BIG SKY COUNTY WATER & SEWER DISTRICT NO. 363

Slides:



Advertisements
Similar presentations
JOINT MEETING OF ESSEX AND UNION COUNTIES Virtual Plant Tour.
Advertisements

Home Work Each day 3780 m3 of wastewater is treated at a municipal wastewater treatment plant. The influent contains 220 mg/L of suspended solids. The.
What happens to water after we’re done with it?
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
The Vigyan Vijay Foundation Appropriate technology for sustainable development Case Study of Dewats Plant at a Home Components of wastewater treatment,
Treatment of Waste Brine from a Brackish Reverse Osmosis Plant
Treated Wastewater Reuse For Landscape Irrigation and Amenity Lake Evaporation Make-Up Presented to: Houston Land/Water Sustainability Forum May 13, 2008.
Dual Use of Ocean Outfall Pipeline Tertiary Effluent Delivery to Two Golf Courses Using Existing Secondary Effluent Pipeline Presented by Dana K. Ripley.
An-Najah National University Civil Engineering Department
Coles Point Wastewater Treatment Plant
 Carry both sewage and storm water.  During average rainfalls the volume of water is 5-15 times greater than normal.  Sewage treatment plants are not.
Calaveras County Water District Capital R&R Program Funding Options March 25,
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Page 1 Central Kitsap Treatment Plant & Kingston Treatment Plant Planned Improvements Commissioner Josh Brown April 5, 2012.
Spokane River Forum 26 May 2013 Spokane’s CSO Reduction Status.
 Why  Project Status  Future Course Lime Sludge Biosolids Water/Wastewater System Life Cycle Raw Water Wells (12) Water Treatment Plant Storage Tanks.
Innovative Green Building - High Rise Residential - Water Reuse American Water Applied Water Management Group.
City of Kimball Stormwater Re-use Project Protecting our Water Resources – a Forum Series for Policy Makers March 30, 2011.
Approved Due Diligence Scope Property Survey Topographic Survey Geotechnical Exploration Streams and Wetlands Threatened & Endangered Species Cultural.
PINEY POINT Water Management Plan FY04/05.
DOMESTIC WASTEWATER TREATMENT FACILITY. 1 st STAGE DIGESTER DISCHARGE DISINFECTION - Gas chlorination PRELIMINARY TREATMENT CLARIFIER AERATION BASIN COMPOSTING.
Martha Davis Inland Empire Utilities Agency April 8, 2010.
Spokane River Forum 23 May 2011
By Shantanu Mane Vaidehi Dharkar Viral Shah
Michael Tamblin, P.E., BCEE Stearns & Wheler, LLC Protecting and Enhancing the Ramapo Watershed – A Designated Sole Source Aquifer Supplying New York and.
1. WHAT FACTORS EFFECT WATER QUALITY? 2. WHY DO YOU THINK DRINKING WATER IS TREATED BEFORE YOU DRINK IT? Bell Ringer.
VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT WATER RESOURCES & UTILITIES DIVISION Mike Ulrich, Director Mike Ulrich, Director.
Project History Town of Newport Population: 550 Vermillion County Seat.
Southeast Energy/Water Interdependence Exercise Basic Drinking Water Treatment EPA-R4 Drinking Water Section April 25, 2007.
Waste Water Facilities Plan Update November 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP Public Hearing Presentation.
Institute of Urban Water Management. Technical & Chemical Laboratory.
Wastewater Reuse Expansion in Austin Ryan Grosskopf.
The Annual Community Report Taylor Middleton, September 4, 2015.
Direct Nonpotable Water Reuse Feasibility Study Public Meeting October 2011.
USES OF WATER Introduction In Stream Water Use Out Stream Water Use Water statistics.
San Gabriel Valley Water Forum Mike Sullivan Monitoring Section Head, Los Angeles County Sanitation Districts x2801.
Wastewater Infrastructure & the Environment 7 million dry tons of biosolids recycled yearly.
Maximizing Water Supply Sustainability for the Goleta Valley Ryan Drake Water Supply and Conservation Manager 2015 Central Coast Sustainability Summit.
Geospatial Analysis of the Big Spring, TX Area. Types of Wastewater Reuse Non-Potable Reuse Watering lawns Industrial cooling Indirect Potable Reuse Aquifer.
City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005.
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
Oregon Natural Treatment Systems for Wastewater Natural Treatment Systems – A Water Quality Match for Oregon’s Cities and Towns June, 2014 Oregon Department.
Reclaimed Water Solution for Disposal Capacity Village of Bald Head Island 2015 NC AWWA - WEA Annual Conference November 17, 2015.
Public Information Meeting Wastewater Treatment January 26, 2016.
Membrane Bioreactors World’s best practice for Winery Wastewater Treatment Dr. Matt Savage MIChemE. CEng.
1 CouncilUpdateJan702pet104i ppt ELLIS CREEK WATER RECYCLING FACILITY PETALUMA, CA North Bay Watershed Association Conference April 9, 2010.
BY: MARTY WANIELISTA, PHD., P.E. BMPTRAINS MODEL: BACKGROUND INFORMATION ON HARVESTING.
EU Sanitation Policies and Practices in the 2008 International Year of Sanitation Sustainable Sanitation for Rural Bulgaria Diana Iskreva-Idigo Earth Forever,
Began funding reclaimed projects in projects funded 325 projects completed $435M leveraged $1 Billion 970 miles of pipelines 248 MGD reuse capacity.
Village of Morton Wastewater Treatment. The Village of Morton Wastewater Treatment Department duties Operate and maintain 2 treatment plants (Biosolids.
Our Water Systems
Phase II and Compost Facility Upgrade Projects February 16, 2012.
NAS JACKSONVILLE WASTEWATER REUSE PROJECT
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
Town of Davie Utilities Department Renuka M. Bajnath John McGeary.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
Feasibility of Bass Lake Wastewater Treatment
Big Sky Annual Community Report
Recycled Water Project – Sharon Heights GCC
Upper Gallatin Drought/Water Supply Focus Group
City Council Meeting February 16, 2010
Upper Gallatin Drought/Water Supply Focus Group
Presented by thomas j. Haglund, general manager
CTC 450 Review Waterworks Operation
מפעל ביולוגי מכני בשיטת בוצה משופעלת
Big Sky Wastewater Facility Plan Update
Big Sky Wastewater Facility Plan Update
Montgomery County Municipal Utility District No. 8 January 4, 2019
Wastewater Permitting Updates
August 30, 2019 Robert Beltran, PE , BCEE
Presentation transcript:

