THE UNITED NATIONS GREAT LAKES REGIONAL STRATEGIC FRAMEWORK

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

1 UN Coherence: High level monitoring and evaluation approach.
Decision Making Tools for Strategic Planning 2014 Nonprofit Capacity Conference Margo Bailey, PhD April 21, 2014 Clarify your strategic plan hierarchy.
Emerging Trends and Challenges in Business Environment Reform Donor Committee for Enterprise Development Montreux 12 September 2006.
Project Title Project Investigators Project Duration: (E.g., 3 years; currently in year 2, or x months if this is a better representation of project time)
This project is funded by the EUAnd implemented by a consortium led by MWH Logical Framework and Indicators.
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
Strengthening Institutional Frameworks for Sustainable Development Pre-event on Institutional Frameworks for Sustainable Development in Africa: Integrating.
FLLLEX – Final Evaluation
APPLICATION FORM OF ROBINWOOD SUBPROJECT SECOND STEP 1. The short listed Local Beneficiaries work together to create international partnerships and prepare.
Tracking of GEF Portfolio: Monitoring and Evaluation of Results Sub-regional Workshop for GEF Focal Points Aaron Zazueta March 2010 Hanoi, Vietnam.
Step 1: Linking Quality and Equity. Linking Quality and Equity Agenda Overview of the Training Series Linking Quality Improvement and Equity Exercise.
Belgrade, Donor Coordination Meeting Belgrade, 30 th of November 2011.
Draft Modernization Roadmap for the Geospatial Platform Karen Siderelis NGAC Meeting March 25,2010.
Evaluation of NRNs Andreas Resch, Evaluation Advisor.
Grant Application Form (Annex A) Grant Application Form (Annex A) 2nd Call for Proposals.
ESPON Info Day on New Calls and Partner Café 18 May 2010 in Bruxelles Call for Proposals on Transnational Networking Activities (Projects carried through.
HUMANITARIAN RESPONSE MONITORING. HOW TO USE THIS PRESENTATION This presentation contains a complete overview of all aspects of Response Monitoring Presenting.
GEO Work Programme 2016 WGISS#40 HARWELL (UKSA) 28 SEP - 02 OCT 2015 MIRKO ALBANI, ESA.
A BRIEF OVERVIEW OF THE POLICY ISSUES CONCERNING THE RCA PROGRAMME PRINATH DIAS RCA COORDINATOR.
LCC NETWORK STRATEGIC PLANNING Orientation Webinar for Strategic Planning Training and Workshop Participants July 21, 2014 Presenter: Michael Gale, LCC.
Recommendations on project/action design and structure.
Stages of Research and Development
Building an ENI CBC project
COOEXCEL TIPS Include clearly your contact details
SPSA Evaluation Reyna Corral
5 steps to align your talent strategy to the organisational strategy
Translating ideas into proposals for action programmes
Herman Smith United Nations Statistics Division
PRIORITIES FOR THE FUTURE
DPM Programme Office Databases to Support Information Sharing, Coordination, Crosscutting Project Development and Progress Monitoring James Douris DPM.
GEO’s approach to user need definition and Gap Analysis process
Writing A Grant—From Start To Finish
THE UNITED NATIONS GREAT LAKES REGIONAL STRATEGIC FRAMEWORK
Regional preparatory process for Rio+20
A Guide to SDG Interactions: from Science to Implementation
QUALITY IMPROVEMENT FINAL QUARTERLY COLLABORATIVE WORKSHOP
Review of integrated PSM resources and tools and introduction to group work Upjeet Chandan ICCM FTT 17th February 2016.
WMO Integrated Global Observing System (WIGOS) 16-RA VI Side Event Helsinki, Finland, 11 September 2013 Dr Miroslav Ondráš, Dr Wenjian Zhang (WMO) Dr.
30 October 2016, Kigali, Rwanda Country Team Members: Insert names
Global Youth Tobacco Survey (GYTS): Proposal Development
Тowards regionally-based standards of qualifications
Are we ready to move to the Design Phase?
RRP6 Development Process
Convention on the Transboundary Effects of Industrial Accidents
Implementation of the UN DA 10 project “The African context”
Discussions support slides
4.1 Selecting Project Purposes and Outcomes
Day One Activities Day Two Activities Strengths and Challenges –
Overview of the Strategic Framework Guda Alemayehu September 29,2016 Dakar We are now over 300 members.
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Partnership reference success story <partnership name>
Kampala (Uganda), October 2016
Definition of Project and Project Cycle
Development of energy balance statistics
Discussions support slides
Are we ready to move to the Creation Phase?
European Innovation Partnership on Water
United Nations Voluntary Fund on Disability (UNVFD)
Preliminary methodology for the assessment of Member States’ reporting on Programme of Measures (Article 16) WG DIKE Sarine Barsoumian (12/10/2015, Brussels)
Strategic Planning Final Plan Team Meeting
Environment and Development Policy Section
Natura 2000 management group Brussels, 19 May 2011
Translating ideas into proposals for action programmes
Name of Your Outcome Presenter’s Name, Organization and
UNFCCC Needs-based Finance (NBF) Project
Project intervention logic
Notes: Rapid assessments.
Project intervention logic
WP7 – Related activities
Presentation transcript:

THE UNITED NATIONS GREAT LAKES REGIONAL STRATEGIC FRAMEWORK 2016-2017 Presentations of Pillars by Pillar Leads Pillar XXXX Ensuring effective cross border implementation to address regional conflict drivers Kampala (Uganda), 19-20 October 2016

Overview of the Pillar components Pillar XXXX Please list here as identified in the Framework, the latest version of the CN of the Implementation Plan and the RRF: Main outcome(s) of the Pillar; Priority interventions – main output and a list of activities; Beneficiaries; Lead agencies; Budget and funding gap; Any other relevant information (contribution to SDGs).

Updates on working documents Pillar XXXX Updates on working documents Please update on the progress made on the revision of CNs, budget, RRF, on the finalization of the 2 years workplan and the design of the regional interventions.

Current stage of implementation Pillar XXXX Current stage of implementation Please list the progress already made towards the expected results (also preparatory work, fine tuning of documents etc).

Pillar XXXX Next steps Please list the next steps that are foreseen with a timeline (where possible), roles and responsibilities.

Mapping stakeholders, potential partners and donors. Pillar XXXX Mapping stakeholders, potential partners and donors. Please list main stakeholders at regional levels and potential partners and donors for the Pillar. How will the project work with partners to achieve results? What are partners already doing which is critical? This may be the result of the discussion during the workgroups.

Pillar XXXX Main challenges, actions and recommendations to facilitate the implementation of regional interventions Please list the main challenges to the effective implementation of the regional interventions and the key actions and recommendations to address and mitigate them (possibly with definition of responsible and a roadmap).

Potential synergies with national interventions and other Pillars Pillar XXXX Potential synergies with national interventions and other Pillars Please list some potential synergies that could be lifted with existing regional interventions (also refer to the mapping exercise) and interventions under the other Pillars. Describe how you intend to coordinate with existing interventions and explore synergies with other Pillars.

Contact persons Pillar XXX: name, title, email THANK YOU Thank you for your attention! Contact persons Pillar XXX: name, title, email contact person.