Friday 25 bunch fill dumped just before (BLM in 5)

Slides:



Advertisements
Similar presentations
Mo morning set up 228 bunch injection (36 bunch trains), ramp, squeeze, collisions h luminosity (depending on experiments) ATLAS length scale calibration.
Advertisements

Friday 23 rd November - morning Coming out of loss maps over night Thu – Fri  in shadow of MKD problem in SPS (and CMS cryo recovery) 07:35 Start pre-cycle.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Tuesday 3 rd May 7:30 Access in the SPS to replace injection kicker magnet terminating resistor after radiation cool down overnight 9:45 probes injected.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
LHC Status Fri Morning 3-June
Wednesday
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Monday 11/07: Recovery Plenty of accesses.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Tuesday 22nd January - morning
Monday 6th August & night
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary week 30 Week 30 R. Bailey & J. Wenninger
LHC commissioning Week 38
Bernhard Holzer, Joerg Wenninger
LHC Morning Meeting - G. Arduini
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Thursday 10th May - morning
LHC Status Sun Morning 20-Mai
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Week 35 – Technical Stop and Restart
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
(on behalf of the LHC team)
Wednesday 10/5 Cryo recovery until 18:30
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Saturday Nov Stop proton operation. Switch back to ions
Thursday – Morning Energy matching at injection with H CODs
Programme for Friday 9 July
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Thursday 22 September 2011.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Tuesday In the morning test cycle with probe for Q’ measurement.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
LHC Status Fro Morning 9-Sep
Thursday
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
Injection Studies: 50 ns ABT/BTP.
Thursday 20th July - morning
Monday 10th December - morning
Monday 27th August & night
Wednesday morning / afternoon
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Daniel, Gianluca and Belen (for the Collimator team)
Presentation transcript:

Friday 25 bunch fill dumped just before 08.00 (BLM in 5) Morning and early afternoon Multibunch injection studies (Beam 1) Multibunch scheme operational by 15.00 Late afternoon Fill for physics with 25 on 25 from 15.00 Lost after squeeze around 17.00 – procedural problem Try again – settings management issues end of squeeze – fixed Collisions ~ 23.00 – some losses at start Issues with lumi scans – fixed Stable physics through the night Weekend Physics running with 25 on 25 2/25/2019 LHC status

Friday Note that we now have 2 TCDIH in TI2 with +/-5 sigma gaps, instead of nominal +/-4.5 sig. ******************************************** *** OK for MAXIMUM 5e11 p+ per injection *** ******************************************** until full verification of protection settings is made. 2/25/2019 LHC status

Fill 1251 In the attached plots, the following color coding is used: - black for witness bunches (zero collisions); - red for bunches colliding in IP 1 5 and 2 (3 collisions); - blue for bunches colliding in IP 1 5 and 8 (3 collisions); - green for bunches colliding in IP 2 and 8 (2 collisions). 2/25/2019 LHC status

Fill 1253 In the attached plots, the following color coding is used: - black for witness bunches (zero collisions); - red for bunches colliding in IP 1 5 and 2 (3 collisions); - blue for bunches colliding in IP 1 5 and 8 (3 collisions); - green for bunches colliding in IP 2 and 8 (2 collisions). 2/25/2019 LHC status

Interventions needed Magnetic probes in the machine for the studies related to the hump - access would be required in point 5 (GA, LW) 2 hours in the shadow 2/25/2019 LHC status