Job Tasks The Foundation of an Effective Training Program

Slides:



Advertisements
Similar presentations
A Systems Approach To Training
Advertisements

EMS Checklist (ISO model)
PER
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Software Quality Assurance Plan
Contractor Management and ISO 14001:2004
ISO General Awareness Training
Unit 8: Tests, Training, and Exercises Unit Introduction and Overview Unit objectives:  Define and explain the terms tests, training, and exercises. 
Notice of Compliance Audit
ISO 9000 Certification ISO 9001 and ISO
Control environment and control activities. Day II Session III and IV.
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
S/W Project Management
NERC PER-005 Overview May 10, Who, What, When, Where, Why WHO: RC, TOP, BA WHAT: –R1: Systematic Approach to Training –R2: Verify operator capabilities.
Basics of OHSAS Occupational Health & Safety Management System
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
NIST Special Publication Revision 1
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
INTERNAL CONTROL OVER FINANCIAL REPORTING
Chapter 5 Internal Control over Financial Reporting
Internal Control in a Financial Statement Audit
NO FRAUD LEFT BEHIND The Effect of New Risk Assessment Auditing Standards on Schools Runyon Kersteen Ouellette.
Presented by: Meg Boyd The Blue Mountains Drinking Water System: DWQMS Overview.
Evaluation of Internal Control System
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
Problem Areas Updates Penalties FRCC Compliance Workshop September / October
ISO Registration Common Areas of Nonconformances.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Chapter 6 Internal Control in a Financial Statement Audit McGraw-Hill/IrwinCopyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
 Planning an audit of cost statements, records and other related documents is considered necessary to ensure achievement of audit objectives with available.
ISO Certification For Laboratory Accreditation ISO Certification For Laboratory Accreditation.

Fundamentals of Human Resource Management 8e, DeCenzo and Robbins
Training processes for extension education
Internal Control Principles
Software Project Configuration Management
TOPS TRAINING.
Phase Angle Limitations
Training Trainers and Educators Unit 8 – How to Evaluate
COM Operating Personnel Communications Protocols
Program Quality Assurance Process Validation
Project Management Processes
Project Integration Management
Phil O’Donnell, Manager Operations and Planning Audits
OH&S Management System
Air Carrier Continuing Analysis and Surveillance System (CASS)
Training Trainers and Educators Unit 8 – How to Evaluate
Fundamentals of Human Resource Management 8e, DeCenzo and Robbins
Fundamentals of Human Resource Management 8e, DeCenzo and Robbins
North Central Region Emergency Care Council
Topic Principles and Theories in Curriculum Development
EMS Checklist (ISO model)
Job Analysis CHAPTER FOUR Screen graphics created by:
Safety Management System Implementation
Project Management Processes
Larry Bugh ECAR Standard Drafting Team Chair June 1, 2005
FUNCTION OF MANAGEMENT
LESSON 3 Job Analysis Dr. Salim Al-Shukaili.
Chapter # 8 Quality Management Standards
How to conduct Effective Stage-1 Audit
Deconstructing Standard 2a Dr. Julie Reffel Valdosta State University
Phil O’Donnell, Manager Operations and Planning Audits
Fundamentals of Human Resource Management 8e, DeCenzo and Robbins
Internal Control Internal control is the process designed and affected by owners, management, and other personnel. It is implemented to address business.
HR AUDIT (An Early Evaluation System) (An Early Evaluation System) S.Jayaprakash., M.Sc (IT), PGD.HRM, DLL & AL.
Presentation transcript:

Job Tasks The Foundation of an Effective Training Program Greg Coventry Compliance Auditor Operations & Planning Western Electricity Coordinating Council

BES Reliability Related Tasks Western Electricity Coordinating Council

Western Electricity Coordinating Council Agenda Discussion of: Purpose of PER-005 Systematic Approach to Training (SAT) Importance of System Operator Training & Tools Importance of a Training Plan/Program Western Electricity Coordinating Council

Western Electricity Coordinating Council Agenda Primary focus on: Why a systematic approach to training is task based? Why training is most efficient and effective when developed and conducted at the task level? What is a Task? What is a BES Company Specific, Real-time Reliability-related Task (RRT)? Western Electricity Coordinating Council

