Knee Loading Device Status Update 1

Slides:



Advertisements
Similar presentations
ADVISORS CHECKLIST A monthly Guide.  Volunteer to help with beginning school activities (e.g., orientation)  Plan membership drive, set a regular meeting.
Advertisements

Team Organization Brittany Capalbo Co-Captain Team 75.
Mission-Based Management March 2007 Electronic CV System Users Group.
THE POSTURE PEDOMETER CUMMERBUND February 2012 Program Review Team Members: Kelly Han Kyle Mauer Kevin Vo Advisors: Dr. Aziz Inan (Faculty) Srija Pidaparthy.
Brainstorming & Project Management
INVOLVEMENT: Behind the Scenes of SLE By: Candice Caldera & Joyce Gehr.
Team Member(s) Your name. 25 January SOLD: BUY: Copy of stock pdf.
Knee-Loading Device Group Members: Jonathan Coulter Liang Dong Chris Holmes Haroon Osmanzada Faculty Advisors: Dr. Sebastian Bawab Dr. Stacie Ringleb Naval.
ANKLE POSITIONING AND LOAD DEVICE Faculty Advisors: Dr. Stacie Ringleb and Dr. Sebastian Bawab Vasile Grigorita Dominick Hudson Jin Hyuk Kim Bryan Mazac.
1 Insert Project Title Here Tech Group Michigan Project Kick Off Date Insert Team Picture Here Insert team member names here.
Energy Group Kilowatt Hour Meter Date: 11/14/2011 Project Update Team Leader: Kevin Manieri Team Advisors: Dr. Fish + Tom Austin Students: Dave Allen,
EE/CS 481 Spring /28/2015 1:18:59 PM University of Portland School of Engineering Project Chitwood eNVy Team Will Dana Mike Dillon John Guptill.
Team Members: Jonathan Coulter Liang Dong Chris Holmes Haroon Osmanzada Faculty Advisors: Dr. Sebastian Bawab Dr. Stacie Ringleb Naval Medical Center Advisor:
Jonathan Purday Senior Communications Advisor Oxford, February 2012 Europeana
CS-EE 481 Spring February, 2006 University of Portland School of Engineering Project Lost Intelligent Leg Prosthesis Team Eric Iversen Kathryn Lowe.
Mid Semester Presentation Draft February 17, 2011.
VirtuLab: Web- Based Flow Visualization Facility Project Update Group Members: Sydni Credle Karen Davis Justin Scott Professor:Mentor: Dr. LuongoDr. Shih.
EE/CS 480/481 12/12/ :16:40 PM University of Portland School of Engineering Project Yew Inline Power Monitor with Cost Analysis Team Zubin Bagai.
TEAM PCG JANUARY PROGRAM REVIEW Garrett Gustafson (Spring Team Lead) Ben Co, Wendelin Mueller, and Julia Weimar-East Project LightBox Primary Faculty Advisor:
Presentation Title | May 4, 2009 Records Retention and Disposition Update Date: August13, 2014 Contracts and Compliance.
 Great resume builder  A way to network with your peers, faculty, and professional community  Extra Credit!
Remote Pet Feeder Project Status Update Team member1 Team member2 Team member3 Team member4 9 February 2016.
Brainstorming & Project Management ENGR Brainstorming  Proposing new ideas  Free flowing exchange of ideas  No judgment  No decisions  Build.
3/21/20161 Project Title Team Name Team membership Customer (if you have a customer) EEL3923C Junior Design (S11) Date: Project #
Federal Reimbursement Update MRAM - April 10, 2014 Tami Sadusky, Executive Director Research Finance and Operations University of Washington.
TechIT: A Work Order System Team Members: Marjorie Zalaya, Duc Le, Kevin Castillo, Minh Ha, Brandon Ung Faculty Advisor: Dr. Chengyu Sun ECST Liaison:
February 11, 2015 Syllabus Important Dates Oral 3 Attorney Troy Prince.
Remote Pet Feeder Project Status Update
Oral 2 Format Slide 1 Title Slide –Project Title
Sri Lanka ComSoc Chapter Formation Date: 22 February 2010 ComSoc Chapter Chair: Updated on 23 March 2015.
Project Lost Intelligent Leg Prosthesis
Load Balancing: List Scheduling
Turing Machine
ESMD SG Student Project Manager ESMD SG Faculty Project Manager
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
February 12 – 19, 2018.
Team member1 Team member2 Team member3 Team member4 November 2018
UNMJobs Implementation
P17082 Biomechanical Elbow Model Final Presentation
Team member1 Team member2 Team member3 Team member4 17 September 2009
the Franklin Square Hospital Center
Program Status (Chart 1)
Team member1 Team member2 Team member3 Team member4 October 2016
LEC Incorporated 8 February 2005 Group Members: Jen Bacior Amine Hallab Hiroki Meguro Kevin Mihelc Advisors: Kelly Dympna, MD Jack Patzer, PhD Biopsy.
Knee Loading Device Status Update 2
DTE Fall 2018 – Directors Presentation
CST-Systems Analyst Program
“Your Daily Dose”: Improving the Clinical Care Summary
Property Management Center
Name of presentation 17 January 2018
New Student Orientation
Remote Pet Feeder Project Status Update
Wrap-Up and Q&A: Prepare for a New Semester
Now Accepting Proposals!
Presentation Title Presenter: Name, Institution Project Participants:
Status Report IEEE Student Branch at Texas State University
Alexander Werne, Derek Holyoak, Benjamin Roberts
Budget Update for Administrative Leadership Team February 16, 2018
Albemarle County School Board Thursday, February 25, 2010
Load Balancing: List Scheduling
PCS Technical Board 27th February 2018, Vienna.
Thing / Person:____________________ Dates:_________________
Meeting Agenda Go over A.L. Machining

Parallel Bar Platform Advisor: Dr. Robert Couch Team 3 Members:
How to Advise Using Advisee Academic Planner
Perfect MatchSM Physician Locator
Engineering Design Process
IE04 Weekly Progress Report 2018/10/17 Team: xxxx
Welcome To New Student Advising.
Presentation transcript:

Knee Loading Device Status Update 1 Team Members: Jonathan Coulter Liang Dong Chris Holmes Haroon Osmanzada   Faculty Advisors: Dr. Sebastian Bawab Dr. Stacie Ringleb Naval Medical Center Advisor: Dr. Marlene DeMaio

Roadblocks Confusion with funding requirements Time management Number of distributors allowed Time management

Updates Changed deadline dates for this semester Moved our Patran and CAD drawing to be done February 5th Changed our deadline for ordering the parts to be ordered by the 5th of February The parts are going to be ordered on time Our drawings are behind schedule

Next Step CAD drawings done ASAP and get them over to the machine shop to review with Kevin (Haroon and Jonathan) Work on the Patran drawing (Chris and Liang)