OEM installation check with CAD models for ISL/QSL CC option for coolant lines for D phase release – CC9323 Date- 13th Feb 2017.

Slides:



Advertisements
Similar presentations
EDS – F1 Drink System Information
Advertisements

Engineer Training XL1200 Ink System. Engineer Training XL1200 Ink System Confidential 2 Ink System The XL1200 Ink System consists of the following elements:
 Air! A pneumatic assembly is one that converts energy stored in compressed air to mechanical energy. Electrical Energy Compressed air Mechanical force.
1 Hose and Lines. 2 High side / low side System with an expansion valve High SideLow Side Condenser Evaporator Receiver/Drier Compressor Expansion valve.
School of Occupational & Environmental Hygiene Evaluation of a new mask and scavenging system for nitrous oxide used in labour and delivery Emission Control.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
For the interconnection of pneumatic components and systems
Equipment Familiarization Amatrol 850 Basic Hydraulic Training System
Instrumentation Developments in Stream Switch Valve Technology Steve Doe, Parker Hannifin Corporation.
Settings & Adjustments. Settings & Adjustments.
DS/ Product Range – PKI Welding Torches Process Product Range Product Range – PKI Welding Torches.
PAL WIRE-TO-WIRE CONNECTOR SERIES Purpose: To introduce the PAL wire-to-wire connector series.
1 Skill Drill 2-7 Donning a Face Piece Step 1: Fully extend the straps on the face piece. Step 2: Place your chin in the chin pocket. 2 Step 3: Fit the.
EMISSION PROBE PARTS TUBE: 3/8” OD x wall Stainless Steel Length determined by pipe diameter and placement of connecting end to allow easy connection.
COOLING SYSTEM IN IC ENGINES
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Phase 1 FPIX cooling tubes routing in HC Kirk Arndt - Purdue124 April 2012.
+ Engine Magnetti Marelli + Engine reliability + Ohlins suspension and support Strong points in 2005.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
Compressor Replacement – ODU
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 Engine Mechanical Labs R. Bortignon. 2 Repair Information – essential! locate model number!
Cleaning Critical Orifice and Focusing Nozzle
The Cooling System (Reasons for)
AfterSalesTraining Welcome to AfterSalesTraining.
Pipe specials.
Diesel Technology Fittings/ Hoses.
Single Module Vertical Outlet Tube Change
Automotive Engines Theory and Servicing
Automotive Heating And Air Conditioning
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
Automotive Engines Theory and Servicing
COMPRESSED AIR PRODUCTION USING VEHICLE SUSPENSOR for PNEUMATIC BRAKING SYSTEM with INTELLIGENT BRAKING APPLICATION(SEMI- AUTOMATED) BY VIDYAPUTRA.
New Turbocharger Plumbing Oil Drain Connection for QSB6.7 T3
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
update on UT cooling system
Cummins QSK60 Tier II Installation Impact
C Air Compressor Up-fit and Plumbing Guide For LDI B3
Info. For CEAF Heated Breather Tube Change Engines: QSB4. 5/6
Changing the orientation of the adjusting link within CF Options to resolve interference issue Options Impacted: CF , CF , CF , CF ,
VPCR CEAF César F. Demarchi March, 22nd 2017.
Information To support CEAF Obsoleting Grid Heaters with Heater Control Modules for B Tier 1 and Tier 2 Options: AH9044, AH9083, AH9084, AH9122, & AH9128.
Information to Support CEAF: ISL Euro3 WWCP V Software Update
For the interconnection of pneumatic components and systems
Implementation of bolt spacers to the oil cooler hardware
2017 X15 EH Bracket Machining Change
Information To support CEAF Notification of proposal to modify the orientation of the , CLAMP, V BAND that is used in XS9693 on 6 cylinder automotive.
Information to support CEAF Notification of approval of new assembly line at the suppliers Chinese manufacturing location for the , COMPRESSOR,
LP fuel lines redesign on ISX15 engines Date- 6th Sep 2017
Off-Highway Diagnostic Improvement Project
Addition of MCRS low pressure fuel pump pressure relief valve for QSK38/50/60 Kelle Ravn May 20th 2015 (Changed “check valve” in May 18th version to “pressure.
Mounting Zone Edge and Profile Tolerance Change on EPA2017 Inlets
Compressor Cabinet Design & Interface Diane Hascall Integration Engineer Joint Technical Meeting 2017 March 6, 2017.
LP fuel lines redesign on ISX15 engines Date- 6th Sep 2017
OEM installation check with REV_03 CAD models for ISL CC option for coolant lines for D phase release Date- 26th Aug 2016.
OEM installation check for ISL/QSL CC9293 for coolant lines reroute with quick disconnect Date- 16th Feb 2017.
Industry Shipperless & Unregistered Working Group
Project Scope Change Summary: Processing change at RMEP to close draincock P/N S923E on all L series engines Background: Customers have requested that.
L9 and B6.7 Component ID Change All options - D313029BX03 (B 2017) All options - D563025BX03 (L 2017) Mike Langevin 3/9/2017.
LP fuel lines redesign on ISX15 engines Date- 4th Aug 2017
Automotive Engines Theory and Servicing
Automotive Engines Theory and Servicing
LP fuel lines redesign on ISX12 engines Date- 6th Sep 2017
Presentation transcript:

OEM installation check with CAD models for ISL/QSL CC option for coolant lines for D phase release – CC9323 Date- 13th Feb 2017

Project Scope Change Summary: Implementation Strategy and Date: The CPR coolant lines on L series engines are being converted from rigid tubes to nylon tubes. The diameter of the supply & return tubes was modified from existing 10.92mm to 14mm to meet the flow requirements of air compressor The basic routing of the lines is same. Supply from the block & return to cylinder head. The new design has swivel connector at one end and quick disconnects on the other.PA12 hose would be used which will attach to both the connector ends Implementation Strategy and Date: Take a new option & obsolete the existing options Implement by: End of this year: 31-Dec-2017

Feedback Requested – CC9323 Existing CC 9323 (Highlighted in Yellow) Are there any issues with the proposed plumbing design?

Overlay of New option & Old option CC 9323 Existing option : with rigid lines Supply-from block Return- To cylinder head New option : with quick disconnects Supply-from block Return- To cylinder head Connectors used are Swivel type with barb end form

Swivel nut on the fitting which connects with ORFS face of the end fitting connecting to block/head Barb end form with serrations on the end of the fitting which fits with the PA12 hose

Integration on Engine: Routed over Flywheel Housing New option : with quick disconnects Existing option : with rigid lines