Massimo Sacchetto Annalisa Trevisan CPT EXECUTED IN DIFFICULT CONDITIONS USING CPTWD AND FUTURE DEVELOPMENTS BRASIL September 2012 Porto De Galinhas.

Slides:



Advertisements
Similar presentations
Soil Exploration Part II
Advertisements

Cofferdam.
SITE INVESTIGATION.
Deep ExperienceLocal Focus Widest Range of TechnologiesBroad Customer BaseGrowth Platform Global Scale SEE goes north of the polar circle Christian Sigmund,
Washington D.C. 2nd-4th April 2006
The Seismic Dilatometer test (SDMT) in geotechnical inshore and offshore investigation Fino a qualche decennio fa le indagini geotecniche venivano eseguite.
Educational Resource Library
Soil Exploration (Explanation)
The standard penetration test (SPT) is an in-situ dynamic penetration test designed to provide information on the geotechnical.
CO2 Dragster Design.
Environmental Drilling By: Josh Humphreys October 8,2006.
Soil & Site Investigation
INTRODUCTION Session 1 – 2
Foundations and basements
GROUNDWATER CONTROL.
Project details • New headquarters for HKSB
Geotechnical Site Characterization by Cone Penetration Testing
Pressuremeters and other In Situ Testing Equipment
Drilling Methods Rotary rigs –Most-used method for deep production wells –Uses a fluid (mud, water or forced air) to carry drill cuttings to surface Hollow-stem.
Basic Coring Device: Components: Head Tube Cable Piston The Head attaches to the top of the tube. The piston is inside the tube and attaches to the cable.
  AN-najah National University Faculty of Engineering Civil engineering Department Prepared by: Eng. Imad A. F. Jarara’h. Submitted.
The Use of Full Flow Penetrometers in an Intermediate Soil; Silt By: Alan Abad & Mark Jones.
Pile Testing and Evaluation for the Sand Creek Byway, Sandpoint, Idaho Presented by Dean E. Harris, P.E., CH2M HILL.
Field Borings and Cone Penetration Testing
Bearing Capacity Theory
PILE FOUNDATION BY-.
Soils Investigation Soil Investigation
Site investigations and intrusive ground investigations
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
Soil and Rock Sampling. Environmental Site Characterization Number of samples taken depends on the size of the site Hollow stem auger normally used for.
SOIL EXPLORATION Module 1 -2K6 -March GCEK.
 Soil grains come from weathering of bedrock ◦ Physical weathering – granular soils ◦ Chemical weather – creates clay  Soil is either residual or transport.
TOPIC 2: TYPES OF FOUNDATION
Foundation Engineering CE 483
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
Geotechnical Exploration for Reach 2B of the San Joaquin River Restoration Program Nicholas Hightower Division of Engineering, Project Geology 2011 DWR.
Welcome To The Benton County Radio Operators Monthly Get Together.
Session 15 – 16 SHEET PILE STRUCTURES
Limit Load Analysis of suction anchors for cohesive materials By Dr Amir Rahim The CRISP Consortium Ltd/South Bank University 14 th CRISP User Group Meeting.
FHWA CPT Workshop Goal Assist DOT’s to start and increase use of CPT in Highway applications by developing, presenting and discussion information on CPT.
Drilling Interlocked O-Pile Walls with DTH + PPV FINLAND.
SITE INVESTIGATION.
Groundwater Water that soaks into the ground as it enters tiny air spaces in the soil and rocks.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
SITE INVESTIGATION ARUN MUCHHALA ENGINEERING COLLEGE-DHARI
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
Sardar Vallabhbhai Patel Institute Of Technology,Vasad.
FOUNDATIONS.
SOIL MECHANICS AND FOUNDATION ENGINEERING-III (CE 434)
Deep Replacement Presented by: M. Taromi
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
Settlement prediction for deep foundation piles using artificial neural networks Arshiya ABADKON1*, Muhammed Ernur AKINER1 1Bogazici University, Civil.
Chapter 6.  Moveable rigs include drilling barges, drill ships, jack-up rigs, and semisubmersible rigs.  Offshore rigs use a device called a top drive,
Site Investigation and Field Tests
Geotechnical Engineering II
Piling.
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
SUSTAINABLE DRILLING OF OIL & GAS WELLS
DARSHAN INSTITUTE OF ENGINEERING & TECHNOLOGY
Piezocone Penetration
INTRODUCTION A method of rotary drilling in rock, usually for exploratory purposes using hollow diamond-crowned bits to obtain a core for examination.
Content Introduction Salient Points Offset well Analysis
EROSION.
EROSION.
PAT GEOTECHNIC INTRODUCTION TO GEOTECHNICAL ENGINEERING.
Roger A. Failmezger, P.E., F. ASCE, D. GE
Graduation Project Bracing system for deep excavation.
Drilling Technology.
Presentation transcript:

Massimo Sacchetto Annalisa Trevisan CPT EXECUTED IN DIFFICULT CONDITIONS USING CPTWD AND FUTURE DEVELOPMENTS BRASIL September 2012 Porto De Galinhas

CPTWD: Cone Penetration Test While Drilling CPTWD stands for Cone Penetration Test While Drilling; it can be considered as an integration between: a standard CPTU, a wireline coring system, and sometimes the MWD (monitoring while drilling) The CPTWD allows to alternate CPTU strokes with sampling, coring, down-the-hole testing (i.e. SPT), and its possible to install geotechnical instrumentation (diameter of the hole 130 mm)

CPTWD However CPTWD is NOT a down-the-hole CPT system; basically its a standard piezocone with memory (its not possible to use with cable) which is embedded into a wireline corebarrel; the piezocone protrudes down the drill bit for 50 cm, so the CPTU data normally are not affected by rotation and pushing; of course the cone does not rotate thanks to bearings. Differently from down-the-hole systems the CPTWD is pushed by wireline rods and penetrates the soil as fast as the drillstring does. After the test is done or whatever is required to take a sample or if gravel/bedrock/not penetrable soil is encountered, the cone (the CPTWD corebarrel) is retrieved by a overshot driven by a cable (WIRELINE).

