Modification 0333A – implementation info

Slides:



Advertisements
Similar presentations
Force Majeure & payment of Exit Charges Jeff Chandler - 6 th October 2011 Transmission Workgroup - Elexon 1.
Advertisements

Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DRSEC Update Transmission Workstream 06 November 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transmission Workstream 6 January 2011
Distribution workstream 29th January 2009
Transmission Workstream February 2009
Transmission Workgroup 7th July 2011
Grid Code Development Forum – 6 September 2017
UNC Modifications 061 & 062 – An Overview
Code Governance Review UNC Modification Proposals
Mod 186 Report Assumptions for 2013 DCMF 26 January 2009
Introduction of Code Contingency Guidelines Document
Mod 0621 Amendments to Gas Transmission Charging Regime
UNC Modification Proposal 0373
Transmission Workgroup – 1st December 2011
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Electricity Governance Comparison
NTS Entry Charging Review Update
UNC Modification Proposal “Allocation of Daily NTS Entry Capacity Within-Day” Richard Fairholme.
COR1072 Enduring Transfer and Trade Arrangements
UNC 0621L: Amendments to Gas Transmission Charging Regime
7th July 2011 Transmission Workgroup - Elexon
The Necessary Criteria for a UNC Modification Proposal
Transmission Workgroup June 7th 2012
Impacts of Project Nexus Implementation Date to AQ17
Questions for Consultation
Proposer: Marie Clark, ScottishPower Panel Date: 16th January 2014
Draft Capacity & Connection Plan
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Rebecca Hailes For 15 March 2018
Joint Office Presentation for Modification 0678
Transmission Workgroup 6th March 2014
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Transmission Planning Code Review
Mod 0621 Amendments to Gas Transmission Charging Regime
Jeff Chandler - 3rd October 2013 UNC Tx Workgroup
Flow Swaps at NTS / LDZ offtakes
UNC0376S – Increased Choice when applying for NTS Exit Capacity
DN Interruption & Charging
Introduction of Code Contingency Guidelines Document
Interruptible to Firm – NTS Supply Point Transition
Mod Proposal 0268 : AQ Backstop Date
Draft Mod: Update of default System Marginal Prices
Genuine Reconciliation
Proposed Transitional Gas Exit Arrangements
UNC 0621L: Amendments to Gas Transmission Charging Regime
EU Balancing Code – Mod 494 Imbalance Charge Amendments
Mark Freeman 29th January 2007
Reinstatement of NTS Interruption
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Project Nexus Workgroup
Transmission Workstream DN Interruption Update - Introduction
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
Modification 598 update 13 January 2016.
Title slide [from Title Slide master]
Implementation Approach Distribution Workgroup – June 2014
Transmission Workstream, 1 Mar 07
UNC MOD 213: USER PAYS GOVERNANCE ARRANGEMENTS
Proposer: Tracey Saunders, Northern Gas Networks
Presentation transcript:

Modification 0333A – implementation info Transmission Workgroup 4 August 2011

Mod 0333A Implementation 18 week implementation project started May 2011 In line with expectations set within Mod 0333A, the implementation will be effective from 1 October 2011 Start of gas year busy time for system change (AQ review, DN Interruption) so two stage implementation; Initial implementation to be effective from 1 Oct 2011 Final implementation i.e. Gemini screens etc 16 Oct 2011 Formal Implementation Notice to be issued to Joint Office asap

Mod 0333A – error in calculation Typo in calculation within legal text; Current calculation is However, this should read

Mod 0333A – error in calculation No impact for gas year 2011/12 fixed defaults will be SAP+/- 0.0263p/kWh from 1 Oct 11 Error will result in higher fixed diff prices for 2012/13 if unchanged Proposal is to raise a consent to modify to amend the text once implemented into UNC