LHC installation status

Slides:



Advertisements
Similar presentations
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Advertisements

M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
LHC VACUUM SYSTEM: 2012 REVIEW AND 2014 OUTLOOK G. Lanza, V. Baglin, G. Bregliozzi, J.M. Jimenez EVIAN 2012.
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
LHC status and commissioning plans Gianluigi Arduini, CERN, AB/ABP 10 th September 2007 Acknowledgements: R. Bailey, M. Lamont.
LTC Extended days, 03 March’08 J.M. Jimenez, AT Vacuum Group LHC Vacuum commissioning J.M. Jimenez On behalf of AT-VAC.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
1 LHC vacuum Rossano Giachino Acknowledgments Jimenez,V.Baglin,J.C.Billy,I.Laugier Rossano Giachino November 2007.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
R.Bailey, LHCCWG, January 2007 LHC Commissioning Working Group 2006 Presented to LTC in November and MAC in December Presented to LTC in November and MAC.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
EPPOG - LHC Machine LHC machine (and some outreach) Mike Lamont.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
12th HL-LHC Parameter and Layout Committee meeting.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
Injectors & LHC report K. Foraz on behalf of OSS members 01/11/13LSC - EN-MEF-OSS1.
The integration of 420 m detectors into the LHC
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
TE-CRG Activities D. Delikaris, TE-CRG.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
LHC Machine Advisory Committee Meeting no.19 QRL status 16 June 2006 G. Riddone, AT-ACR On behalf of the QRL team.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
LHC experience with installation Katy Foraz March 6th 2008, Dubna GDE Meeting - ILC Conventional Facilities and Siting Workshop ***********************************
Hardware Commissioning Review BDI Equipment
Status of the LHC Project
Superconducting Links R2E and Avalilability Workshop
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Wednesday 8.9 External crossing angles:
Powering LHC magnets version 30/3/2007.
ELENA installation and commissioning status
Minimum Hardware Commissioning – Disclaimer
BA6 – crab cavity activities in EYETS
Status of LHC installation & New Installation Schedule
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
LHC schedule.
on behalf of the RF group
Update of cryogenic activities
The LHC - Status Is COLD Is almost fully commissioned
LS1 Committee January 24th, 2014
Long Shutdown for the LHC: Vacuum Beam Pipes
Consequences of warming-up a sector above 80 K
Powering the LHC Magnets
Hollow e- lens, Cryogenic aspects
Powering from short circuit tests up to nominal
The 11T cryo-assembly: summary of design and integration aspects
Status of the BLHC ….work in progress! Mike Lamont CERN/AB 18/01/2008
K. Foraz on behalf of OSS members
Mike Lamont 4th HERA and the LHC workshop 26th May 2008
A Class Calendar in PowerPoint
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
WP3 Meeting – December the 10th 2015 H. Prin
BLM planning 03/03/2014.
US-LARP Task: IR Commissioning
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
| January Sunday Monday Tuesday Wednesday Thursday Friday
US-LARP Task: IR Commissioning
Hardware Commissioning
Review of hardware commissioning
January Monday Tuesday Wednesday Thursday Friday Saturday Sunday 30 31
Presentation transcript:

LHC installation status Installation in the Arc and DS: QRL Cryo-magnets DFBA’s Interconnection Installation in the Straight Sections: Stand-alone cryo-magnets and Low-β DFBM, DFBL, DFBX Power Converters Collimators Beam Instrumentation Injection and Dump RF system Beam pipes, etc … 08 December 2006 Sylvain Weisz - MAC

Global Installation Status in the Arcs and DS Sector QRL Magnet Interconnection Closure 7-8 Cold tested (partial: S/s A &B) 100% in place Done November 06 8-1 Cold tested In progress (70% done) February 07 4-5 Pressure tested In progress (80% done) January 07 3-4 98% in place In progress (50% done) April 07 5-6 97% in place In progress (20% done) May 07 6-7 87% in place Starts February 07 July 07 2-3 60% in place Starts December 06 1-2 Starts January 07 Starts April 07 August 07 08 December 2006 Sylvain Weisz - MAC

