Motion for the WECC-0135 Standard Drafting Team Option #2 21 Sept 2018 PRESENTATION TO WECC-0135 SDT DJORDJE Atanackovic, Ph.D.

Slides:



Advertisements
Similar presentations
Parallel Flow Visualization/Mitigation Proposal
Advertisements

WECC Operating Committee Request for Discussion and Guidance MOD-001-WECC-RBP-0 Reliability Data Exchange (MOD) October 24, 2013.
Want to be a Path Operator?. No true definition of Path Operator in Reliability requirements, responsible entities listed are RC, TOP, TO, BA, GO, GOP,
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Standards Update WECC Board of Directors Technical Session December 5, 2007 Albuquerque, New Mexico Steve Rueckert Director of Standards.
SIS Report Jerry Smith Albuquerque, NM March 7, 2008.
Western Electricity Coordinating Council Identify, coordinate, and propose solutions to seams issues Participate, monitor and communicate the development.
BAL-002-WECC-1 Contingency Reserves
WECC Operating Committee and Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June 18 & 19, 2009 WECC Reliability Subcommittee.
Status of NERC Standards Activity Joint Guidance Committee Meeting January 23-24, 2007 Steve Rueckert - WECC Director, Standards and Compliance.
1 The document represents the EMSWGs response to recommendation #12 o TOPs should take measures to ensure that their real-time tools are adequate, operational,
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
Brett Wangen, Director of Engineering Michelle Mizumori, Director of Reliability Coordination RC Plan Changes Operating Committee Meeting October 24, 2013.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
North American Electric Reliability Council 1 Coordinate Operations Standard Jason Shaver Standard Drafting Team Chair September 29, 2005.
Allan Wick, CFE, CPP, PSP, PCI, CBCP Chief Security Officer WECC Joint Meeting October 8, 2014.
Steve Rueckert Director of Standards Standards Update June 5, 2014 Joint Guidance Committee Meeting Salt Lake City, UT.
Enhanced Curtailment Calculator (ECC) Jeremy West Sr. Operations Engineer.
Path Operator Implementation Team Report to OC March 25, 2015.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
Frequency Response Initiative Robert W. Cummings Director of System Analysis and Reliability Initiatives NERC Standing Committees September 14-15, 2010.
Peak RCCo Performance Metrics Draft –November 2013.
© Property of ERCOT /06/20041 Overview of SPS in ERCOT February 5, 2004.
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
STATE ESTIMATOR QUALITY TRACKING IN BC Hydro EMS IMPLEMENTATION Dr. DJORDJE ATANACKOVIC, P.Eng. Engineering Team Leader, Power system Applications, Grid.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
ROSE Updates Marianna Vaiman, V&R Energy WECC JSIS Meeting Salt Lake City, UT September 9 – 10, 2014 Copyright © V&R Energy.
Clean Power Plan & Reliability – An Update TEPPC Winter 2016 Meeting February 3 rd – 4 th 2016 Vijay Satyal PhD, Sr. Policy Analyst W ESTERN E LECTRICITY.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Misoperations Reduction Strategy
WECC – NERC Standards Update
Kenneth Silver Los Angeles Department of Water & Power
Protection Relay Modeling for Transient Stability Simulation 10/26/2016 CJ Jing, David Franklin, Kevin Moran.
Western Electricity Coordinating Council
Phase Angle Limitations
WECC Regional Standards Update
Path Operator Implementation Task Force
Updates to the Path Rating Process for Approval by the PCC
Kenneth Silver Los Angeles Department of Water & Power
NERC TPL Standard Overview
PRC-006-RFC-01 Automatic Under Frequency Load Shedding Requirements
Module 4 Smart Grid Implementation Issues
MIC Committee Discussion
Background to The Conference
Reliability & Market Impacts Resulting from RC Expansion
Peak’s Synchronized Measurements and Advanced Real-time Tools (SMART) Working Group (initiated in Oct-2017) Focus on operationalizing Synchrophasor tools.
Cyber System-Centric Approach To Cyber Security and CIP
Transmission As Enabler
Protection Relay Modeling for Transient Stability Simulation 10/26/2016 CJ Jing, David Franklin, Kevin Moran.
Vic Howell – Mgr. Operations Engineering Support
Summary Working Paper drafted by DG REGIO on options for the future of additionality. Conclusions of the first experts meeting on 26 May Conclusions.
Enhanced Curtailment Calculator (ECC)
Proposed Normative Text Changes Concerning QoS IBSS
NERC ATC STANDARDS Update
Pancreas Program Functional Inactivity
Peak Reliability Transitional RC Overview RC User Group May 3, 2018
Coordinate Operations Standard
Eric Whitley/Steve Ashbaker
Misoperations Reduction Strategy
Steve Rueckert – Director of Standards
Steve Rueckert Director of Standards WSC Meeting Overview
Kenneth Silver Los Angeles Department of Water & Power
Reliability & Market Impacts Resulting from RC Expansion
WECC – NERC Standards Update
Peak Reliability IRO Webinar
MIC Committee Discussion
Presentation transcript:

Motion for the WECC-0135 Standard Drafting Team Option #2 21 Sept 2018 PRESENTATION TO WECC-0135 SDT DJORDJE Atanackovic, Ph.D.

Motion: That the WECC-0135 SDT select “Option #2 – Allow Flexibility in Modelling” as the basis for developing a WECC Regional Variance to NERC IRO-002-5, Reliability Coordination-Monitoring and Analysis.

Discussion: Fundmental Benefit/Risk Question: Benefits of RCs modelling remote, insensitive BES elements are non-existent. Major Risks to Reliability of RCs modelling, remote, insensitive BES elements include: Performance is impacted by size of mode: A 20,000 x 20,000 bus matrix takes much longer to solve than a 15,000 x 15,000 or 10,000 x 10,000 matrix, and this will be a significant negative consequence, especially if the RC wants to calculate SOLs /IROLs using real-time transient stability analysis. Robustness will suffer as the risk of State Estimator not solving will increase : Circuits that are not observable, because of failed telemetry, can prevent the State Estimator from converging on a solution for the entire network model Quality will suffer and the risk that real reliability issues may be masked will increase: Inaccurate and untuned telemetry will lower the quality of the State Estimator solution and could shift the study result to incorrect operating points

Option 3: Require a single Interconnection-wide model Main Concerns: RC modelling of remote, insensitive BES elements has no obvious reliability benefit; Impacts to performance, robustness and quality of State Estimator solutions and Advanced Applications are very real risks.

Option 4: Geographic-specific variance Major Concerns: Standards should be based on technical facts and physics as the WECC operates as one interconnected grid, therefore the proposed Regional Variance should apply to all members of WECC; If the US RCs are obligated to include remote, insensitive BES elements in their Network Model this may weaken their performance and as a result impact the entire Western Interconnection; A geographic exemption won’t fully protect BC, Alberta or Mexico from the related problems that arise for US RCs.

Option 1: Rely on Existing NERC Standards Main Concerns: The “No Change” option may not address concerns expressed relative to Network Models used by RCs in the Western Interconnection; Will not require RCs to document their methodologies for developing reliable and efficient Network Models.

Option 2: Allow Flexibility in Modelling Rationale for Option 2: Will require RCs to be clear and transparent about their Network Modelling methodologies; Will naturally foster collaboration and sharing of best practices; Does not add an unreasonable burden to the RCs who will be VERY busy managing Network Modelling and SOL/IROL calculation issues in the next 12 – 16 months.