Information related to auction premium

Slides:



Advertisements
Similar presentations
Stakeholder workshop on tariff aspects of the draft CAM network code Brussels – 19 July 2011 Introduction.
Advertisements

Update on EU Tariff Framework Guideline Richard Miller UNC Transmission Workgroup 03/10/2013.
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
2. EU Tariff Code – Emerging Issues. EU Tariff Code – ACER Feedback No.ACER Request/Issue 1Redefine Transmission Services Definition -Harmonised definition.
The big picture in the EU Managing conflicting objectives in tariff design Tom Maes, Vice-Chair CEER Gas Working Group Understanding the impact of regulatory.
MAIN PREMISES TO THE FINANCIAL SECURITY RULES USED BY THE GAS TRANSMISSION OPERATOR GAZ-SYSTEM S.A. IN TRANSMISSION CONTRACTS AND NETWORK CONNECTION AGREEMENTS.
EU Tariff Code Update 23 rd June EU Tariff Code Update – early feedback  Informal ACER feedback:  Draft code not on line with FG and insufficient.
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
1 Georgian National Energy And Water Supply Regulation Comission Power Losses Nugzar Beridze June 27-July 3, 2008.
Acquisition Of Business & Profit Prior To Incorporation
BGS-CIEP Rate - Energy Components (Continued)
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Update The Manual for near term investment procedures for (cross-
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Some of the best books of  &mid= A23D2FC75CD A23D2FC75CD7.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Increasing integration of variable RES-E: Policy and regulatory measures for T&D networks Luis Olmos Pontificia Comillas University Madrid / Spain
Chapter 10: Bonds Payable Non-Current Liabilities –Due more than one year from balance sheet date –Currently maturing bonds payable need to be transferred.
BALTIC ELECTRICITY MARKET MINIFORA Riga 3 July 2006 Transmission and connection to the grids Dace Bite Public Utilities Commission.
Philippine Feed-In Tariff System Implementation 1.
Chapter 24 Accounting for Accrued Revenue and Expenses.
Nominations PEA Meeting October Why ask for Nominations? In a common carriage system gas flows must be approved in advance to keep them within pipeline.
PLUS.
Renewable energy support schemes in the Republic of Moldova
Inventory settlements
Example for 1:n bundling with three TSOs
CRE Public Consultation on new exempt interconnectors
EU Tariffs Code Update Based on Refined Draft as of 30th October
Receivables LO 6 – Accounting for Notes Receivable.
RO-HU-AT - a pilot project for incremental capacity
NERSA presentation at the PPC meeting held on 24 May 2006
20th April 2016 Teleconference
Financial Area Representatives
26th IG meeting 23th January 2014
Direct lines - problem in Bulgaria
Further Information on MISO FTR Auctions
Background and Process
The Procedure & Principles of Awarding Distribution Tariffs
Transmission Workstream, 2nd March 06
Regulatory perspectives
Direct lines - problem in Bulgaria
20th April 2016 Teleconference
Direct lines - problem in Bulgaria
20th April 2016 Teleconference
24rd SG meeting 8th february 2018
The Accounting Cycle Continued: Preparing Worksheets and Financial Statements Chapter 4 2.
Insurance and pensions funds
Capacity Methodology Statements: Impact of Mod 452
Mod CMC_03_18 Unique circumstances may arise whereby the Transmission System Operator or Distribution System Operator requires additional time to formulate.
Capacity Methodology Statements
Barby Crabtree, Treasurer
Direct lines - problem in Bulgaria
Regulatory perspectives
Draft Capacity & Connection Plan
EU/GB Charging Project – Delivery Timescales
Parameters used on revenue aproval for period
Insurance and pensions funds
Denis Aitchison/Rob Hetherington
Additional Gemini API’s UK Link - Class 3 Modification
ERGEG comment to KEMA study on Art. 3 and 7
PRESENTATION TO THE SELECT COMMITTEE ON APPROPRIATIONS (SCOA) ON DEVOLUTION OF PROPERTY RATE FUNDS GRANT 12 OCTOBER 2010 Mr Joey Pillay.
Closing Entries and Corrective Entries
IFRS 15 - Revenue from Contracts with Customers
Adjustment for Prepaid Expenses
Information regarding the total revenue determined according to the provisions of Order no. 99/2018 of ANRE Chairman a) The total revenue allowed to be.
Group of NTS entry/exit points Types of gas transmission services
Indicators regarding the total revenue approved for the period October 2018 – September 2019 a) Total revenue approved by ANRE is allocated by the fix.
Information on accrual reconciliation account
Transmission service (approved tariffs) (approved tariffs) Variation
Presentation transcript:

Information related to auction premium According to the Methodology approved by Order 32/2012 of the ANRE President, `The tariff payable for the transmission services awarded by a capacity booking auction shall be the firm/interruptible capacity booking tariff, applicable when the capacity booked may be used, plus the auction premium`, and `Revenue obtained by applying the final tariff resulting following the auction, to be paid for the firm/interruptible booked capacity, represents the gas transmission revenue.` Therefore, the premium obtained after the auctions for the capacity booking products will be allocated to the regulatory account by the correction component of the total revenue and will be used for the adjustment of the total revenue of the following gas year. To sum up, the revenues obtained from the auction premium for capacity booking products within a gas year will be transferred to the network users in the following gas year.