Western Electricity Coordinating Council Focus Identification and development of an effective “BES company specific, Real-time, Reliability-related Task list” Western Electricity Coordinating Council

… a systematic approach to training is task based? Why… … a systematic approach to training is task based? Western Electricity Coordinating Council

Western Electricity Coordinating Council Why… …training is most efficient and effective when developed and conducted at the task level? Western Electricity Coordinating Council

Western Electricity Coordinating Council Tasks What is a task? Where to find information for task identification Characteristics of a Task Statement What does a task statement look like? Western Electricity Coordinating Council

Western Electricity Coordinating Council What is… …a BES, company specific, RRT? Can it be defined? How to distinguish what tasks are RRTs Western Electricity Coordinating Council

Western Electricity Coordinating Council Audience for RRT Power System: Operations personnel Operations support personnel Operations training personnel Operations Management Personnel Western Electricity Coordinating Council

Western Electricity Coordinating Council PER-005-2 [R1]/[R2] R1 (RC, BA, TOP) R2 (TO*) R1/R2 Use a systematic approach to develop and implement a training program 1.1 / 2.1 Create a list of Bulk Electric System (BES) company-specific Real-time reliability-related tasks based on a defined and documented methodology 1.1.1 / 2.1.1 Review, and update if necessary, its list of BES company-specific Real-time reliability-related tasks each calendar year Illustration demonstrating similarities between PER-005-2 R1 & R2 * For personnel identified in Applicability Section 4.1.4.1 Western Electricity Coordinating Council

Western Electricity Coordinating Council PER-005-2 [R1]/[R2] R1 (RC, BA, TOP) R2 (TO*) 1.2 / 2.2 Design and develop training materials according to its training program, based on the BES company-specific Real-time reliability-related task list 1.3 / 2.3 Deliver training to its System Operators according to its training program Deliver training to its personnel* according to its training program 1.4 / 2.4 Conduct an evaluation each calendar year of the training program to identify any needed changes and shall implement the changes identified Illustration demonstrating similarities between PER-005-2 R1 & R2 Design & Develop Deliver Review Annually * For personnel identified in Applicability Section 4.1.4.1 Western Electricity Coordinating Council

What’s all the hubbub about? PER-005-2 Purpose: To ensure that personnel performing or supporting Real-time operations on the Bulk Electric System are trained using a systematic approach . Western Electricity Coordinating Council

Systematic Approach to Training (SAT) Determines: The skills and knowledge needed to perform BES company-specific Real-time reliability-related tasks What training is needed to achieve those skills and knowledge Western Electricity Coordinating Council

Systematic Approach to Training (SAT) Determines: If the learner can perform the BES company-specific Real-time reliability-related task(s) acceptably in either a training or on-the-job environment If the training is effective, and make adjustments as necessary Western Electricity Coordinating Council

System Operators primary job responsibility Mission #1 System Operators primary job responsibility Maintain the BES in a reliable state Keep the lights on & meters turning Western Electricity Coordinating Council

Maintaining system reliability: Mission #1 Maintaining system reliability: Real-time system operations is where the rubber meets the road The entire CMEP is all about maintaining the operational reliability of the BES. When it comes to Reliability, Real-time operations is where the rubber meets the road. The term “Real-time” is defined in the NERC glossary of terms used in Reliability Standards as “Present time as opposed to future time” Now that may sound fairly intuitive but what does it really mean Essentially, it means in the moment…now…immediately. In a “Jiffy” Real-time => Present time as opposed to future time In the moment…now…immediately Western Electricity Coordinating Council

System Operators (SOs) Maintaining system reliability: System Operators are an entities most important asset for maintaining system reliability Regardless of what happens on the BES, it’s the job of the SO to respond We’re talking about the coordinated operation of the largest machine known to man… When it comes to maintaining system reliability, SOs are an entities most important asset Regardless of what happens on the power system it’s the job of the SO to respond as appropriate to maintain or restore the system to a reliable state Western Electricity Coordinating Council

System Operator Training & Tools Maintaining system reliability: Training, tools, and support are essential to the SO in the performance of their jobs… and ultimately, Reliability of the BES Western Electricity Coordinating Council

