Monday 3rd September - morning

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

LHC SUMMARY – WEEK 36 Coordination: Mike Lamont & Bernhard Holzer LHC weekly summary 1.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
LHC Status Tue Morning 22-Aug
Wednesday 3rd October - morning
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Wednesday September 14th
Luminosity lifetime – fill 2932
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
Tuesday 11th September LHCb dipole presently fault off
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
Monday 11/07: Recovery Plenty of accesses.
Thursday 09:30 VdM scan for CMS, standard ADT gain.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Tue :25 Beams dumped due to RF vacuum interlock
Summary of Week 11: 14 – 21 March
Wednesday 31 October: Morning
Thursday morning 09:30 Dump of pPb fill.
Note: squeeze in Atlas, CMS, LHCb and Alice on going
LHC Morning Meeting - G. Arduini
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Thursday 10th May - morning
Wednesday 8th August & night
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Friday morning 10:30 Optics measurements and corrections.
Saturday – Morning 7:36 beams dumped
LHC Morning Meeting - G. Arduini
Finally.... We had to wait a long time.... We had many problems....
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Sunday
Saturday 7th May Sat – Sun night
Aims for the week Recover from technical stop and precycle at 10A/s
LHC Morning Meeting - G. Arduini
Monday 14:00 beam dump Access:
Friday 25 bunch fill dumped just before (BLM in 5)
Saturday 3rd November - morning
Thursday – Morning Energy matching at injection with H CODs
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Cold compressor speed S45
LHC Status Tue Morning 22-Aug
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
LHC - Week 38 Technical stop: Katy Foraz
Tuesday In the morning test cycle with probe for Q’ measurement.
Thursday
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 24 September 2011.
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Thursday 20th July - morning
Another Immortal Fill….
Monday 10th December - morning
Monday 27th August & night
Wednesday 26 October 2011.
Saturday 6th October 05:38 STABLE BEAMS # :06 OP dump
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Tuesday
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Monday 3rd September - morning 08:35 Intervention on PLC for vacuum in PM76 is finished sector 78 tripped cause by a vacuum reading on the QRL PLC - has been exchanged 09:10 3 persons enter in PM85/UJ83 for an urgent cryogenic intervention (with RP) Leak in seal of DFBXG.L8 10:15 access in PM15 for inner triplet R1 finished. 10:25 access in US25 for cryogenics check 10:40 access in point 8 for cryogenics finished 11:10 Start pre-cycle 04-09-12 LHC status

Monday 3rd September - afternoon MCOX and skew sextupole tests in shadow of 18 kV cable tests in SPS Global PMA, Powering, IQC and XPOC analysis servers and GUIs redeployed by Roman. 12:25 Injecting probes for MCOX tests 14:30 skew sextupoles polarity checks 17:30 Filling for physics 18:30 Injecting physics beam 20:30 Stable beams fill 3025 Initial luminosity 6.2e33 cm-2s-1 Average bunch current going into collisions: 1.56e11 ppb B1 Vertical instability during collision BP.. Tweaked Q’, octupoles 04-09-12 LHC status

4th September – early morning 06:08 lost 3205 to lost the sector 23 due to the trip of RQD/F. MPE piquet called, reason of the trip not clear but green light to restart 133 pb-1 in 9 hours 40 minutes 07:35 The switches of the RQF and RQD of sector 23 have cooled down and we go for the precycle 04-09-12 LHC status

Stephane Fartoukh, Rogelio Tomas et al Triplet octupoles The RCOX at full current generate a tune spread equivalent to 500A in the MO at beta*=60 cm, but of course 4 times less at 1.2 m, etc. successfully tested the RCOX3 in point 1 and 5 (RCOX3.L1/R1/L5/R5). They are therefore released for powering during the day or in the following days. (Mirko) Polarity checks power the RCOX and try to look for tune shifts. Trimming on the k of the RCOX. Stephane Fartoukh, Rogelio Tomas et al 04-09-12 LHC status

MCOX tests 04-09-12 LHC status

Skew sextupoles OMC measurements summary: KSS polarity We performed ac-dipole measurements of the coupling with individual Beam2 RSS families powered to k=+0.5, for RF trims of +-80Hz. We took data for REFERENCE, A23, A34, A45, A56, A67. Coupling shifts with the dp/p were seen clearly well outside of the error bar. Determination of the polarities will be performed offline. 04-09-12 LHC status

Losses going into collision 3205 CMS off a bit again – lumi scan knobs incorporated 04-09-12 LHC status

3205 – instability VB1 04-09-12 LHC status

3205 – instability VB1 04-09-12 LHC status

MISC QRL gauge problem – sector 76 Fixing the gauge problem would require an access in UJ76. The Cryo team decided to continue since the probability that the back-up gauge also breaks is very little and there is anyway no safety concern for the machine. Updated the temperature limits for MKIs according to instructions from M. Barnes (JW) OFC bug found – deploy fix next TS (Ralph Steinhagen) 04-09-12 LHC status