ARIES-CS Maintenance Scheme and Blanket Design for Modular Approach

Slides:



Advertisements
Similar presentations
First Wall Heat Loads Mike Ulrickson November 15, 2014.
Advertisements

April 23-24, 2009/ARR 1 Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL A. René Raffray, Siegfried Malang, Xueren Wang University of California,
September 24-25, 2003 HAPL meeting, UW, Madison 1 Armor Configuration & Thermal Analysis 1.Parametric analysis in support of system studies 2.Preliminary.
October 16-19, 2000 A. R. Raffray, et al., ARIES-AT Blanket and Divertor, ANS Top. Meet. On TOFE ARIES-AT Blanket and Divertor A. R. Raffray 1,
March 21-22, 2006 HAPL meeting, ORNL 1 Status of Chamber and Blanket Effort A. René Raffray UCSD With contributions from: M. Sawan B. Robson G. Sviatoslavsky.
September 15-16, 2005/ARR 1 Status of ARIES-CS Power Core and Divertor Design and Structural Analysis A. René Raffray University of California, San Diego.
January 8-10, 2003/ARR 1 Plan for Engineering Study of ARIES-CS Presented by A. R. Raffray University of California, San Diego ARIES Meeting UCSD San.
First Wall Thermal Hydraulics Analysis El-Sayed Mogahed Fusion Technology Institute The University of Wisconsin With input from S. Malang, M. Sawan, I.
June 14-15, 2005/ARR 1 Status of ARIES-CS Power Core Engineering A. René Raffray University of California, San Diego ARIES Meeting UW June 14-15, 2005.
September 3-4, 2003/ARR 1 Initial Assessment of Maintenance Scheme for 2- Field Period Configuration A. R. Raffray X. Wang University of California, San.
September 11, 2000 A. R. Raffray, et al., High Performance Blanket for ARIES-AT Power Plant, SOFT 2000 High Performance Blanket for Aries-AT Power Plant.
June 14-15, 2006/ARR 1 ARIES-CS Power Core Engineering: Updating Power Flow, Blanket and Divertor Parameters for New Reference Case (R = 7.75 m, P fusion.
Status of the Modular and Field- Period Replacement Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and L. El-Guebaly ARIES Meeting.
June 14-15, 2007/ARR 1 Trade-Off Studies and Engineering Input to System Code Presented by A. René Raffray University of California, San Diego With contribution.
March 16-17, 2000ARIES-AT Blanket Design and Power Conversion, US/Japan Workshop/ARR ARIES-AT Blanket Design and Power Conversion The ARIES Team Presented.
January 11-13, 2005/ARR 1 Ceramic Breeder Blanket Coupled with Brayton Cycle Presented by: A. R. Raffray (University of California, San Diego) With contributions.
August 17, 2000 ARIES: Fusion Power Core and Power Cycle Engineering/ARR 1 ARIES: Fusion Power Core and Power Cycle Engineering The ARIES Team Presented.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
June 16, 2004/ARR 1 Thermal-Hydraulic Study of ARIES-CS Ceramic Breeder Blanket Coupled with a Brayton Cycle Presented by A. R. Raffray With contributions.
Status of the Power Core Configuration Based on Modular Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
November 4-5, 2004/ARR 1 ARIES-CS Power Core Options for Phase II and Focus of Engineering Effort A. René Raffray University of California, San Diego ARIES.
April 27-28, 2006/ARR 1 Support and Possible In-Situ Alignment of ARIES-CS Divertor Target Plates Presented by A. René Raffray University of California,
December 3-4, 2003/ARR,1 1 ARIES-CS Engineering Approach Presented by A. R. Raffray University of California, San Diego L. El-Guebaly S. Malang D. K.
February 24-25, 2005/ARR 1 ARIES-CS Power Core Engineering: Status and Next Steps A. René Raffray University of California, San Diego ARIES Meeting GA.
Maintenance Schemes For ARIES-CS X.R. Wang a S. Malang b A.R. Raffray a and the ARIES Team a University of California, San Diego, 9500 Gilman Drive, La.
November 8-9, Blanket Design for Large Chamber A. René Raffray UCSD With contributions from M. Sawan (UW), I. Sviatoslavsky (UW) and X. Wang (UCSD)
Status of the Coil Structure Design and Magnetic-Structural Analysis Presented by X.R. Wang Contributors: UCSD: S. Malang, A.R. Raffray PPPL: H.M. Fan.