Western Electricity Coordinating Council Training Plan Provides a methodology to establish and continually support a training program for system operations staff directly involved in operation of the Real-time power system. This includes: • SOs • Operations support personnel whose functions could impact the reliability related performance of the SOs Western Electricity Coordinating Council

Training Plan Methodology Systematic Approach to Training (SAT) Primary methodology used to develop a Training Plan Many variations to the application of the SAT process Exact SAT model employed is secondary to the results obtained What is important: Training requirements are first identified Training solutions developed and delivered Operations staff are continually trained and evaluated in an efficient and effective manner Western Electricity Coordinating Council

Baseline Requirements To establish a baseline of knowledge for the training program All SO trainee candidates are assumed to meet the minimum requirements as stipulated in the company job description Operations support personnel are assumed to be competent in their specific fields Telecommunications Operations engineers EMS engineers Operations training personnel Load forecast analysts Western Electricity Coordinating Council

Western Electricity Coordinating Council SAT Task Based SO Tasks are the individual foundational elements of the overall job responsibilities Ability to apply skills and knowledge required to perform tasks sequentially or concurrently is an essential function of the SO responsibilities Competency at performing tasks associated with a given SO position is required for overall job proficiency Competent SOs are skilled switch-taskers Western Electricity Coordinating Council

Systematic Approach to Training (SAT) Training is most efficient and effective when developed and conducted at the task level Begin with basic simple and frequently performed tasks – create the initial foundation – task by task Develop skills and competency by building on that foundation and challenging trainee to perform increasingly difficult tasks sequentially or concurrently as needed Once fully trained, a competent SO will be able to perform tasks as needed by Real-time conditions with confidence Western Electricity Coordinating Council

Systematic Approach to Training (SAT) True competency is developed over time, with experience, continued training, and development of an intuitive feel for the “company-specific” system Western Electricity Coordinating Council

Systematic Approach to Training (SAT) A typical training plan in NERC employs the SAT process through the five step ADDIE training model: Analysis Design Development Implementation Evaluation Western Electricity Coordinating Council

Western Electricity Coordinating Council ADDIE Western Electricity Coordinating Council

Western Electricity Coordinating Council Analysis Analysis phase is used to: Determine training needs Identify training requirements Most important input for developing learning objectives and any associated training content in later phases of the process Western Electricity Coordinating Council

Analysis To ensure a properly focused training program: Needs Analysis Job Analysis Task Analysis Western Electricity Coordinating Council

Western Electricity Coordinating Council Needs Analysis New training programs start with a Needs Analysis Identify training needs of the target audience and determine what the training solution should be Defining the training objective Collecting relevant information (job descriptions, SME interviews, etc.) Defining the implication (goal of training, training type, target audience, scope, etc.) Western Electricity Coordinating Council

Western Electricity Coordinating Council Job Analysis Starting point used to create a list of tasks for a specific job (i.e. System Operator) System Operator job functions can be divided into “duty areas” System Reliability Transmission Operations Generation Balancing Interchange Emergency Operations Western Electricity Coordinating Council

Western Electricity Coordinating Council Job Analysis Starting point used to create a list of tasks for a specific job (i.e. System Operator) System Operator job functions can be also be identified by position / AOR Reliability Coordinator (RC) Transmission Operator (TOP) Balancing Authority (BA) Western Electricity Coordinating Council

Western Electricity Coordinating Council Task Analysis What is a task? A work activity that: Has a definite beginning and end Is measurable or observable Consists of two or more definite steps, and Leads to a desired outcome Western Electricity Coordinating Council

Western Electricity Coordinating Council Task Analysis Sources for identifying Tasks Industry colleagues and experts NERC Reliability Standards Job description Internal Procedures Corporate Policies Internal Interviews Western Electricity Coordinating Council

Western Electricity Coordinating Council Task Analysis Once available sources are identified: Consult with industry colleagues and SMEs Best practices Review of available job information NERC Standards Job description Operating procedures Company policies (safety and other) Prepare interview questions Conduct interviews and observe on-shift conditions Develop a preliminary task list by Duty Area (repeat steps above as needed) Western Electricity Coordinating Council