CPTWDCPTWD

1) CPTWD in very stiff soil carried out at very low rate of penetration A CPTu test was performed in a site (using CPTWD) where the stratigraphy is : from 0 to 13 m gravel, and from 13 m to 160 m very stiff SILT. In that site, after a pre-hole 13.4 m deep, we tried hard to push with both the CPTU cone and the Marchetti dilatometer standard methods without any result, no penetration at all also after having anchored the drillrig to the soil (like a penetrometer). Then we tried with CPTWD with extremely low RoP, and we were able to get continuous data from 17 to up to 30.5 m and we could have tested much deeper. NO PENETROMETER!! EXAMPLES

CPTWD IN VERY STIFF SOIL THE BLUE LINE IN Qc GRAPH SHOWS 30 MPa Qc=30 MPa Qc Fs UFr%

2) CPTWD carried out from FLOATING barge simply anchored to seabottom, with 8÷14 m water depth (Adriatic sea, Venice Mobile Dams Project) CASE HYSTORIES

CPTWD from floating barge

CPTWD from floating Barge It has been necessary to FILTER the graphs for taking away (as much as possible) the oscillations/fluctuations transmitted to the cone by the vertical movement of the barge and drillrig.

CPTWD in VENICE - DISSIPATION TEST - The small oscillations in the shape of the dissipation curve are probably due to waves !!

3) CPTu and SPT in the same hole (from floating pontoon) with alternate layers of penetrable soils and gravel It was available only a floating pontoon, anchored with piles in locations where the water depth in average was 12 m. For soil characterization we should have switched the penetrometer (for CPTU) and the drill rig (for coring and SPT) 4÷5 times each location. Since was not available the Jack-Up barge we decided to perform the tests with CPTWD using the available floating pontoon and a small drill rig (4 ton weight). Were carried out 2÷3 tests per day down to -35 m with single shift.

WATER depth 12,3 m CPTU CORING GRAVEL+SPT CPTU CORING GRAVEL+SPT CPTU bedrock

HEAVE COMPENSATION The aforementioned jobs were made with CPTWD in good weather conditions, with low heave or using a very big barge well anchored. The results show that the data might be affected by the vertical movement of the barge, even if the CPTWD system of pushing is much more flexible than the standard penetrometric pushing. For this reason we designed a simple system for HEAVE COMPENSATION which could be easily used with standard rigs (and penetrometers)

HEAVE COMPENSATION

NEW DEVELOPMENTS CPTU is not an universal test giving all the possible results, therefore we thought to widen the range of tests that would be carried out in the same hole, with the same drillrig, without changing the drillstring. Therefore we designed (and in some case made) special geotechnical and environmental wireline tools to be used with the same philosophy of CPTWD

NEW DEVELOPMENTS Wireline DILATOMETER Wireline VANE TEST Wireline PERMEAMETER Wireline WATER-SAMPLER AND PERMEAMETER Wireline thin wall Samplers (shelby and osterberg type)

USED IN VERY STIFF SILT Down to -180 m It is a wireline down-the- hole water well to be installed in a prehole

Wireline permeameter/sa mpler Its made up of a tube containing a under-vacuum vial connected to a filter; the bottom of the tube has an auger which penetrates the uncontaminated soil at the bottom of the hole; once the auger penetrated one meter the drillstring is pulled up and the filter is mechanically opened, so the vial starts to be filled. A pressostat on the top of the vial measures the variation of pressure versus time, so to get a permeability coefficient

WIRELINE SAMPLER-PERMEAMETER STEP 1: CLOSED

WIRELINE SAMPLER-PERMEAMETER STEP 2: OPEN

In CPT practise some problems occur when there are non-standard conditions, for example when reaction/ anchoring of the penetrometer is poor, when there are not penetrable layers, when friction on the whole length of the CPT-rods becomes high, when CPT tests have to be carried out from a floating barge/platforms, etc These problems can be overcome by using CPTWD, but only accepting a noticeable increase of difficulty with the execution of the tests. Actually performing CPTWD is not just a matter of anchoring the penetrometer and pushing, but its a combination of calibrating thrust, rotation and torque, water flow in the drillbit, flushing cuttings away in order to avoid the stuck of drillstring. CONCLUSIONS

In order to improve the use of CPT rigs and CPTWD equipment offshore we designed a relatively- simple reactive system which allows heave compensation and it could be applicable (as a matter of principle) with some adaptations to standard rigs. CONCLUSIONS

In addiction, almost any method of drilling and sampling could in theory be arranged with wireline; we already designed and/or already developed and tested a wide range of tools, among them: corebarrels for any kind of soil, samplers, deep groundwater sampler, permeameter, Vane Test, Flat dilatometer, etc. This developments could bring to an integrated all-purpose system where any tool (for testing, sampling, coring) can be considered as a plug-in, in order to get the widest range of data with the best cost/effect ratio. The development of such integrated system eventually with the possibility to work with a heave compensation would be a breakthrough expecially in nearshore and offshore geotechnical deep surveys. CONCLUSIONS

BRASIL September 2012 Porto De Galinhas