Ceramic Breeder Blanket Conceptual Design for ARIES-CS Contributors: S. Malang, A.R. Raffray, and L. El-Guebaly ARIES Meeting University of Wisconsin,
Scoping Study of He-cooled Porous Media for ARIES-CS Divertor Presented by John Pulsifer Major contributor: René Raffray University of California, San.
December 3-4, 2003/ARR 1 Maintenance Studies for 3-Field Period and 2-Field Period Configurations Presented by A. R. Raffray Major Contributors: X. Wang.
Status of 3-D Analysis, Neutron Streaming through Penetrations, and LOCA/LOFA Analysis L. El-Guebaly, M. Sawan, P. Wilson, D. Henderson, A. Ibrahim, G.
May 6-7, 2003/ARR 1 ARIES-CS Maintenance Scheme and Blanket Design for Modular Approach Presented by A. R. Raffray University of California, San Diego.
June19-21, 2000Finalizing the ARIES-AT Blanket and Divertor Designs, ARIES Project Meeting/ARR ARIES-AT Blanket and Divertor Design (The Final Stretch)
A design for the DCLL inboard blanket S. Smolentsev, M. Abdou, M. Dagher - UCLA S. Malang – Consultant, Germany 2d EU-US DCLL Workshop University of California,
Status of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray ARIES Meeting PPPL, NJ Sept.
Update of the ARIES-CS Power Core Configuration and Maintenance X.R. Wang S. Malang A.R. Raffray and the ARIES Team ARIES Meeting Madison, Wisconsin September.
March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.
Development of the FW Mobile Tiles Concept Mohamed Sawan, Edward Marriott, Carol Aplin University of Wisconsin-Madison Lance Snead Oak Ridge National Laboratory.
Maintenance Schemes for a DEMO Power Plant and related DCLL Designs Siegfried Malang 2 nd EU-US DCLL Workshop2 nd EU-US DCLL Workshop University of California,University.
October 27-28, 2004 HAPL meeting, PPPL 1 Thermal-Hydraulic Analysis of Ceramic Breeder Blanket and Plan for Future Effort A. René Raffray UCSD With contributions.
Engineering Overview of ARIES-ACT1 M. S. Tillack, X. R. Wang and the ARIES Team Japan/US Workshop on Power Plant Studies and Advanced Technologies
U PDATED ARIES-ACT P OWER C ORE D EFINITION AND S I C B LANKET X.R. Wang, M. S. Tillack, S. Malang F. Najmabadi and L.A. El-Guebaly ARIES-Pathways Project.
1 Neutronics Assessment of Self-Cooled Li Blanket Concept Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
R EFINEMENT OF THE P OWER C ORE C ONFIGURATION OF THE ARIES-ACT SA X.R. Wang 1, M. S. Tillack 1, S. Malang 2 and F. Najmabadi 1 1 University of California,
Helium-Cooled Divertor Options and Analysis
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
March 3-4, 2005 HAPL meeting, NRL 1 Assessment of Blanket Options for Magnetic Diversion Concept A. René Raffray UCSD With contributions from M. Sawan.
1 A Self-Cooled Lithium Blanket Concept for HAPL I. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
HAPL June 20-21, Overview of Chamber/Blanket Work Presented by A.R. Raffray UCSD With contributions from CTC Group and MWG Blanket contributions:
ARIES ACT1 Power Core Engineering M. S. Tillack, X. R. Wang, F. Najmabadi, S. Malang and the ARIES Team ANS 20 th Topical Meeting on the Technology of.
Updates of the ARIES-CS Power Core Configuration and Maintenance
DCLL TBM Reference Design
X.R. Wang, M. S. Tillack, S. Malang, F. Najmabadi and the ARIES Team
Improvements to power flow modeling in the ARIES system code
Integrated Design: APEX-Solid Wall FW-Blanket
DCLL Blanket Analysis and Power Core Layout for ARIES-DB
Can We achieve the TBR Needed in FNF?
University of California, San Diego
CERAMIC BREEDER BLANKET FOR ARIES-CS
Trade-Off Studies and Engineering Input to System Code
University of California, San Diego
CERAMIC BREEDER BLANKET FOR ARIES-CS
Presented by A. R. Raffray University of Wisconsin, Madison
Manifolding and MHD issues
University of California, San Diego
Status of ARIES-CS Power Core Engineering
CERAMIC BREEDER BLANKET FOR ARIES-CS
DCLL TBM Design Status FNST Meeting, August 12-14, 2008, UCLA
ARIES-CS Power Core Engineering: Status and Next Steps
University of California, San Diego
Presentation transcript:

ARIES-CS Maintenance Scheme and Blanket Design for Modular Approach Presented by A. R. Raffray University of California, San Diego L. El-Guebaly S. Malang D. K. Sze X. Wang and the ARIES Team ARIES Meeting Hilton Garden Inn, Livermore, CA May 6-7, 2003 May 6-7, 2003/ARR

Outline • Summarize engineering plan of action • Modular maintenance approach • Modular design with SiCf/SiC and Pb-17Li • Preliminary discussion of other maintenance approaches • Future work May 6-7, 2003/ARR

Proposed Plan for Engineering Activities Machine Parameters and Coil Configurations Maintenance Scheme 1 Maintenance Scheme 2 Maintenance Scheme 3 Evolve in conjunction with scoping study of maintenance scheme and blkt/shld/div. configurations Blkt/shld/div. 1 Blkt/shld/div. 2 Blkt/shld/div. 3 Blkt/shld/div. 1 Blkt/shld/div. 2 Blkt/shld/div. 3 Blkt/shld/div. 1 Blkt/shld/div. 2 Blkt/shld/div. 3 Year 1 Optimize configuration and maintenance scheme Optimize configuration and maintenance scheme Optimization in conjunction with maintenance scheme design optimization Optimize configuration and maintenance scheme Year 2 Overall Assessment and Selection Year 3 Detailed Design Study and Final Optimization May 6-7, 2003/ARR

Engineering Activities: Year 1 • Perform Scoping Assessment of Different Maintenance Schemes and Design Configurations - Three Possible Maintenance Schemes: 1. Sector replacement including disassembly of modular coil system (e.g. SPPS, ASRA-6C) 2. Replacement of blanket modules through maintenance ports arranged between all modular coils (e.g. HSR) 3. Replacement of blanket modules through small number of designated maintenance ports (using articulated boom) - Each maintenance scheme imposes specific requirements on machine and coil geometry Some initial thoughts for discussion Preliminary port size evaluation Current focus May 6-7, 2003/ARR

Engineering Activities: Year 1 Scoping analysis of possible blanket/shield/divertor configurations compatible with maintenance scheme and machine geometry, including the following three main classes: 1. Self-cooled liquid metal blanket(LiPb) (might need He-cooled divertor depending on heat flux) a) with SiCf/SiC b) with insulated ferritic steel and He-cooled structure 2. He-cooled liquid breeder blanket (or solid breeder) with ferritic steel and He-cooled divertor 3. Flibe-cooled ferritic steel blanket (might need He-cooled divertor depending on heat flux) - Evolve coil configuration(s) - Material and thicknesses - Radius of curvature, shape - Space and shielding requirements This presentation Presented at last meeting (PPPL, MIT) May 6-7, 2003/ARR

Proposed Analysis Procedure • Start with NCSX-based coil and plasma shape with 3-field period (From Long-Poe Ku’s memo) • Perform scoping maintenance scheme & configuration analysis • Need divertor guidelines (heat load, geometry) May 6-7, 2003/ARR

Plasma Access for Articulated Boom Between Ports for Modular Maintenance Approach With Limited Number of Ports • ITER modular maintenance approach - Rail system - Transporter from port to ~module plane on rail - Articulated boom to replace module • CS configuration makes a rail system very challenging - “Roller coaster” system - Perhaps single rail but only to provide support for boom when extended, not for transporter to carry module to and from port - Preferable to design for module replacement using articulated boom only if possible May 6-7, 2003/ARR

Modular Design Approach Using Articulated Boom • From EDITH-system*, boom built with: - a total length of ~ 10m - a reach of +/- 90° in NET - pay load of 1 ton - maximum height of 2 m • Current ARIES-CS modular design based on comparable parameters for 3 ports (horizontal or vertical) - half field period length ~ 9 m - minor radius =1.85 m (local plasma height varies over about 1.5-3.5 m) - Weight of empty module < 1 ton • Could use additional ports if required - Depending on access for module removal in toroidal direction over region serviced by port *Experimental -In-Torus Maintenance System for Fusion Reactors, FZKA-5830, Nov. 1966. May 6-7, 2003/ARR

