The idea evolved from two different contractor customers who shared with us a better way to perform hydrostatic testing of DWV piping system. Two different,

Slides:



Advertisements
Similar presentations
Plumbing.
Advertisements

Typical Plumbing System
SKA-Pak Plus Mobile Air Cart Con-Space Link
Plumbing 101 for Property Managers Presented by: [Put your name here] Welcome to... [Delete these logos and put your logos here]
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Operation of the FW-720 Unit 1. Side 1 2 Inlet Hand Crank.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
 Established in 1995  Located in Wilmington, NC with a 40,000 Sqft facility.  Specializes in the design and manufacturing of connection solutions. 
2 Fire Fighter Qualifications and Safety Skill Drills.
Connecting to industry. Fittings for Steam Hose Remember Steam is……… minimum 212 F.
Job Performance Requirement 7-13 Servicing an SCBA Cylinder Using a Cascade System.
SPILL – RESISTANT VACUUM BREAKER ASSEMBLY SVBA TESTIN G.
The Valve The Valves Use ¾” thermostatically controlled valves It’s not necessary to have ¾” supply connected to ¾” valve.
Augmenting Fire Standpipe Systems
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
Reservoirs Covered in Ch. 5 of Vickers Text
Introducing the Mobile Sink with Cabinet Base and Self Contained Water Supply BH, Inc.
Screened Warning Pipe A screened water pipe is a requirement under the water regulations. The pipe should be one size larger that the supply pipe.
 Determine the waterline components needed to complete the water supply for the bathroom shown in figures 13-6 and 13-7.
Pizza Oven Status 6/4/2013 Jeff Williams. 2 UHP N2 – green handle is shutoff valve, downstream of this is a micrometer valve for flow control. Max flow.
Boiler Mountings.
"AIR COOLER" Heat Exchanger
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
AUTOMATIC SPRINKLERS.
Supplied-air regulator Copyright © 2013 by The S.E.A. Group.
FILTERING MDP. Safety and Safety Gear  When filtering from a fermentation vessel you should never use carbon dioxide to push the beer through the filter,
Pipe Fittings. Purpose of Pipe Fittings  Plumbing fittings have different shapes which allow rigid straight pipe to change both direction and diameter.
CARBURETED FUEL SYSTEM
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
STEAM HEATING.
Hydronic Mechanical Controls
Mechanical for Oil Heat
Screened Warning Pipe A screened water pipe is a requirement under the water regulations. The pipe should be one size larger that the supply pipe.
Water Supply.
Floating Head Heat Exchanger
NFPA 31 Standard for the installation of Oil- Burning Equipment
“Fix Tube Sheet” Heat Exchanger
1 Skill Drill 2-7 Donning a Face Piece Step 1: Fully extend the straps on the face piece. Step 2: Place your chin in the chin pocket. 2 Step 3: Fit the.
15 Water Supply. 2 Objectives Describe the sources of water for a municipal water supply system. Explain the purpose of a water treatment facility. Describe.
TRENTON Casing Filler Presentation
BSP & Hose fittings 67.
HPU FILTERS LOW PRESSURE FILTER FROM APU UNIT. CLOSE APU HYDRAULIC FLUID VALVE. FILL FILTER WITH HYDRAULIC FLUID PRIO TO INSTALLATION. LUBRICATE GASKET.
 Determine the waterline components needed to complete the water supply for the bathroom shown in figures 13-6 and 13-7.
15 Water Supply. 15 Objectives (1 of 2) Discuss rural water supplies. Describe how portable tanks are used to supply water for firefighting. Describe.
House Drainage System By- Prajyoti P. Upganlawar
Tips on how to winterize your lawn sprinkler system Benefits of using Lawn Sprinkler Systems.
Pipe Fittings Purpose of Pipe Fittings  Plumbing fittings have different shapes which allow rigid straight pipe to change both direction and diameter.
Vertical Pump Motor Manifold Upgrade. VPMM Replaces Existing Pumps, Motors, Relief Valves, Check Valves, Discharge Filters, Pump Running Pressure Gauges,
Water Systems Ag Mechanics Pipe Types Galvanized Steel Cast Iron Black Steel Copper.
Pipe specials.
Grotherm Thermostatic Rough-in Valve
High Density Polyethylene Pipe and Fittings
Mahatma Gandhi Institute Of Technical Education & Research centre ,Navsari. A presentation on House Drainage Subject :- Environmental engineering.
FIXTURES.
14 Refrigerant Recovery, Recycling, and Recharging.
Pipe Fittings.
Staying in Compliance: Spill and Overfill
Plumbing.
Dial (844) | How to Fix HP Printer Error 0x61011be5 ?
AUTOMATIC SPRINKLERS.
Typical Plumbing System
Overfill Prevention Technology and Maintenance
Floating Head Heat Exchanger
TRENTON Casing Filler Presentation
GENERALPIPINGREQUIREMENTS:. Designing and erecting an efficient piping system requires certain aspects/ requirements which could be found in our PME handbook…
NEW COMPLIANCE REGULATIONS
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
Presentation transcript:

The idea evolved from two different contractor customers who shared with us a better way to perform hydrostatic testing of DWV piping system. Two different, yet related approaches of hydrostatic testing: One involved a modification to a standard cleanout tee The other involved a reusable test manifold/sanitary tee 1 Contractor Safety The Mold Liability - due to water spilling inside the chase Reliability of testing

The most common way of performing hydrostatic testing involves the use of inflatable plugs. Remove cleanout plug from stack cleanout tee. Insert inflatable plug and inflate to seal off the stack just above the cleanout opening. All floor drain lines are sealed in a similar manner. All lavatory, urinal and water closet lines are sealed. The system is filled with water until water reaches the highest elevation. System must hold pressure for 15 minutes to pass. Test is usually performed in the presence of an inspector who verifies the system. 2

However, as simple as this test method appears there are some common problems associated with it. Inflatable plugs are unreliable - Leaks require system re-test Removal of inflatable plugs - Spilling of water inside the chase - Soaking the person removing the inflatable plug Spilling of water inside the chase - Increases the risk of mold - Serious liability issue for the contractor 3

Designed to be used in the sanitary DWV piping stack as a cleanout tee with the additional function of a test tee for hydrostatically testing the piping system within high-rise buildings. Replaces need for an unreliable inflatable plug within the main stack to test the piping system. Internal threading – allows the stack to be closed off by installing a raised hex head plug (by others). Test port – allows the filling and draining of the piping system. 4 Test Port with Raised Head Plug (Regularly Furnished) Countersunk Taper Thread Bronze Plug (Regularly Furnished) Fig. No. 4505Y, No- Hub Model Cleanout and Test Tee

5 Duco cast iron cleanout tee with internal threading, ½ NPT test port with raised head plug and countersunk taper thread bronze plug. Hub & Spigot and No-Hub outlets. Internal Threading for Test Plug use. ½ NPT Test Port with Raised Head Plug. Spherical opening for better hand access. Available in 3, 4 and 6 pipe sizes.

6 Note: The Boss Tee can be used to test the piping system in the customary manner by installing a plug into the internal threading and filling the piping from the top. Remove cleanout plug at face of tee. Thread a raised hex head plug (by others) into the internal threading. Remove plug from test port. Thread ½ NPT nipple with boiler drain valve into the port. Pressure gauge may be installed before the boiler drain valve. Connect water hose to the boiler drain valve and water supply to fill piping. Boiler drain valve must be in the open position. When piping is full of water - shut off the water supply and close the boiler drain valve. When testing is complete - disconnect the water hose from the water supply and place in stack, floor drain or other acceptable drainage point and open boiler drain valve to drain piping. When piping is completely drained - reverse steps to install the cleanout plug.

SAFETY – contractor not required to remove inflatable plug from inside of stack with psi pressure just upstream of the plug. REDUCES THE CHANCE OF MOLD – due to water spilling inside the chase. CONTROLLED TESTING ENVIRONMENT – provides contractor with effective means of controlling the filling and draining of piping system. RELIABILITY – better testing results because of reliable closure of the stack. TIME & MATERIAL SAVINGS – eliminates the inflatable plug in the vertical stack and the time to get it to seal properly. EFFICIENT – test up to 3 floors at a time. The inspector can use the gauge to verify pressure in the line. LARGER, SPHERICAL OPENING in the fitting allows for easy hand access for line testing/inspection/cleaning. CLEANOUT TEE REMAINS IN THE STACK after testing to be used for future maintenance and testing. 7