NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 July 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 9 th July 2010 – Offtake Arrangements Workstream.
User Emergency Contact Details Simon Trivella –28 th May 2009 Distribution Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream.
Workgroup meeting October 2014
Transitional Exit Capacity Proposals -Update
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Entry Capacity Overrun price calculation
Review of Demand Estimation Times for Modification Proposal 461
EU Implementation Programme
Transmission Workgroup 7th July 2011
Offtake Workstream : 8th September 2010
Code Governance Review UNC Modification Proposals
Mod 186 Report Assumptions for 2013 DCMF 26 January 2009
Transmission Workstream 4th July 2007
Transmission Workstream, 6 August
OAD Telemetry Requirements for “SOMSA” Exit
Proposer: BP Gas Marketing Ltd Panel Date: 17 April 2014
Proposer: National Grid NTS Panel Date: 17th April 2014
Code Governance Review UNC Modification Proposals
NTS Entry Charging Review Update
2 hour / 5% Rule Bethan Winter.
UNC Mod 273 – Governance of Feasibility Studies
Simon Trivella – 22nd May 2008 Distribution Workstream
UNC Modification Proposal “Allocation of Daily NTS Entry Capacity Within-Day” Richard Fairholme.
Mod 0452 (PARCA) – Further thoughts
7th July 2011 Transmission Workgroup - Elexon
Publication of Zonal Flex Data
Modification 0333A – implementation info
Proposer: Colette Baldwin – E.ON Panel Date: 21st August 2014
MOD National Grid NTS Initiated Flow Swaps
DN OAD Processes: RG 0316 : Offtake Workstream
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Flow Swaps at NTS / LDZ offtakes
DN Interruption & Charging
Review Group 0175: DM Supply Point Emergency Arrangements
Long Term Non Firm Capacity Update
Meeting Friday 13th September 2013 Hayley Burden
Proposed Transitional Gas Exit Arrangements
Revised Tender Timescale for DN Interruption Arrangements
Mod 230: QSEC and AMSEC Timings
UNC Transmission Workstream 15th June 2005
Assured Pressures Proposal
Mark Freeman 29th January 2007
Entry Overrun Calculation
Reinstatement of NTS Interruption
Proposer: Debbie Brace Panel Date: 20th March 2014
Systems Impact from Gas Day Change
Flat, flex, assured pressures Network Development Statement
MP0131: Meter Error Notifications
Information Provision for Transitional Exit Capacity
Workgroup meeting October 2014
Stefan Leedham Transmission Workstream 2nd November 2006
Offtake Workstream : 19 March 2012
Modification 598 update 13 January 2016.
Transmission Workstream, 1 Mar 07
Revised Tender Timescale for DN Interruption Arrangements
OAD Telemetry Requirements for “SOMSA” Exit
Gas Customer Forum 28 July 2008
30th November 2007 Beverley Grubb SGN
Off-peak interruptible service to compliment universal firm/buy-back regime Peter Bolitho.
Capacity Access Review
Presentation transcript:

Review of Physical Regime Times for Modification Proposal 461 Meeting Monday 5th August 2013 Hayley Burden

Assured Pressures & Flex Processes These are examples of physical gas use processes which will stay constant irrespective of the Gas Day changing It is believed consumers use of gas will not alter because the Gas Day has changed NG NTS view would be to retain the existing DN Assured/Agreed Pressure & Flex Capacity arrangements

UNC References – Physical Regime NG NTS have identified 28 references within the TPD and OAD relating to the physical regime NG NTS suggest that most of these times could remain as they are. 1 reference relating to revised OPNs would require moving forward an hour as it is close to the end of the gas day NTS welcome the views of Mod 0461 WG members on this assessment