An analysis software is developed with that delay model based on CALC9. Preliminary astrometric SC coordinates were obtained with Group/Phase delay observables. Problem of inconsistency in the coordinates need to be solved. Solution with full baselines have to be obtained. Next step:SC Astrometry-> Orbit estimation

Orbit of NOZOMI Space Apr. May Mar. Jan. Feb. Jun.

Group Delay (Range signal) Closure Observation mode = 2MHz, 2bit Accuracy of delay observables is shown by closure delay in this panel. The range signal from space craft is moderated and spread in range of a few MHz. So group delay can be determined. But the precision of the delay is in the order of several tens of nano seconds. There is space for improvement of delay accuracy. Actually, JPL group are doing DDOR in order of nano seconds. In anyway, the delay resolution is much worse than usual geodetic VLBI using quasors. So long baseline is important if you use group delay for spacecraft navigation.

Spacecraft Navigation with VLBI : Motivation Required for increased accuracy for future space missions: For landing, orbiting, & saving energy JPL/NASA has been employed Japanese Space Agency (ISAS+NASDA=JAXA) NOZOMI(Japanese Mars Explorer) Needs to support orbit determination with VLBI. Mission as our own Project This sort of VLBI application is now new as you know. JPL/NASA is using it from 1980s. But only NASA is doing that today. Japanese Space Agency want to use for their future space missions. So we started collaboration with them. There was a request of VLBI support for NOZOMI, especially. I will talk about it in next slide. And we put it one of mission our own project.

Spacecraft Navigation VLBI + R&RR

Observation:IP-VLBI Sampler board K5 VLBI System Sampling rate:40k-16MHz Quantization bit: 1-8bit 4ch/board 10MHz,1PPS inputs The data was taken by PC-based data acquisition system, a part of K5.