BIG SKY COUNTY WATER & SEWER DISTRICT NO. 363 WASTEWATER RECLAIMATION THROUGH SPRAY IRRIGATION

7½ Miles MOUNTAIN VILLAGE DISTRICT BOUNDARY 4 Miles MEADOW VILLAGE

WASTEWATER RECLAIMATION THROUGH SPAY IRRIGATION BACKGROUND INFORMATION Existing District Sewer System Service Area Build-out ~40% 100 MG Per Year Total Flow 274,000 GPD Average Flow

EXISTING SEWER SYSTEM

MOUNTAIN VILLAGE LONE MOOSE MEADOWS MEADOW VILLAGE ASPEN GROVES SPANISH PEAKS

GOLF COURSE IRRIGATION ANNUAL FLOW= 100 MG PER YEAR NEW TREATMENT PLANT STORAGE PONDS GOLF COURSE IRRIGATION

MEADOW VILLAGE GOLF COURSE

NEW SBR TREATMENT PLANT AERATION POND 8 MG POND 1 67 MG POND 3 18 MG FILTER TREATMENT PLANT AERATION POND 8 MG POND 1 67 MG POND 3 18 MG

CURRENT SEWER FLOWS SPRAY IRRIGATION

FORCEMAIN PIPELINE Meadow Golf Course YC Golf Course MOUNTAIN VILLAGE MEADOW VILLAGE Meadow Golf Course YC Golf Course FORCEMAIN PIPELINE

YELLOWSTONE MOUNTAIN CLUB GOLF COURSE AREA

WASTEWATER VOLUMES Total Wastewater Annual Flow = 100 MG Discharge: 99% to Meadow Village Golf Course 1% to Yellowstone Club Golf Course 0% to Gallatin River Wastewater Biosolids 100% to Compost

QUESTIONS ?

QUESTIONS?