Plasma Access for Articulated Boom Between Ports for Modular Maintenance Approach With Limited Number of Ports • Final number of ports, largest module size and degree of freedom of articulated boom (probably with at least 3-4 “elbows”) would depend on toroidal access through plasma space between port and furthest serviced region - If required, optimization between penalty of increasing reactor size and maintenance and module design considerations May 6-7, 2003/ARR

Blanket Modular Design Approach Using SiCf/SiC as Structural Material and Pb-17Li as Breeder/Coolant Based on ARIES-AT concept • High pay-off, higher development risk concept - SiCf/SiC: high temperature operation and low activation - Key material issues: fabrication, thermal conductivity and maximum temperature limit • Replaceable first blanket region • Lifetime shield (and second blanket region in outboard) • Mechanical module attachment with bolts - Shear keys to take shear loads (except for top modules) • Example replaceable blanket module size ~2 m x 2 m x 0.25m (~ 500-600 kg when empty) consisting of a number of submodules (here 10) May 6-7, 2003/ARR

Blanket Module Configuration Consists of a Number of Submodules Submodule configuration • Curved first wall for better Pb-17Li pressure (<~2 MPa) accommodation • 4 mm thick SiCf/SiC first wall with 1 mm CVD SiC coating • Hoop stress ~ 60 MPa • Mechanical attachment between two modules also shown • Side wall of adjacent submodules pressure balanced, except for each end submodule where thicker side walls are required to accommodate the pressure May 6-7, 2003/ARR

Coolant Flow and Connection for ARIES-CS Blanket Modular Design Using SiCf/SiC and Pb-17Li • Two-pass flow through submodule - First pass through annular channel to cool the box - Slow second pass through large inner channel • Helps to decouple maximum SiCf/SiC temperature from maximum Pb-17Li temperature - Maximize Pb-17Li outlet temperature (and cycle efficiency) - Maintain SiCf/SiC temperature within limits Use of freezing joint behind shield (and possibly vacuum vessel) for annular coolant pipe connection - Inlet in annular channel, high temp. outlet in inner channel May 6-7, 2003/ARR

Pb-17Li Coolant Coupled with Brayton Power Cycle Best near-term possibility of power conversion with high efficiency Maximize potential gain from high-temperature operation with SiCf/SiC Compatible with liquid metal blanket through use of HX Cycle Efficiency Increases with Maximum Cycle He Temperature - Compression ratio set to maximize cycle efficiency in each case - For TSiC/SiC < 1000°C, Max. THe,cycle ~ 900°C and hcycle~ 0.55 - Compression ratio is additional control knob May 6-7, 2003/ARR

HX Inlet He Temperature (and, hence, Power Core Pb-17Li Inlet Temperature) Can Be Set by Adjusting Cycle Compression Ratio Some flexibility in setting cycle compression ratio, and inlet HX He temp. (dictating inlet blanket Pb-17Li inlet and max. SiCf/SiC temp.) with minimal decrease in cycle efficiency temperature May 6-7, 2003/ARR

Maximum SiC/SiC Temperature Can be Reduced by Decreasing the Annular Channel Thickness, but with a Pressure Drop Penalty May 6-7, 2003/ARR

Temperature Distribution in Example ARIES-CS Blanket Modular Design Using SiCf/SiC and Pb-17Li • Pb-17Li Inlet Temperature ~ 699°C • Pb-17Li Outlet Temperature ~ 1100°C • Maximum SiC/SiC Temperature ~ 970 °C • Maximum SiC/LiPb Temperature ~ 900 °C May 6-7, 2003/ARR

Typical Parameters for Example ARIES-CS Blanket Design with SiCf/SiC and Pb-17Li (Not fully optimized yet) May 6-7, 2003/ARR

Modular Maintenance Approach with Ports Between Each Coil • Minimum Port Sizes - 1.6 m x 2.3 m and 1.2 m x 5.0 m - Quite limiting constraint on size of module - Desirable to accommodate ~2 m x 2 m x 0.25 m module • Unless reactor size (and port size) is increased, this maintenance scheme seems marginal and a modular maintenance scheme through fewer larger ports is preferable May 6-7, 2003/ARR

