F Duval, on behalf of EN/EL

Slides:



Advertisements
Similar presentations
ADVANCED MANAGEMENT OF A CLOSED RING OPERATED MV NETWORK: ENEL DISTRIBUZIONE’S P4 PROJECT. Simone Botton, Roberto Calone, Luigi D’Orazio, Alessandro Fatica,
Advertisements

Central Research Institute of Electric Power Industry D2-01_24 Prototype and Evaluation of Communication Network for a WAMPAC System Based on International.
 E4 Electrical Installation #1 Power Distribution.
Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
112/06/2012. Summary  Network infrastructure consolidation & upgrade 66 kV et 18 kV  UPS SILCON replacement project  Projects and maintenance work.
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
E951 POWER SUPPLY SAFETY REVIEW 9/06/02 IOANNIS MARNERIS Brookhaven National Labs.
Advanced Protective Relaying Based on Rogowski Coil Current Sensors
Circuits Series and Parallel. Series Circuits Example: A 6.00 Ω resistor and a 3.00 Ω resistor are connected in series with a 12.0 V battery. Determine.
Preliminary Studies of the Electric Power Distribution for CLIC
D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on.
17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)
Fault Level Monitor Ken Lennon LCNF Conference 25 th October 2012.
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
All rights reserved Gas-insulated Switchgear (GIS)
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
All rights reserved MV SWITCHGEAR.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
Active Safety Systems + EHN1: Draft EN/EL proposal for replacement of Nano PLC 1.Current situation 2.Requirements definition 3.Current solutions (Atlas/CMS)
How to achieve higher redundancy of the UPS for QPS ? -The lack of redundancy concerns the supply lines from UPS to consumer but equally parts of the UPS.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Circuits and Electronics Midway in Chapter 2 Resistor Combinations.
MV Network Operation and Control Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Distribution network fault on LHC1 10/07/2011 F Duval, G Cumer on behalf of EN/EL 10/07/11.
POWER HOUSE.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Power Quality Karsten KAHLE Electric Power Converter Group (TE-EPC) High Power Converter Section Review of CERN’s Electrical Power Network October.
Status 100% 30% 100% STATUS REPORT on Electromagnetical Perturbations on the Hardwired Safety Alarms  The investigations to understand the causes of hardwired.
3.TRANSISTOR CIRCUIT CONFIGURATION
Static Var Compensator Status (SVCs for Booster and SPS) Situation in 2009 Karsten KAHLE, TE-EPC ATOP days March 2009.
ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13 Barcelona May Question 7 (7.1) Instrument X V = 1 p.u. Instrument YV = 1.043p.u. Error = 4.3%
Distribution Systems-General
ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
1 Industrial Systems BUS2000 Busbar Differential Protection System Differential overcurrent system with percentage restraint protection.
Follow-up meeting of the Administrative Agreement between FCT and CERN for the on-the- job training of Portuguese technical graduates Tiago André Soares.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
Frankfurt (Germany), 6-9 June 2011 Romanens – CH – S3 – 0220 Impact of Distributed Generation on Grid Protection BKW FMB Energie AG Switzerland Florian.
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
Equipment 1.Circuit Breaker. 3.Fuses. 4.Protecti- ve relay.2.Bus bar. TYPES OF SWITCH GEAR EQUIPMENT:-
Example 4.10 Finding the Thevenin equivalent of a circuit with a dependent source.
E4 Electrical Installation
YETS & LS2 Works EN-EL / Power distribution
Situation of the Static Var Compensators at CERN.
Electricity is produced at the power station.
EYETS Works EN-EL [ FC excluded ]
YETS & LS2 Works EN-El on LHC / Power distribution
Power Generation and Distribution
SINGLE LINE DIAGRAM.
the high-voltage network of CERN ToMORROW
LV Safe Powering from UPS to Clients
the CERN Electrical network protection system
YETS & LS2 Works EN-EL / Power distribution
E4 Electrical Installation
F Duval, on behalf of EN/EL
Business opportunities related to CERN electrical network
Power cut 18kV cable for EMD404/E9 is heating
Click to Continue to Calculator window
Thevenin and Norton Equivalents
Errecting TMS-580 Control room CT /-PT Platform.

CIRCUIT BREAKERS E. Chikuni. Circuit Breakers Mechanical Switches capable of making and breaking currents under normal circuit conditions and for a specified.
Chapter 20 Capacitors in Series and Parallel
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

F Duval, on behalf of EN/EL Major Event on 15/01/2013 EL Report 8:30 meeting 16/01/2011 F Duval, on behalf of EN/EL January 16th 2013 F.Duval - 8.30 Meeting

network configuration event at 8:27 January 14th 2013 F.Duval - 8.30 Meeting

network configuration event at 8:27 Voltage drop: 100% in the Meyrin west area for 30 minutes 80% in the rest of Meyrin + LHC18 + LHC1 for 300mS 25% in the rest of CERN for 300mS January 14th 2013 F.Duval - 8.30 Meeting

Substation ME59 cubicle EMD210 cables + CB compartments January 14th 2013 F.Duval - 8.30 Meeting

DETAILS INSIDE CUBICLE Busbar Upstream CT Circuit Breaker Downstream CT VT Cable Terminal

Recovery Network reconfigured at 08:58 (30 minutes) ME59 fed from one cable only; ME59 replacement is part of our consolidation plan for 2013, the cable link will be repaired and connected to the new substation (in 03 or 04/2013) January 14th 2013 F.Duval - 8.30 Meeting