Output specifications and payment mechanism

Slides:



Advertisements
Similar presentations
PPPs and Affordability
Advertisements

A Joint Code of Practice Objectives and Summary Presentation
Options appraisal, the business case & procurement
MASBO February Information to purchase Services Information to purchase Construction.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Value for Money – new requirements and challenges
DME PANEL CONTRACTS John Fisher Program Manager – Procurement.
Equalities and Procurement Workshop 1 Identifying Need and Creating the Specification Buying Better Outcomes.
Course: e-Governance Project Lifecycle Day 1
1 Welcome to the International Right of Way Association’s Course 701 Property Management Leasing 701-PT – Revision 8 – INT.
Developing & operating a corporate landlord model
Buying Better Outcomes Workshop 4 Equalities and Contract Management If you do not take it seriously, why should the supplier?
Building Schools for the Future LEP and FM Managed Services Hertfordshire County Council 9 January 2008 Alan Wilkinson.
COBIT - II.
INTRODUCTION TO PUBLIC PROCUREMENT
1 RICS The Royal Institution of Chartered Surveyors London Quantity Surveying & Construction Faculty The Built Environment Group Corporate Professional.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
Diploma in Procurement & Supply
Strategic Commissioning
An Introduction to Public Private Partnerships: Why Government needs to work with the private sector Vilnius 22 nd November 2006 Stephen Harris - Head,
James Aiello PricewaterhouseCoopers Africa Utility Week 06 International Good Practice in Procurement.
Payment Mechanisms for PPP Development off PPP and Implementation Possibilities in Latvia Conference, September 2008.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Selecting and Designing Concession / PPP Projects Martin Darcy.
Information System Project Management Lecture three Chapter one
Getting your specifications Right! Florence Gregg figpc ltd E:
Contractor Alternate Design Serving the Public’s Best Interest.
Highway Reactive Maintenance Darren Coffin-Smith May 2014.
"The challenge for Territorial Cohesion 2014 – 2020: delivering results for EU citizens" Veronica Gaffey Acting Director EUROPEAN COMMISSION, DG for Regional.
ICT Legislation  Copyright, Designs and Patents Act (1988);  Computer Misuse Act (1990);  Health and Safety at Work Act (1974);  EU Health and Safety.
Why do we audit? PSCI Audits are designed to assess a supplier's performance against the PSCI Principles as well as against international standards and.
CLC1501 Introduction to the PPP Procurement Approach – Principles of PPP Procurement.
April 2016 RM1045 Network Services: Developing Your Invitation to Tender (ITT) / Request for Proposal (RfP) Document Set.
INTERNAL AUDIT BRIEFING Business Objectives Business Objectives: What are they and how are they used?
Contract management 1. Acquiring software from external supplier This could be: a bespoke system - created specially for the customer off-the-shelf -
SESSION 2 Tuesday 9.30 – Selection of PPP Projects.
The FlexiCare Grant. Content Objectives for Flexicare Background and rationale How Flexicare will work FAQs.
SESSION 4 Tuesday – Value for Money and Affordability.
Services Capabilities “A Different Approach” Neil Taylor.
Asset Planning & Optimization Capital Renewal Strategies
Continuing Competence is coming
Maintenance BC - NZTA assessment in TIO
SIX SIGMA IMPLEMENTATION
Feasibility.
Technical Specifications & Employer's Requirements
Administration of a FIDIC Contract - Project Control
Outsourcing of Census Operations United Nations Statistics Division
Schools Finance Admin Meeting
Project Management Processes
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Tender Evaluation Briefing
Costs and Economics of Construction
UNCITRALThird International Colloquium on Public-Private Partnerships (PPPs) October 2017, Vienna Experts for Chapter IV October 2017.
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
KEYNOTE STAGE SPONSOR.
School Cleaning Update
2016 Procurement Framework Contract Management
Contracts and Procurement
Project Management Processes
ESCL – ANNUAL CONFERENCE 25 OCTOBER 2018 EDWINA UDRESCU, FCIArb Lawyer
Unit 5 – eProject – Starting to look at projects Unit 5
ENGINEERING ECONOMICS
How to conduct Effective Stage-1 Audit
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
AICT5 – eProject Project Planning for ICT
Effective Construction Safety Management
Project intervention logic
BASICS OF PUBLIC PRIVATE PARTNERSHIPS
HMPPS Innovation Grant Programme (2020 – 2022)
Presentation transcript:

Output specifications and payment mechanism SESSION 5 – Wednesday 9.00 – 10.30 Output specifications and payment mechanism

Developing the Output Specification What is an Output Specification? It is what the client needs to achieve from the facilities and services to be provided It helps the bidders to reply properly to the Invitation to Tender It details what needs to be achieved, not how it is to be achieved

Developing the Output Specification The following examples illustrate the differences between the two “Classrooms must have an adequate power supply to meet operational requirements” is an output: “Ensure that bedrooms have at least two pairs of 112V power supply socket outlets available on each wall” is not an output. “Ensure that there are adequate arrangements in place to maintain the safety of the school and its users ” is an output: “The school should have a 24-hour security patrol” is not an output. “Ensure that the school is clean enough when in use to provide a safe, hygienic environment and a positive image” is an output: “Internal cleaning of the school every morning and evening” is not an output.

