Mini Case Study Hotcat (Knottingley)

Slides:



Advertisements
Similar presentations
1 Conservation Program Cost-Effectiveness Tests Presentation to the: Florida Public Service Commission Workshop on Energy Efficiency Initiatives November.
Advertisements

Load Management System with Intermittent Power on the Grid Ruth Kemsley CEng MIMechE MIEE Econnect Ventures Ltd.
International Mechanical Codes Scald Protection. – Where a combination potable water-heating and space-heating system requires water for space.
Part of the BRE Trust Protecting People, Property and the Planet What have fire doors ever done for us? Ian Stewart Certification scheme manager June 2014.
SAFETY OF URBAN ROOFTOP WIND SYSTEMS Bruce Lipscombe I Want Energy Pty Ltd.
Installation of New CHP system at the Old Aberdeen Campus.
PErforM for work teams Insert presenters names and titles.
DESIGN GUIDE FOR GAS CENTRALISED HOT WATER SYSTEMS
Gary C Akers Technical Manager. * No wall clutter. * Reduced risk of clashes. * Aesthetically pleasing. * Site benefits. * Environmental benefits. * Cooling.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
LCGP Project Mini Case Study Hotcat Small (Crossgates)
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Tom Kader Chief Electrical Inspector Spaces About Electrical Equipment Sufficient access and working space shall be provided and maintained about.
© 2001 The Gas Company. All copyright and trademark rights reserved. High Efficiency Unit Heaters Workpaper Presentation Prepared for Cal TF Presentation.
STUDY OF BOILER’S ACCESSORIES
IRP21: It’s Almost Over 2010 ICoTA Roundtable. Driven by events Suggested by various regulatory bodies We did have a choice ‘We’ could write this or let.
Hawke’s Bay Refrigeration
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions This unit will give you the opportunity.
Air Conditioning and Computer Centre Power Efficiency The Reality Christophe Martel Tony Cass.
Mechanical Integrity Quality Assurance. Lesson Objectives  Describe How to Ensure Controls in Place for QA  Describe Standard Record for Inspection.
AKTAU, SEPTEMBER 2012 WESTERN KAZAKHSTAN INVESTMENT FORUM PRESSURE VESSELS.
LCGP Project Mini Case Study LP Steam (Low Moor).
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
J. Pedersen EN DSO Performance Scientific performance Measurable, reproducible, controllable: Documented presence! Technical performance Measurable,
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
The Road to New Plant Approvals Graeme Claridge. New Plant Approvals How do we get to this stage.
Workshop on the Implementation of the Pressure Equipment Directive In-Service Inspection Overview of UK Legislation Martin Yates Safety Assessment Federation.
HB BRANCH NZISM Managing Contractors Sergai Davis & Jennie Kuzman  Its about communication, the nature of the relationship, and establishing health and.
I Need A Space Heating System Let’s Look At A Central Steam Plant Option.
Hot Work Permit Osan AB Fire Emergency Services.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Rev. 1 © Chevron 2009 Hot Work Awareness Plus. Rev. 1 © Chevron Training Objectives  To explain the type of work which may constitute Hot Work.
Start presentation Bio-fuel pellet utilization in heat production, Finnish experience, examples and practices Finnish Energy Day Ukraine, Kiev Managing.
Solar Water heating System information card
New Jersey Energy Efficiency, Generation & Resilience Funding Update
Exhaust Heat Recovery Systems
Utility Bills Reduction by Energy Consumption Management
Sean Weber Energy Engineer
Some arrangements for personnel safety 1- Procedures for access
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
Energy Savings Projects
Part 2 Technician’s Guide & Workbook for Duct Diagnostics and Repair
Construction (Design and Management) Regulations (CDM) 2015
Eastern Pennsylvania Laboratory Facility
Hazardous Areas & Hazards of Electricity
پروتكل آموزش سلامت به مددجو
TRD GAS SYSTEM PRR Gas System Integration Gas building
SHE Code 33: Safety of Pressure and Vacuum Systems
NET-ZERO-ENERGY (NZE) WASTEWATER TREATMENT PLANTS (WWTPs)
EcoTech Heating and Controls LTD Commercial Boiler House Install
Our Carbon Footprint Journey SBN Meeting 8 June 2018
Mini Case Study LP Steam (Little Burdon)
Mini Case Study LP Steam (Towton)
Public Hearing April 17, :30 pm Town Hall-Meeting Room B
Oleh : Ir. Sjaifuddin Thahir, MSc.
Multiple renewable install
Boiler house and changing rooms refurbishment
EcoTech Heating and Controls LTD Wood Pellet Cooker/Boiler Install
City Council Meeting November 14, 2016
Safety in Facility Design Briefing from Watercare February 2019
Boiler house refurbishment Merthyr
Workshop on the Implementation of the Pressure Equipment Directive In-Service Inspection Overview of UK Legislation Martin Yates Safety Assessment Federation.
Mini Case Study Hotcat (Ganstead)
Parker domnick hunter. Safety of Electrical and
Presented by: Margaret Iregi & Enock Biamah.
National Legislation in the Pressure Sector and the PED
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Mini Case Study Hotcat (Knottingley) LCGP Project Mini Case Study Hotcat (Knottingley)

Hotcat Medium (Knottingley) STATISTICS Equipment supplier : Bruest Catalytic Heaters Method of Preheating : Hotcat Installed preheater capacity : 820kW Peak Site Demand : 300kW Main Works Contractor : Stanningley Engineering Services Ltd Commissioned : November 2017  

Hotcat Medium (Knottingley)

Hotcat Medium (Knottingley) LESSONS LEARNT Carrying out a separate G17 design approval / appraisal for the preheater itself is meaningless The pipework within the unit should be classified as a ‘pressure vessel’ (not as a ‘pipe’, Hence relevant design standards apply). Future projects should consider if this is ‘over engineered’ to save Capital. NB PSSR Inspections can be carried out without the need to remove all heating panels. The ‘gas’ side of the hotcat shall not be considered a confined space unless it is accessed via only one single leaf door while the others remain closed. As such, this option for access will not be made appropriate for maintenance staff and the unit shall not be considered to be a confined space. Future projects should consider if this is ‘over engineered’ to save Capital. The gas side of the hotcat shall be considered to be a Zone 2 Hazardous area. Commissioning is simple and short in duration (5 days max.).