SMITH MIDDLE SCHOOL CONSTRUCTION UPDATE SCHOOL BOARD PRESENTATION - 8/7/2017
UNDERGROUND INFILTRATION BED 70‘ X 283’ X 3’ D BED
DEMOLITION OF AREA FOR AUDITORIUM MAKING SURE THAT WE ARE KEEPING EXISTING SANITARY /DRAIN LINES FLOWING DURING CONSTRUCTION.
HYDROSEEDING TO PREVENT EROSION OF NEW EXCAVATED AREAS
ROCK CONSTRUCTION ENTRANCE TO KNOCK THE MUD OFF THE TIRES AS MUCH AS POSSIBLE BEFORE IT HITS THE PAVEMENT. AT THE END OF EACH DAY THE CONTRACTOR WILL BE RUNNING A MOTORIZED BRUSH OVER THE DRIVE TO KEEP IT AS CLEAN AS POSSIBLE THRUOUT THE EXCAVATION .
CLASSROOM ADDITION PREPARATION CLEARING ALL DEBRIS OUT OF THE WAY. EXCAVATING TO THE CORRECT ELEVATION GETTING PREPARED TO START FOOTERS