Western Electricity Coordinating Council Task Analysis Finalize the comprehensive task list Categorize tasks For each task, write a task statement that describes the task Western Electricity Coordinating Council

Western Electricity Coordinating Council Task Statement What is a Task Statement? Narrative description of the task: Describes a given condition Describes actions to be taken by the SO Describes the desired outcome Measurable or Observable Western Electricity Coordinating Council

Western Electricity Coordinating Council Task Statement Example 1: Task: Respond to actual or potential transmission system SOL violations in accordance with company operating procedures and current system conditions Task Statement: Given a System Operating Limit violation on the transmission system, implement the correct procedure for the circumstances to restore loading to within normal operating limits Western Electricity Coordinating Council

Western Electricity Coordinating Council Task Statement Description of given operating condition Given a System Operating Limit violation on the transmission system, implement the correct procedure for the circumstances to restore loading to within normal operating limits Western Electricity Coordinating Council

Western Electricity Coordinating Council Task Statement Description of actions to be taken by the SO Given a System Operating Limit violation on the transmission system, implement the correct procedure for the circumstances to restore loading to within normal operating limits Western Electricity Coordinating Council

Western Electricity Coordinating Council Task Statement Description of desired outcome Given a System Operating Limit violation on the transmission system, implement the correct procedure for the circumstances to restore loading to within normal operating limits Western Electricity Coordinating Council

Western Electricity Coordinating Council Task Statement Example 2: Task: Monitor generator bus voltage and MVAR output to ensure that they are maintained within agreed schedules and take action to correct deviations as needed Task Statement: Given System Operating conditions, identify deviations in generator voltage and/or MVAR output, and initiate actions or direct the actions of others to restore generator bus voltage and MVAR output pursuant to schedules provided by the TOP Western Electricity Coordinating Council

Western Electricity Coordinating Council Task Statement Description of given operating condition Given System Operating conditions, identify deviations in generator voltage and/or MVAR output, and initiate actions or direct the actions of others to restore generator bus voltage and MVAR output pursuant to schedules provided by the TOP Western Electricity Coordinating Council

Western Electricity Coordinating Council Task Statement Description of actions to be taken by the SO Given System Operating conditions, identify deviations in generator voltage and/or MVAR output, and initiate actions or direct the actions of others to restore generator bus voltage and MVAR output pursuant to schedules provided by the TOP Western Electricity Coordinating Council

Western Electricity Coordinating Council Task Statement Description of desired outcome Given System Operating conditions, identify deviations in generator voltage and/or MVAR output, and initiate actions or direct the actions of others to restore generator bus voltage and MVAR output pursuant to schedules provided by the TOP Western Electricity Coordinating Council

Western Electricity Coordinating Council Task Statement Example 3: Task: Run real-time contingency analysis to determine next worst contingencies and their impact on BES reliability Task Statement: Given System Operating conditions, perform a RTCA, identify the next worst contingency and determine their impact on BES reliability Western Electricity Coordinating Council

Western Electricity Coordinating Council Task Statement Description of given operating condition Given System Operating conditions, perform a RTCA, identify the next worst contingency and determine their impact on BES reliability Western Electricity Coordinating Council

Western Electricity Coordinating Council Task Statement Description of actions to be taken by the SO Given System Operating conditions, perform a RTCA, identify the next worst contingency and determine their impact on BES reliability Western Electricity Coordinating Council

Western Electricity Coordinating Council Task Statement Description of desired outcome Given System Operating conditions, perform a RTCA, identify the next worst contingency and determine their impact on BES reliability Western Electricity Coordinating Council

Task Statement: Practice Evaluate scheduled generation outage based on current or anticipated system conditions and decide to authorize or postpone based on system reliability requirements Western Electricity Coordinating Council

Task Statement: Practice Issue/Respond to Operating Instructions using established communications protocols and three-part communications Western Electricity Coordinating Council

Real-time, Reliability-related Job Task Analysis Take a closer look at the task list to examine each task and assess whether or not it can be classified as a Real-time, Reliability-related task Western Electricity Coordinating Council

Job Task Analysis - RRTs What is a RRT? Can it be defined? Left up to entities to define? Western Electricity Coordinating Council