Developing the Output Specification Why an Output Specification? Needed for a robust contract and the successful delivery of long-term services The emphasis is on service outcomes and outputs explicit allocation of risks and the integration of design and build with the operation of service facilities It focuses on strategic needs rather than the detail of current provision It should allow new ideas about the design, construction and operation of facilities to be proposed It focuses bidders’ attention on project risks This should lead to better designed and operated facilities in the longer term

Developing the Output Specification The range of high-level outputs required in a PPP property project will typically cover some or all of the following The provision of serviced accommodation. Alterations to existing buildings. Provision of grounds, car park or other external facilities. Building, installations and asset maintenance. Grounds maintenance. Cleaning and waste management. Furniture and equipment. Energy management. Caretaking/site supervisory services. Security and safety. Catering. Information technology.

Developing the Output Specification A sufficient range and level of services has to be included in order to: optimise the whole-life VFM benefits of integrating design with operational solutions sustain the level of competition for as long as possible

Developing the Output Specification A good Output Specification must: Reflect the actual requirements of users Be clear, concise and unambiguous Give the potential bidders sufficient information to decide and cost the facilities and services Comply with legal or other statutory requirements and policies, and compatibility requirements

Developing the Output Specification A good Output Specification must also: Specify any constraints which are essential to defining a deliverable project Allow projects to be evaluated in the procurement process against defined criteria Identify those service areas which are critical to the availability and performance of the facility Only contain requirements that can be afforded by the client and are deliverable

Developing the Output Specification The Output Specification, by defining outputs, defines many of the risks that the bidders are being asked to take on. It is for the bidders to assemble the optimum means of delivering the results required, and they do this at their own risk of failure. If the facilities or services fail in some way, the client cannot be blamed

Developing the Output Specification The Output Specification clearly defines the quality standards of facility provision and services to be achieved. Otherwise the Output Specification will be open to misinterpretation Also it will be harder to build up the public sector comparator (PSC) properly The PSC must be constructed on the same basis as the Output Specification.

Developing the Output Specification The following questions provide a useful framework for determining and defining outputs: What are the objectives of the facility and services to be provided? How can these objectives contribute to the successful delivery of the public service? In the light of these objectives, what is definitely not wanted What is negotiable? What is the level and standard of facilities and service that must be delivered? What is desirable over that level and standard, if affordable?

Developing the Output Specification Further questions are: What service parameters cannot be changed? How do services and outputs rank in terms of importance? What is likely to change over the life of the contract? How can such changes be allowed for in the specification, where necessary? Is it possible to translate the specified standards into performance measures within the payment mechanism?

Performance measurement SESSION 7 Performance measurement

Performance measurement system Concentrate on important measures Private sector partner to undertake monitoring Partner to provide a point of contact (helpdesk) Public sector Client and nominated users able to report faults Partner has permitted rectification period Failure may lead to reduction in payment

Performance measurement system Concentrate on important measures If too complicated, the mechanism becomes unwieldy and expensive The idea is to use the system to incentivise the partner, not penalise him

Performance measurement system Partner to undertake monitoring Partner should provide monitoring equipment Client can audit system If not working properly, payment deductions can be made

Performance measurement system Partner to provide helpdesk May be on or off-site Should be manned as often as necessary to be able to correct faults

Performance measurement system Client and nominated users able to report faults Important to control fault reporting to nominated users As soon as report is made, the rectification period starts

Performance measurement system Partner has permitted rectification period Important to allow partner to put right faults before deducting money Different periods for different categories of fault Temporary rectification might be possible Repeated faults rectified in time might however lead to payment deduction

Performance measurement system Failure to rectify in time may lead to reduction in payment Deduction points are given for failure to rectify in time Repeated failure results in escalating numbers of points Points can be awarded for non-availability and poor performance, but not for the same incident

SESSION 8 The Payment Mechanism

Payment Mechanism Net Basic Monthly Payment Equals Gross Basic Monthly Payments Minus Total Unavailability Monthly Deduction Minus Service Performance Monthly Deduction Plus Other adjustments Plus Indexation

Payment Mechanism Unavailability Deduction Notice of Unavailability Helpdesk or Partner’s on site representative Details of Unavailability Timing eg:- 5 minutes Logged Failure Time/Logged Rectification time Response to Notice

Payment Mechanism Commencement/Duration of Unavailability Health and Safety Rectification Temporary Rectification Permanent Rectification Inspection of Areas

Payment Mechanism Totally Unavailability Deductions Unavailability But Used Deductions eg:- Area Failure Deductions x Deduction Period x [%]

Payment Mechanism No Unavailability Deductions if:- Client Default Client Change Emergency Planned Maintenance Acts etc where the Partner has tried to minimise impact Client interference through instructions, requests etc Client Step In

Payment Mechanism Alternative Accommodation Partner’s Relocation Plan and Relocation Date Agreement of Alternative Accommodation Is there a safe and viable means of access? Sole discretion of Client Inside/Outside Project Boundary Alternative Accommodation takes over under the Payment Mechanism/Performance regime

Payment Mechanism Performance Deductions Notice of Performance Shortfall Helpdesk or on site representative Details of Service performance, shortfall and reasons Timing eg:- 5 minutes Logged Failure Time/Logged Rectification Time Response to Notice Limitations on Service Performance Deductions

Payment Mechanism Various Schedules Basic Payment Schedules Availability Criteria/Criticality Interim areas Full areas

Payment Mechanism Rectification Periods Services Priority Spreadsheets Service Rectification Periods Core Session tables Utilities Consequential Unavailability Customer Satisfaction Surveys