UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.

Slides:



Advertisements
Similar presentations
Code Governance Review: WWU views on potential changes to UNC and the Modification Panel Simon Trivella – 30 th March 2010 Governance Workstream.
Advertisements

Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
Implementation of Non Effective Days Nexus Workgroup – March
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
Gas Performance Assurance Framework 11 th January 2013 Confidential.
CSEPs Reconciliation “Read Window” proposal. 2 Background  I&C CSEPs (supply point AQ >73,200) are subject to reconciliation  IGTs are obliged to provide.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
PN UNC Workgroup iGT Services 7 th February 2012.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
Version PNUNC AQ Principles Workgroup Mod 0209 – Rolling AQ Presenter: Steve Nunnington 23 rd March 2010.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
Industry Dialogue on xoserve Services 14 th September 2007.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Gas Performance Assurance Framework 11 th January 2013.
23 February 2011 IGTRP0030 Potential impacts on Parties of changes to NExA Table.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream.
IGT and Shipper Workgroup meeting 28 th February 2011.
Customer Charge On behalf of all DNs 19 November 2010.
1 iGT Agency Services migration considerations As part of UK Link replacement programme (incorporating industry requirements) the new systems will need.
Background Current balance of LDZ System and Customer charges
UNC Modification Proposal 0202 National Grid Distribution
Modifications iGT 039 and GT 0440 re iGT Agency Services background
CSEP NExA Update Marie Clark ScottishPower 28th September 2006.
Rebecca Knight Mod 644 UIG Analysis.
Background - Tolerance Rules
Nexus Meter Read Performance April 2018
Agenda Action Review Update on IX and iGT access Testing strategy
Amendment to NEA & NExA Measurement Provisions Change Process
Modification th July 2008.
Project Nexus Workgroup
Project Nexus Workgroup
CSEPs Reconciliation Proposals
CSS Update for CoMC 19th September 2018
The Necessary Criteria for a UNC Modification Proposal
Proposer: Marie Clark, ScottishPower Panel Date: 16th January 2014
DSC Change Committee Summary – 10th October
Joint Office Presentation for Modification 0678
CSS Consequential Change CoS Shell Record Submission for Discussion at 630R 27th April 2018.
Project Nexus Workgroup
Mod Proposal 0268 : AQ Backstop Date
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
AUG Query Responses 21st November 2013.
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
Connected System Exit Points - Update
Modification proposal 330
UK Link Replacement Programme additional supporting UNC modifications
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Deferral of Retrospective Updates Functionality
Joint Theft Reporting Review (from meeting 1st March 2019)
DN Interruption Phase II
AQ Review System Calculation Overview
Development Work Group 0209 Straw Man Update
Meter Read Rejections ..
Meter Reads.
Mod 209 – Rolling AQ.
Project Nexus Workgroup
Further Considerations
Enabling Large Scale Utilisation of Class 3
Presentation transcript:

UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011

Background Development Group IGT030 Ran from 27/10/10 till 06/04/11 Remit The Review Group was required to: • Undertake a review of the current AQ Table to establish if the values remain representative of average consumption of the majority of consumers in relation to the geographical area and house types specified. • Consider additional impacts to AQ values resulting from energy efficiency measures taken by Builders and consumers, including improvements in home insulation/building standards, the installation and use of high efficiency condensing boilers, and general demand reduction. (The review will also consider any impacts of the installation by Builders and developers of micro-generation). Consider the impacts, if any, on Relative Price Control Consider the frequency of the review of AQ figures.

Methodology proposals ScottishPower Methodology Sample All New Connection Change of Responsibilities occurring between Feb 2009 and Aug 2009. At least 1 year’s consumption data for the above New connections. Only actual meter readings have been used within the data analysis (all at least 6 months and a day apart). Included in the sample Live sites. Lost sites. Confirmation pending. The meter fit data is a floating date, as the trigger point is the point the customer moved in Raw data required Difference (in days) between the recorded COR Date and next valid read date (no less than 6 months and 1 day apart) Difference between the recorded COR Read and next valid read WAALP Data for the date of the COR, and for the valid read date. WAALP Data for the periods 30/09/09 and 01/10/09. Formulae We require the CWWALP figure to calculate the AQ Value. Example on next slide. AQ Value (((Units Used * Reading Units * Correction Factor * Calorific Value) / 3.6)*365)/CWAALP. Working exampled are provided.

Methodology adopted in the modifications IGT040/ UNC 0392 IGT Methodology Sample AQ review output files Included in the sample Only properties deemed to be new housing when first connected to a gas connection. The AQ changed outside the +100% / -50% tolerance, but the new AQ issued as the shipper successfully challenged the old AQ being used. All other AQ values calculated as part of the most recently completed AQ Review using meter reads (for clarity it also includes those above the 2,500 therm threshold). Only house types that are listed in Table 1 in Appendix CI-1 of the Code. IGTs will collectively collate the results of each IGT AQ review using template C2 by November 30th. The results of the AQ collation exercise may be discussed in the January following the AQ review. Shippers may also wish to collate their own data for such discussions. Not included in sample Infill domestic property AQs. Non-domestic property AQs. Where an installation read was used in the AQ calculation. There was no AQ change because the site became live less than 26 weeks prior to the cut off read date. There were no reads with which to calculate the AQ. The AQ changed outside the +100% / -50% tolerance and the Calculated AQ is used as it was not challenged, or challenged unsuccessfully. AQs changed using the Large Transporter’s agent adjustment factors based on the change from the old to new weather correction data. Formulae All IGTs (with the exception of Fulcrum, due to time constraints) collated the data on a template and provided to the AIGT to collate for discussion at the review group.

Methodology adopted in the modifications IGT040/ UNC 0392 At the final meeting, it was noted that following the work group contacting the Gas Forum, only 2 Shippers had actually been able to provide AQ data in the required timeframe and that all other Shipper parties were either not able to supply the data at all or within the group’s work plan timescales. As the IGTs had already collated their AQ data it was agreed that the work group would proceed on the original timescales and provide a final report to the Panel based on this data alone. It was agreed that parties could proceed and raise a modification to propose an update to the AQ values if they wished

Ongoing solution As a result of the workgroup a new report will be added to Section 9 of the AQ Procedures Document detailing the following : On an annual basis, following AQ Review IGTs will individually collate AQ data using an agreed template, and utilising the agreed methodology. In compiling the results they will use one tab per licence held, inputting the average AQ per property type for each of the three geographic areas. Next to this value, input the number of individual supply points used to derive that average. IGTs will be reporting from the AQ review output files, not from the overall portfolio. If an AQ has not been reviewed, it should not be part of the dataset. The AQ used should only be the final AQ that was taken as the revised AQ value. Where an iGT has no values for a type of property the cell AQ and NUMBER must be left BLANK. It was also agreed that in the lead up to the review meeting, shippers may also wish to collate their own view and provide to Gemserve to collate, and provide as discussion material at the review meeting. It was also agreed that there would be no parameters updated in the document to mandate a modification raising criteria, that as a group, or on an individual level modifications can be raised when a party feels that it is commercially warranted to update the values.

UNC 392 UNC Mod 392 was raised to facilitate the update of the AQ values proposed as a result of the work carried out in Review Group IGT030 and in the corresponding IGT 040 Modification. In terms of the implementation of both modifications, the dates were aligned to minimise the risk of a misalignment of implementation dates. It is felt that this modification is a self governance modification due to the fact that there are no significant negative financial implications for the large transporter, the shipper, supplier or customers. There is however a cost Implications for the IGTs in terms of the RPC, which was discussed in the Review Group.