7-8: Arc and DS Interconnection closure achieved on schedule week 45 Pressure test performed November 25-26th: Buckling of inner triplet external heat-exchanger at 12 bar (9 bar differential pressure with B line) Test continued up to 27.5 bar on “stand-alone” and continuous cryostat after isolating the inner triplet All important leaks have been found and repaired in a record time  Cool-down preparation is on-going to power test sector 7-8 as close as possible to schedule (March 07), without the inner triplet B DFB circuits E, F C & CM, D Incident at 12 bar Restart of the pressurisation 08 December 2006 Sylvain Weisz - MAC

8-1: Arc and DS Availability and transport of equipment: All cold elements in place, including DFBAP & DFBAA Racks: QPS (Quench Protection Sys.) , Beam Instrumentation, PC (for correctors) in place; Cryo Instrumentation still to do Advancement of the interconnections Progress suffers from non-conformities Cannot contract to IEG on a lump-sum basis 08 December 2006 Sylvain Weisz - MAC

4-5: Arc and DS Availability and transport of equipment: All cryo-magnets in place, DFBAI in place, DFBAH transported today Racks: QPS and PC in place; Beam and Cryo Instrumentation still to do Advancement of the interconnections Contractant paid on a lump-sum basis since September 06 Closure in January 07 on schedule 08 December 2006 Sylvain Weisz - MAC

Estimated availability 3-4: Arc and DS Availability and transport of equipment: All cryo-magnets available are in place, still missing are: Racks: QPS (>80%) and PC in place; Beam and Cryo Instrumentation still to do Advancement rate of the interconnections: Element Estimated availability Comments DFBAG 11/01/2007 At pressure & leak tests SSS525 – Q11.R3 31/01/2007 At cold test in SM18 SSS515 – Q10.R3 18/12/2006 At storage before SMI2 SSS514 – Q9.R3 23/01/2007 SSS512 – Q7.R3 12/12/2006 DFBAF Consequence of late delivery of “500 serie” from ACCEL 20 IC/week currently achieved (planning assumption) 08 December 2006 Sylvain Weisz - MAC

Estimated availability 5-6: Arc and DS Availability and transport of equipment: All cryo-magnets available are in place, still missing are: Racks: QPS and PC in place; Beam and Cryo Instrumentation still to do Advancement of the interconnections: Element Estimated availability Comments DFBAJ 09/02/2007 Assembly in progress SSS529 – Q11.R5 16/04/2007 Cold mass arrived Wk 48 SSS373 – Q17.L6 15/12/2006 At cold test in SM18 SSS530 – Q11.L6 DFBAK 01/03/2007 Bus bar bundles missing Late availability of Q11 will delay the interconnect closure Interconnect work started 4 weeks ago with 1 team, 2nd team came 2 wks later  20 IC/wk with 2 teams 08 December 2006 Sylvain Weisz - MAC

Estimated availability 2-3 & 6-7: Arc and DS Transport of cryo-magnets in progress: Up to week 45: interconnect in Sector 7-8  no passage Monday to Thursday Transport dipoles Friday, Saturday and Sunday to Sector 6-7 Transport dipoles Monday to Thursday to Sector 2-3 SSS can be lowered at Point 6, no restriction there Since week 46: passage possible every night through Sector 7-8, until start of cool-down Give full priority to the completion of Sector 6-7 Complete half of Sector 2-3 (point 3 side) to start the interconnection work week 51 Present situation: Sector 2-3: 92 MB and 26 Arc & DS SSS in place, Missing in ½ sector on point 3 side: Alignment on-going, will be Ok to start interconnect on December 18th Sector 6-7: 131 MB and 41 Arc & DS SSS  last dipole in Sector 6-7 transported by the end of next week Element Estimated availability Comments DFBAE 25/03/2007 Upcoming delivery SSS509 – Q9.L3 31/01/2007 At cryostating SSS099 – Q19.L3 19/01/2007 At cold test in SM18 MB1415 18/12/2006 At preparation in SMI2 MB1396 17/12/2006 Ready 08 December 2006 Sylvain Weisz - MAC

1-2: Arc & DS QRL pressure test on October 28  Successful Junction Region in UJ18 (close Pt 1) Step and Fixed Point in UJ22 (close Pt2) QRL pressure test on October 28  Successful 2 weeks of consolidation, sector liberated Week 45 Jack installation in progress (100% in place and aligned, 50% fixed) Jumper preparation in progress (cutting of QRL service module header) Ready to start transport of cryo-magnets in January 07 08 December 2006 Sylvain Weisz - MAC

