WRC-19
REGIONAL PREPARATIONS An overview
CONFERENCE PREPARATORY REPORT and CPM19-2 Draft CPM nearing completion. 2nd ITU Inter-regional Workshop on WRC-19 Preparation 20 to 22 November 2018 Final deadline for contributions 4 February 2019 CPM19-2 will be held in the International Conference Centre of Geneva (CICG) 18 to 28 February 2019
Commonwealth nations play vital role in Regional preparations
Taking into account ITU-R studies Some Study Groups still have meetings before CPM19-2 Working Parties of SG 1, 5, 6 and 7 have meetings planned September 18 to February 19 WP5D (IMT Systems) is the last planned ITU-R WP meeting 11 to 15 February 2019 This highlights the importance of IMT – related Agenda Items.
Regional Meetings 3rd APM-19: 17-21 September 2018, Cairo, Egypt 27 – 30 November 2018, Hilversum, Netherlands 5th RCC WG WRC-19/RA-19: 13-15 March 2018 (video conference) 12th RCC Commission on RFS and SO: 13-15 Sep. 2017, Samarkand, Uzbekistan (Republic of) 4th RCC WG WRC-19/RA-19: 11-14 Sep. 2017, Samarkand, Uzbekistan
THE KEY WRC-19 AGENDA ITEM 24.25-27.5 GHz 37- 43.5 GHz with Regional differences (USA: 37 – 40 GHz Europe: 40.5 – 43.5 GHz) 45.5-52.6 GHz 66 – 71 GHz 71 – 76 GHz Source: ETNO
SPECTRUM MAY BE MADE AVAILABLE FOR EMERGING PICTURE >20 GHz SPECTRUM MAY BE MADE AVAILABLE FOR IMT-2020 / 5G AT WRC-19
5G / IMT-2020 and Satellite Services Need sustainable spectrum access for both satellite and terrestrial services. Satellite and terrestrial together will make 5G happen
FOR SATELLITE Does IMT-2020 / 5G terrestrial really need >20GHz of additional spectrum?
Value of satellite communications Vital to continuity and growth of civil and military broadband communications
GOING THE EXTRA MILE