Job Task Analysis - RRTs BES RRTs company-specific Real-time PER-005-2 specifies the RC, BA, TOP, TO…based on a defined and documented methodology “shall create a list of…all together now!!! (BES) company-specific Real-time reliability-related tasks AKA RRTs Note: BES and Real-time are both capitalized…these are terms defined in the NERC glossary of terms used in Reliability Standards. If you think about it from the big picture perspective…what we’re talking about here is the defined and documented methodology reliability-related tasks Western Electricity Coordinating Council

Reliability Related Tasks Audit Approach Reliability-Related Tasks Generally those tasks that must be performed only by a NERC-certified System Operator Includes tasks performed during normal operations to operate the system within SOLs Includes tasks performed during contingent, emergency and restoration conditions Western Electricity Coordinating Council

RRT Example Definition A System Operator’s job task shall be considered a BES company specific, Real-time, reliability-related task (RRT) when the task has the potential to impact the adequate level of reliability to the BES Best Practice…Here’s an example of RRT definition…for consideration…the key is that a proper definition of RRT needs to address all aspects of RT operations. (i.e. Normal, Abnormal, & Emergency) Example: A System Operator’s job task shall be considered a BES company specific, Real-time, reliability-related task (RRT) when the task has the potential to impact the Adequate Level of Reliability to the BES Only caveat is this definition requires an additional clarifying definition of what an “Adequate Level of Reliability” is Western Electricity Coordinating Council

Adequate Level of Reliability An Adequate Level of Reliability is defined by the following characteristics: The system is monitored and controlled to stay within acceptable limits during normal conditions The system performs acceptably after credible contingencies System resiliency limits the impact and scope of instability and cascading outages when they occur Western Electricity Coordinating Council

Adequate Level of Reliability The system’s facilities are protected from unacceptable damage by operating within facility ratings The system’s integrity can be restored promptly if compromised The system maintains the ability to supply the aggregate electric power and energy requirements of the electricity consumers at all times, taking into account scheduled and reasonably expected unscheduled outages of system components Western Electricity Coordinating Council

Western Electricity Coordinating Council JTA - RRT List RRTs are a subset of the “Task” list Review the entire Task list => Is it? company specific Real-time reliability-related Western Electricity Coordinating Council

Western Electricity Coordinating Council RRTs Is it a RRT? Rewrite or revise system operating procedures as requested As the incoming shift operator, gather all required information from system operator leaving the shift and by reviewing displays and logs Adjust transfers on major scheduling paths/transmission facilities to mitigate actual or potential threats to system reliability Western Electricity Coordinating Council

Western Electricity Coordinating Council RRTs Is it a RRT? Adjust short-term load forecast (same day) using actual load data and correction factors Prepare switching instructions for issuing and releasing equipment clearances or hot line holds Operate reactive devices as applicable to stay ahead of system voltage during daily load cycle Western Electricity Coordinating Council

Western Electricity Coordinating Council RRTs Is it a RRT? Implement manual load shedding as required to relieve IROL or SOL violations or other BES emergency condition Western Electricity Coordinating Council

Western Electricity Coordinating Council Summary Systematic Approach to Training (SAT) – Task Based Tasks are the individual foundational work activities of the overall System Operator job responsibilities Competency at performing tasks associated with a given position is required for overall job proficiency and maintenance of system reliability Western Electricity Coordinating Council

Western Electricity Coordinating Council Summary Task is a work activity that: Has a definite beginning and end Is measurable or observable Consists of two or more definite steps, and Leads to a desired outcome Western Electricity Coordinating Council

Western Electricity Coordinating Council Summary Task Statement? Narrative description of the task: Describes a given situation Describes actions to be taken by the SO Describes the desired outcome Measurable or Observable Western Electricity Coordinating Council

Western Electricity Coordinating Council Summary BES RRTs company-specific Real-time reliability-related PER-005-2 specifies the RC, BA, TOP, TO “shall create a list of Bulk Electric System (BES) company-specific Real-time reliability-related tasks based on a defined and documented methodology AKA RRTs RRTs are a subset of the “Task” list tasks RRTs are a subset of the “Task” list Western Electricity Coordinating Council