Global Installation Status in the Long Straight Sections Functionality Location Installation Status Beam Injection LSS8R Collimators, MSI & MKI in place, bakeout of beam pipe in progress LSS2L TI2 installation starts in April, last insertion to be installed Beam Collimation LSS3 Warm magnet installation just started, collimators available in Feb. 07 LSS7 Services ready, magnet installation in Jan. 07, collimators in Jun. 07 Beam Acceleration LSS4 RF cavities and beam instrumentation in place, vacuum inst. on-going Beam Collision LSS1 Low-β and Matching Section in place on left side, vacuum on-going LSS2 Low-β in place on right side LSS5 Low-β on both sides, Matching Section and vacuum inst. on left side LSS8 Low-β, Matching Section, instrumentation and vacuum on both sides Beam Dump LSS6 MSD inst. on-going, dump line and absorbers in place on both sides 08 December 2006 Sylvain Weisz - MAC

Beam Injection at Point 8 TI8 installed and tested end of 2004 Injection elements in place in main tunnel: Test of MKI injection kicker in progress Installation of beam-pipes and bake-out preparation in progress TDI collimator ready, will be installed next week One “small” problem: need a new recombination chamber, aperture too small TCTH MKI MSI TCDI 08 December 2006 Sylvain Weisz - MAC

RF and Beam Instrumentation at Point 4 RF Cavities and Klystrons: All "stand-alone" magnets in place (LU, D3, D4, Q5, Q6 left & right) All DFBM in place, interconnect in progress Beam monitors and vacuum elements: All beam position monitors in place (BPL in Q5-Q6.R4 installed week 51) Ion profile monitors and wire scanner mechanisms installed at a later stage Bake-out of the straight section starts 08/01/2007 08 December 2006 Sylvain Weisz - MAC

Experimental Insertions at Point 1, 2, 5 & 8 LSS1 Left: Low-β, DFBX, D1(warm), D2 and MS (Q3,Q4&Q5) in place and interconnected Beam pipe installation in progress, bakeout starts next week DFBLA delivery expected on December 22nd LSS2 Right: Low-β triplet in place, installation of DFBX postponed until further notice LSS5 Left & Right: Low-β, DFBX, D1(warm), D2, Q4 in place on both sides, Q5 & Q6 on left side Interconnection and beam pipe installation in progress on left side Work on Low-β stopped, but interconnect already well advanced on left side LSS8 Left & Right: Low-β, DFBX, D1, D2 and MS in place and interconnected All DFBM installed and interconnected Beam pipe and instrumentation in place, NEG activated on left side 75% of low-beta quads in place 08 December 2006 Sylvain Weisz - MAC

Beam Ejection at Point 6 Integration of dump line in main tunnel: All Stand-alone quads (Q4,Q5) and DFBMM in place on left side Installation of septum magnets (MSD) in progress: Integration of dump line in main tunnel: Modifications of IFS boxes in conflict with dump line to be done in-situ Supporting of dump line above magnet string still to be finalised Round to oval transition for TCDQM masks still to be designed 08 December 2006 Sylvain Weisz - MAC

Installation and tests of the power converters Power Converter Short Circuit Tests in progress ~100% Power Converters in place, ~2/3 tested 08 December 2006 Sylvain Weisz - MAC

On-going installation of the access control Personnel and Material Access Devices (PAD and MAD) at surface Underground Sectorisation 08 December 2006 Sylvain Weisz - MAC

LHC Installation Summary QRL: installation completed and tested in all sectors Cryo-magnets: cold mass production completed on schedule 19 MB and 9 Arc SSS still to cryostat and test  done by end of January 07 992 Main Dipoles, 285 Arc SSS, 70 Special SSS and 18 Low-β are in place today Average transport rate of 28 cryo-magnets/week  done by end of March 07 DFB: 17 DFBM (74%) and 6 DFBA (37%) are ready Interconnection: on-going in 4 sectors in parallel, at nominal rate Pressure tests of Sector 7-8 successful for Arc, DS and MS ELQA at warm in progress, flushing and cool-down preparation by end of year Expect to start power tests in March 07, but without the low-β quads 08 December 2006 Sylvain Weisz - MAC