Sector-Like Maintenance Approach • Based on current example machine configuration, the following sector removal seems possible - 3 sectors consisting of 4 coils each - 3 sectors consisting of 2 coils each - Must remove two larger sectors first and then smaller sector - Complex maintenance process - Size and number of maintenance sectors would change based on several parameters including: - size of machine - toroidal protrusion of coil on adjacent coil - size coil + casing - Guidance needed on these, e.g. - confirmation of smaller size coil + casing (20 cm?) - physics wise how much do we lose with ~10’s cm less toroidal coil protrusion? May 6-7, 2003/ARR

Some Initial Thoughts for Sector-Like Maintenance Approach Based on Disasembling the Modular Coil System (S. Malang) 1. Is it feasible to heat up the coil system prior to disassembly or is it necessary to design the coil system for “cold” maintenance - If heating up the system is feasible (for blanket replacement), how much additional time would be required for such an operation? - Impact of this additional time will depend on frequency of blanket replacement - e.g. a cool-down period of ~1 month years would probably be acceptable for blanket replacement (~3MW/m2, 0.85 load factor-->200 dpa steel) every ~8 years of operation (~1% impact on availability) 2. Which kind of connections between the cold coil system and a support at ambient temperature can be designed to carry the total weight of coils + supporting structure? - The issue here is the heat flow to the cold system through the supporting legs. - More serious problem for LTSC’s - Is a requirement for the cryogenic plant of ~1 MW acceptable (corresponding to ~1000W of heat removal)? May 6-7, 2003/ARR

Some Initial Thoughts for Sector-Like Maintenance Approach Based on Disasembling the Modular Coil System (cont.) 3. How can the coil system be supported to react the radial forces pulling it toward the centre of the system? • These are by far the largest forces acting on the coils. - Up to 350MN per coil for the SPPS- Stellarator, reacted by a ring with a 5-m inner radius of and a 3-m wall thickness • Such large forces cannot be transferred from a cold to a warm component (through an insulation). • Therefore, the coil winding, housing, and the supporting ring in the centre have to be operated at a uniform cryogenic temperature. • Already challenging to design such a system without the requirement to allow for disassembling the coils for blanket replacement. • This issue needs more attention than previously paid by a number of Stellarator reactor studies. May 6-7, 2003/ARR

Some Initial Thoughts for Sector-Like Maintenance Approach Based on Disasembling the Modular Coil System (cont.) 4. How large are the forces between neighboring coils, and how can they be reacted? • For planar coils with equal current flow these forces are balanced, but if one coil fails, large forces would act on the neighboring coils. • For a system with non-planar coils, forces between neighboring coils exist but are balanced within each field period in the case of a Stellarator . • All coil windings of a field period could be placed in grooves of a common support tube strong enough to balance the lateral forces of the coils. • If this is feasible, these support tubes would be “stand-alone elements” not requiring force transfer between field periods. • This would be advantageous for blanket maintenance but at the expense of having to move a huge unit for blanket replacement (the size would be reduced if it could be done over half a field period) 5. How can the weight of the blanket+neutron shield be transferred to the base structure of the reactor? • For the above-mentioned case with a strong supporting tube per field period, the weight of the cold elements (winding + supporting tube, ~ 5000 tonnes) must be transferred to the vacuum vessel through supporting legs with minimum heat conduction area • The weight of the “warm” components surrounding the plasma (FW, breeding blanket, reflector, neutron shield, ~ 10,000 tonnes) ) must be transferred to the fundament of the vacuum vessel via “warm” leg, reaching through openings in the “cold” support tubes of the coils. • There has to be insulation around these legs, and the legs can be used to house the coolant access tubes for the blankets. May 6-7, 2003/ARR

Guidance Needed on Several Questions, Including: 1. Coil: HTSC or LTSC 2. Coil: Confirm thickness of windings+casing 3. Coil: Demountable or not 4. Coil/Physics: What is the penalty of shaving off ~10 cm’s radially to facilitate access for sector maintenance 5. Coil/Physics: What is the penalty of changing the number of field periods (e.g. going from 3-field to 2-field or 4-field periods) 6. Divertor: Location, heat loads, particle fluxes? 7. Starting Point Configuration: Need revised consistent set of power density, machine size, plasma parameters and magnetic field May 6-7, 2003/ARR