Western Electricity Coordinating Council Next… ADDIE Analysis Design Development A typical training plan in NERC employs the SAT process through the five step ADDIE training model: Analysis Design Development Implementation Evaluation Implementation Evaluation Western Electricity Coordinating Council

Western Electricity Coordinating Council Next… ADDIE Now that we’ve developed our BES company-specific Real-time reliability-related task list we have the foundational elements for completing the rest of the ADDIE process for our Training Program Western Electricity Coordinating Council

Western Electricity Coordinating Council Design Design Phase: Produces a training development plan that guides the creation of all training materials and teaching strategies Difficulty, Importance, Frequency (DIF) Analysis Skills and Knowledge Assessment (SKA) Expanding training program beyond the RRTs Now that we’ve developed our BES company-specific Real-time reliability-related task list we have the foundational elements for completing the rest of the ADDIE process for our Training Program Analysis Design – The training Design phase produces a training development plan that guides the creation of all training materials and teaching strategies. Framework to include DIF analysis is performed to determine where in the training program the information is placed Initial and/or continuing SKA performed to determine the training needs and desired outcomes Also consider non RRT related training to be included Customization of training program to meet individual needs Western Electricity Coordinating Council

Western Electricity Coordinating Council Design Design Phase: Learning objectives are written to clearly state the measurable performance the trainee shall demonstrate after training is completed Terminal Objective Enabling Objectives Western Electricity Coordinating Council

Western Electricity Coordinating Council Design Design Phase: Methods of delivering the training are selected during the design phase Teaching styles should, if possible, mimic real-world performance environments Example: Training for SO response to transmission congestion is ideally conducted using a dispatcher training simulator (DTS) that mimics the operation of the BES Western Electricity Coordinating Council

Western Electricity Coordinating Council Design Design Phase: Training methods to be considered include: Self-study instruction On-the-job Training (OJT) including site visits (ex: generating stations and substations) DTS exercises Classroom instruction eLearning (online) instruction Blended learning (combinations of above) Western Electricity Coordinating Council

Western Electricity Coordinating Council Develop Development Phase: All training materials are created using inputs from the Design phase Produces variations of the following training products: Now that we’ve developed our BES company-specific Real-time reliability-related task list we have the foundational elements for completing the rest of the ADDIE process for our Training Program Analysis Design Develop - During Development phase: All training materials are created using inputs from the Design phase Produces variations of the following training products: Classroom presentation materials for instructors & students Assigned Online learning activities and provider website access information Classroom presentation materials for instructors & students Assigned Online learning activities and provider website access information Western Electricity Coordinating Council

Western Electricity Coordinating Council Develop Development Phase: Self-study materials for students DTS exercise guides and evaluation materials OJT materials Student guides Checklists Qualification standards Site-visit check lists Western Electricity Coordinating Council

Western Electricity Coordinating Council Develop Development Phase: Initial and continuing training schedules Evaluation materials Course Instructor Lesson Evaluation forms Training record methods Attendance forms Course documentation requirements Western Electricity Coordinating Council

Western Electricity Coordinating Council Implement Implementation Phase: Training is delivered, and the trainee’s mastery of the learning objectives is assessed Delivery is based on written guidance documents (lesson plans, OJT guides, performance observation checklist, etc.) by approved and qualified training personnel Now that we’ve developed our BES company-specific Real-time reliability-related task list we have the foundational elements for completing the rest of the ADDIE process for our Training Program Analysis Design Develop Implement - Training is delivered, and the trainee’s mastery of the learning objectives is assessed Delivery is based on written guidance documents (lesson plans, OJT guides, performance observation checklist, etc.) by approved and qualified training personnel Western Electricity Coordinating Council

Western Electricity Coordinating Council Evaluate Evaluation Phase: Assists the Training Coordinator with determining both the strengths and weaknesses of the training Corrective action plans would then be developed to eliminate the weak links in the training Evaluate Analysis Design Develop Implement Evaluate - The Evaluation phase assists the Training Coordinator with determining both the strengths and weaknesses of the training Corrective action plans would then be developed to eliminate the weak links in the training The Training Coordinator conducts individual course evaluations as well as an annual program level evaluation for the entire training program The Training Coordinator conducts individual course evaluations as well as an annual program level evaluation for the entire training program Western Electricity Coordinating Council