CResults / ERD confidential 2008 Smart-QC Demonstration by The Smart Choice for Lab Efficiency Management Platform.

Slides:



Advertisements
Similar presentations
Mercury Quality Center 9.0 Training Material
Advertisements

Tivoli Software from IBM Storage Resource Management Webcast
Manager Self Service August 2010 InSITE Self Service Manager Self Service Presentation This presentation is approximately 10 minutes in length. This.
E2 Management Suite Employee Scheduling & Sales Forecasting
“The Honeywell Web-based Corrective Action Solution”
A Producer’s Guide to Chubb’s SMART Application Platform
Easy to use Ability to attach policies/procedures to call types Ability to schedule calls in advance Officer safety alerts Robust search capabilities.
Intracompany Stock Transfer Scenario Overview
An Overview of IBM Cognos 8 BI John Saldua Sr. Director, Management Reporting and Administrative Systems.
Individual Learning Plan for Kentucky. Background: Data Integration State-wide unique student identifiers are used to link information from a number of.
HP Quality Center Overview.
What is the Cyberlead AdPosting? The Cyberlead AdPosting places your inventory on highly trafficked sites and search engines GoogleBase, Facebook, Craigslist,
Key Considerations for Report Generation & Customization Richard Wzorek Director, Production IT Confidential © Almac Group 2012.
GPS Tracking & Inventory Management GPS Tracking & Inventory Management Presented by: Product Activation Group.
IStateLink 3.0 Help and Training Tutorial December 2010.
SharePoint 2010 Business Intelligence Module 3: Business Intelligence Center.
Lawson System Foundation 9.0
Confidential Crisis Management Innovations, LLC. CMI CrisisPad TM Product Overview Copyright © 2011, Crisis Management Innovations, LLC. All Rights Reserved.
Student Success Plan for Delaware. SSP Homepage The SSP Homepage is the central point from which students can access all of the features and functions.
EPM Live – Positioning for Enterprise Project Management Presented by: Sasha Lomas, PMP ASL InfoTech inc. March 3, 2010.
2 © 2005 OSIsoft, Inc. – Company Confidential Nicoletta Aloi - IPLOM Massimo Galli – Pimsoft.
The Microsoft Office 2007 Enterprise Project Management Solution:
Primavera Highlights During COLLABORATE  Primavera Key Note: Making the Most of Your Oracle Primavera Investment Dick Faris, Primavera Co-Founder & Oracle.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
1 NEW Integrated Effort Management Tool. Intranet Users  Internet Users 
BIOTECH SUPPLY October 8-9, 2012 Crowne Plaza, Foster City, CA Solving the Missing Link Between Forecasting and ERP in Clinical Supply Optimization Michelle.
EDU MANAGER Presented By : us at :
Sri Lanka Institute of Information Technology Software Engineering Project – I Clone of Rally GROUP NO : WD-SEP-002 | PROJECT NO :25 PROJECT : CLONE OF.
Energy Management System Industrial Controls & Drives (India) Private Limited Chennai
Business Intelligence (BI) Primer BI Tools in SharePoint 2010 Excel Services Performance Point Services.
Ashley Hawley. Project Description Business Need User Profiles Development Technology Testing Plan Deliverables Demonstration Conclusion.
MERCURY BUSINESS PROCESS TESTING. AGENDA  Objective  What is Business Process Testing  Business Components  Defining Requirements  Creation of Business.
Introduction – Addressing Business Challenges Microsoft® Business Intelligence Solutions.
Metricus Metricus at a Glance Clarity on the performance of IT
WasteWORKS for Containers The power of WasteWORKS in a system specifically designed to manage your roll-off business.
Cerion Optimization Services, Inc Dallas Parkway, Suite 404 Frisco, TX USA Optimiser TM Product Introduction This.
Project Portfolio Management Business Priorities Presentation.
WebScan Change Order. WebScan change order: What is it? Beginning in 2010 changes to a WebScan order will need to be submitted via a WebScan change order.
Confidential Web Ordering Overview. Confidential LOG ON:   Enter your login name &
Transportation Planning EIN 5346 Enterprise Systems Optimization Fall, 2015.
Registration Solutions for your Event Management.
== Enovatio Delivers a Scalable Project Management Solution Minus Large Upfront Infrastructure Costs, Thanks to the Powerful Microsoft Azure Platform MICROSOFT.
HP PPM Center release 8 Helping IT answer the tough questions
Programming Problem Presentation Sport Complex Booking System.
QC – User Interface QUALITY CENTER. QC – Testing Process QC testing process includes four phases: Specifying Requirements Specifying Requirements Planning.
Cognos 8: Software for Management Information System.
AXUG Partner Showcase – Introducing Preactor
HP SmartStream Production Center
Test Lab Management and
Introduction to the new robust security system from SCC.
Project Management: Messages
Software Application Overview
Workforce Management Software Suite
Intracompany Stock Transfer Scenario Overview
Lawson System Foundation 9.0
Quality Assurance System Field Service Automation
Intracompany Stock Transfer Scenario Overview
WELCOME Advanced FAST.
State System Analytics Platform
iCIMS 16.3 Release: Highlights
Release Highlights Last Updated for September Monthly Release.
What You Don’t Know About the QAD Learning Center
MyInstitution.Net Institutional Information Management System
Intracompany Stock Transfer Scenario Overview
Quality Assurance System Field Service Automation
BCS Template Presentation February 22, 2018
CAD DESK PRIMAVERA PRESENTATION.
Stability Management Software
COMPANY PATH NAME Windows Application Software Providing worlds best Pathology Management or Laboratory Management software.
Presentation transcript:

cResults / ERD confidential 2008 Smart-QC Demonstration by The Smart Choice for Lab Efficiency Management Platform

cResults / ERD confidential The most robust platform for QC Laboratories: Resource Planning and Test Allocation for analysts / instruments across various laboratories. by Smart-QC The Smart Choice for Lab Efficiency Management Platform Managing Your Labs Resources and Overall Efficiency Robust capacity planning for both analysts and instruments Test allocation provides a platform to deliver daily test allocation to analysts across various laboratories

cResults / ERD confidential Smart-QC Introduction Smart-QC provides a critical management tool that will be used as a foundation and efficient infrastructure for long- term strategic planning and growth. The objective is to implement a proactive resources planning and scheduling application to effectively manage the dynamic and complex QC environment. Other Smart-QC Key benefits: Identify the required analyst and instruments for each work-center for given forecasted demands Determine cost per product/sample/test Determine value added vs. non-value added Predict expected backlog and react accordingly Optimize the campaign size for major assays Provide meaningful key performance indicators Balance capacity based on given demands to reduce overtime and waste

cResults / ERD confidential Login to Smart-QC via internet/Intranet, by typing user name, password and site id. Login to Smart-QC

cResults / ERD confidential Smart-QC Modules Use the Scheduling Module for an efficient and effective scheduling of the complex labs operation balancing the analysts work load, samples cycle time, and on-time delivery to meet customer service needs Easily set parameters and entities to set standards in the admin module to ensure consistent results from staff. High level summary of efficiency and compliance performance built into an executive dashboard. Lets explore the Planning and Scheduling Modules. Use the Planning Module to identify the required analysts and instruments for each work-center for given forecasted demands, determine value added vs. non-value added, predict expected backlog, optimize the campaign size, provide meaningful KPIs, and balance capacity based on given demands to reduce overtime and waste

cResults / ERD confidential Planning Module Tests, Products, Standards and Resource Availabilities and Activities parameters are defined here so instrument and resource requirements can be calculated using the Samples Forecast input.

cResults / ERD confidential Reporting Tab provides the user with an easy-to-use tool to retrieve resource requirements information (quantity, hours, etc.) meeting a specific set of user defined criteria. Reporting

cResults / ERD confidential Choose report desired and filter for search criteria to review specific data quickly. Glance at data by selecting a single or multiple periods for trends, comparisons, load balancing. Reporting

cResults / ERD confidential Reporting Over 40 reports templates are available in Smart-QC. Required Vs. Available Resources By Period

cResults / ERD confidential Reporting Resource Time Distribution by Workcenter and Resource Smart-QC offers a variety of line charts, pie charts, stacked bar charts, and text reports.

cResults / ERD confidential Reporting Test Activity Time By Workcenter and Resource

cResults / ERD confidential 2. Batch Creation 3. Batch Assignment 4. Test Schedule 1. Sample List Smart-QC: Scheduling Smart-QC provides a 4 step process which ensures an efficient and effective scheduling of the complex labs operation. It helps balance the analysts work load, samples cycle time, and on-time delivery to meet customer service needs. Scheduling

cResults / ERD confidential 1. Sample List The Sample List allows the user to view all incoming samples and their corresponding due dates and assays. Also, high priority samples can be flagged from this screen.

cResults / ERD confidential 2. Batch Creation The Batch Creation Step allows the user to both automatically and manually create batches. Automatically created batches can be manipulated and all created batches can be locked or unlocked for flexibility.

cResults / ERD confidential 3. Batch Assignment Batch Assignment By Sample Step allows the user to order samples by their priority or their sample IDs and to do the following: assign batches automatically or manually, re-assign batches, withhold or release the remaining time available per analyst.

cResults / ERD confidential 4. Test Schedule In the Test Schedule screen, users will be able to do the following: view batches assigned to an analyst, stamp start or finish of a test, hand over a test to another analyst, Repeat samples – send back samples that need retesting to the Batch Creation step to be batched with existing or new batches.

cResults / ERD confidential THANK YOU Web Site: cResults Web Site: Contact Info: Rafi Maslaton; ext. 250 Case Study