WLTP-DTP Subgroup Additional Pollutants Progress report

Slides:



Advertisements
Similar presentations
WLTP-DTP-AP, Mörsch/Astorga WLTP-DTP Subgroup Additional Pollutants DTP14 - Status Report and Open Issues, Geneva June 2013 WLTP-DTP-AP Status Report and.
Advertisements

WLTP-DTP-AP, Mörsch/Astorga WLTP-DTP Subgroup Additional Pollutants DTP13 - Status Report and Open Issues WLTP-DTP-AP Status Report and Open issues TOKYO,
Task Force 3: Electrolyte leakage Last update- 12/05/
Status of the draft GTR 65th GRPE, January 2013
WLTP-DTP-AP, Mörsch/Astorga WLTP-DTP Subgroup Additional Pollutants DTP12 - Status Report and Open Issues WLTP-DTP-AP Status Report and Open issues.
WLTP-DTP DTP Meeting 1 Wrap-up Reviewed general considerations, methodology and timing Reviewed proposals Created initial working subgroups Preparations.
Regulation No. 96 Proposal for 03 Series of Amendments GRPE, January 2011 Informal document No. GRPE (61st GRPE, January 2011, agenda item.
Determination of System Equivalency – TaskForce Audi, EA-52, V4.0 WLTP-10-33e.
WLTP-08-19e BMW, Christoph Lueginger WLTP Road Load Family
WLTP Road Load Family concept
Determination of System Equivalency – Starting note for WLTP IWG Meeting #8 in Pune, India Audi, EA-52, V2.0 WLTP-08-09e.
WLTP-DTP-AP Validation of N 2 O measurement WLTP-DTP-AP Subgroup Additional Pollutants Validation of N 2 O measurement.
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 7 th DTP Meeting Bern 12 th – 14 th September 2011 Chris Parkin.
Old Annex 2 Reference Fuels moved to new Annex 3 Old Annex 3 Determination of System Equivalence moved to new Annex 9 New is Annex 2 Gear Selection, Shift.
WLTP-DTP Subgroup Additional Pollutants Progress Report June 2012 WLTP-DTP-AP, Mörsch/Astorga WLTP-DTP Subgroup Additional Pollutants Progress report Date:
WLTP Test Procedures for Chassis Dynamometer Testing Chris Laroo - U.S. EPA April 14, 2010 WLTP-DTP
WLTP-DTP Subgroup Additional Pollutants September 2011 WLTP-DTP Additional Pollutants Subgroup Validation phase 2? 2011 Bern, EU-WLTP 7 th DTP Meeting-13.
WLTP: Transposition into EU legislation Summary of AdminWG 2 nd December 2014 For AdminWG Meeting 16 th December 2014, Brussels.
Assessment Criteria for the Acceptability of Cycle and Testing Procedure Informal working document DTP Subgroup LabProcICE slide 1 Assessment Criteria.
Transposition of EURO VI requirements into UN/ECE R49 Status report GRPE 9-June 2011 Submitted by the expert of European Commission 1 Informal document.
WLTP GTR 15 WLTP-11-09e Monday, April 06, Report by Drafting Coordinator, Serge Dubuc.
WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) 62nd GRPE agenda item 3 (a) WLTP WLTP secretary – Noriyuki Ichikawa.
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office for the Environment FOEN DTP12 Report to GRPE 17th January.
Summary of 3 rd Informal Group on WLTP 11 June 2009 Palais des Nations, Geneva Informal document No. GRPE (58th GRPE, 9-12 June 2009, agenda item.
WLTP-DTP Results from DTP Session 1. WLTP-DTP First Test Procedure Meeting Overview  Hosted by USEPA in Ann Arbor on the 13 th, 14th, and.
VIAQ (Vehicle Interior Air Quality) Informal Working Group
DTP Conventional Engines HEV/PHEV/EV Reference Fuels PM/PN
Electric Vehicles and the Environment (EVE IWG)
Particle Measurement Programme - Report
Off-cycle Emissions GTR – Status Report for GRPE
76th UNECE GRPE session PMP IWG Progress Report
a view from the Automotive Industry
WLTP-DTP Subgroup Additional Pollutants Progress report
Air Pollution Control and NIR Division
WLTP DTP PM-PN Subgroup Activity Report
Status of the draft GTR 65th GRPE, January 2013.
WLTP-DTP Subgroup Additional Pollutants Progress report
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-012
Drafting Subgroup Meeting Part of IWG #16, The Hague, October 2016
Outcome of TFCS-12 - summary slides - (detailed meeting minutes will be provided separately) April The Shilla Seoul, ROK.
GTR VERSION: Benchmark ECE-TRANS-WP and Corr AP TF 20 May
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans
Report of 6th DTP Meeting to GRPE 9th June 2011 UNECE, Geneva (CH)
Task Force 3: Electrolyte leakage
LDV Real Driving Emissions: - Drafting of physical PEMS protocol –
Positions on open points WLTP DTP subgroup LabProcICE
Report of 6th DTP Meeting to GRPE 9th June 2011 UNECE, Geneva (CH)
WLTP-DTP Subgroup Additional Pollutants Progress report
WLTP-DTP Subgroup Additional Pollutants Progress report
Lab Process Internal Combustion Engines
WLTP-DTP Subgroup Additional Pollutants VP2 Results
WLTP-DTP Subgroup Additional Pollutants VP2 Results & Open Issues
Proposal EV/PHEV/HEV/FCV Lab Process Sub-Group
LIGHT DUTY ELECTRIC AND HYBRID VEHICLES
Informal document GRPE-78-23
WLTP Phase 2 Presentation and discussion of the Term of Reference for the Durability Task Force Paris, April th WLTP IWG meeting DG GROW.C4.
Background During last GRPE meeting, EU, Japan and Korea requested the creation of an RDE IWG The GRPE accepted the proposal during its June 2018 meeting.
Work plan and next steps – RDE-LDV working group
WLTP-DTP Open issues.
Additional Pollutants Subgroup 7th DTP Meeting-13 September
WLTP GTR 15 WLTP-09-18e Report by Drafting Coordinator, Serge Dubuc
WLTP-DTP Subgroup Additional Pollutants Progress report
Working Paper No. WLTP-05-11e
WLTP-DTP Subgroup Additional Pollutants Progress report
A.1 to 3: Statement of technical rational and justification
DTP Lab Process ICE: Open Issues
WLTP-DTC Air Pollution Control and NIR Division
WLTP-DTP Subgroup Additional Pollutants Progress report
WLTP DTP – Lab Process ICE
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 8/13/2019.
Presentation transcript:

WLTP-DTP Subgroup Additional Pollutants Progress report Date: 13. April 2011 WLTP-DTP-AP, Oliver Mörsch

Additional pollutants subgroup - Members list Chair: Co-chair: Mörsch Oliver Daimler Astorga-Iloren Covadanga JRC Akard Mike Horiba Andersson Jon Riccardo AOYAMA Yuichi JASIC-contact Berg Olle Volvo Cars Bigi Laura PSA Born Michael BMW NA Bosteels Dirk AECC Charafeddine Kamal Porsche Dijkhuizen Arjan TME Engelejehringer Kurt AVL List GmbH Hill Less HORIBA Holmstrom Maria Saab Jemma Carl Kirchner Ulf Ford Europe Laroo Chris USEPA Loo Jeff GM May John Momique Jean-Claude Moriya Hidenori JAMA/Toyota Nagy Don GM Nyman Bjorn Saab Petit Alain Renault Park Junhong Korean Ministry of Environment Ramacher Bjoern Volkswagen Group Renders Johan EC Sanchez James EPA Sawada Yutaka JAMA Schuster Norbert Ford Europe Sherman Mike Ford Silvis Willian AVL Simon Nakia Chrysler Steininger Nikolaus Strobel Karsten GM Europe Thiel Wolfgang BMW AG Vavra Christian MAHA-AIP Walker Patrick Meseth Susanne UBA Yassine Mahmoud WLTP-DTP-AP, Oliver Mörsch

Additional pollutants subgroup – Terms of reference The Additional Pollutants subgroup shall be responsible for the development of test procedures for pollutants not currently regulated such as NO2, NH3, N2O including measurement equipment and formulae for the measurement for light duty vehicles. Scope of Activity The subgroup will undertake the following tasks on the basis of procedures in existing legislation and expert knowledge within the group: Agree on additional pollutants to be addressed. Identify appropriate measurement methods for each of the pollutants. Describe measurement and calibration procedures and calculations based on existing legislation and on output from lab procedure subgroup. Drafting of legislation text. in progress in progress WLTP-DTP-AP, Oliver Mörsch

Meeting schedule First Meeting: Telephone/Web Conference Date: 20th July 2010 16 participants 2nd Meeting: Telephone/Web Conference 20 participants 3rd Meeting: Face to face meeting at JRC/Ispra Date: 9/10 Dec. 2010 14 participants 4th Meeting: Face to face meeting at BMW/Munich Date: 7/8 March 2011 18 participants 5th Meeting: Face to face meeting at JRC/Ispra (registration in progress) 10/11 Mai 2011 WLTP-DTP-AP, Oliver Mörsch

Pollutants to be addressed NO2 NH3 N2O Ethanol Aldehydes (Formaldehyde, Acetaldehyde) WLTP-DTP-AP, Oliver Mörsch

Table of candidate methods for additional pollutants WLTP-DTP-AP, Oliver Mörsch

How can alternative methods be qualified/admitted? Open Issues (I) General: How can alternative methods be qualified/admitted? How will the testing of additional pollutants in WLTP phase 2 be performed? • Traceability to national standards of cal gas for AP Define calibration, verification, linearization WLTP-DTP-AP, Oliver Mörsch

• Allow calculation of NOx from NO + NO2 Open Issues (II) NO2: • Allow calculation of NOx from NO + NO2 • Allow QCL and other technologies for NO and NO2 NH3: Temperature for NH3 sampling: 110 – 190 °C? Handling of lost sample in raw exhaust sample Limit sample flow (10 l/min) Return sample (no drying, heated return) Additional cycle?? NH3 sampling during engine off Calibration/Verification of in situ instruments WLTP-DTP-AP, Oliver Mörsch

Definition of Peak resolution for GC methods Definition of Columns Open Issues (III) GC-Methods (N2O, ETOH) Definition of Peak resolution for GC methods Definition of Columns use of thermal pre-concentrator Linearization/verification ETOH Ethanol response factor of the FID Aldehydes allow factors WLTP-DTP-AP, Oliver Mörsch

Contiue drafting of GTR for reference methods Resolve open issues Next Steps Contiue drafting of GTR for reference methods Resolve open issues Tasks have been assigned within group WLTP-DTP-AP, Oliver Mörsch