Tuesday morning 08:30-09:00 Squeeze with probe.

Slides:



Advertisements
Similar presentations
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Advertisements

Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
● Morning: – Squeeze and collide. – Smooth, orbit rather well under control (max. excursion ~ 0.2 mm at TCT, roughly sigma). Orbit evolution at the.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Day :00-11:30: Optics at 3.5 TeV Optics re-measured with AC-dipole. Excellent reproducibility. Small emittance increase from AC-dipole. Collapsed.
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Wednesday 21 March 2012.
Friday 30th September 06:00 Operator dump fill #2171, int. lumi about 75 pb-1 Previous operator dump from physics was on 14 September ! 07:00 Start of.
Summary of week 7 Hardware Commissioning:
A/N 26 16:00 Access finished problem with the BLM test. one crate is failing the beam permit test. Fixed. Access required in sector 78 for QPS to fix a.
Monday 11/07: Recovery Plenty of accesses.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Summary week 31 Week 31 G. Arduini & O. Brüning
Monday morning 08:30 Start of rephasing MD. Dry tests in the morning.
Thursday morning – optics correction
Tuesday TOTEM and transverse loss map (1) OK
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Monday – recovery from MKI flashover
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
LHC commissioning Week 38
Thursday morning 09:30 Dump of pPb fill.
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 36 plan Todo’s: And also: 12+b injection.
Saturday 4.12 Beam in the SPS at 09:30 Beam in the LHC at 10:00
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
Week 35 – Technical Stop and Restart
Monday Morning – recovery from cryo.
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
LHC Morning Meeting - G. Arduini
Friday Morning 7:30 injection for fill 2908
Sunday
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Wednesday 03/11 – The Plan Finish electron-cloud program:
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
Friday 23rd March 08:00 Access
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Thursday 17/3 Morning: evaluation of the origin of the timing problem occurred over night and the implication on machine protection 09:00 – 12:00 Dry ramp.
Monday :00 – 15:00 : Stable beams 15:30 : Recover…
Saturday :42 stable beams fill 3541
Friday morning 08:00 Stable beams with 840b.
LHC Morning Meeting - G. Arduini
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
LHC Status Fro Morning 9-Sep
Thursday
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Tuesday – Morning and Evening
RAMP FOR COLLIMATOR SETUP
Wednesday morning / afternoon
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Presentation transcript:

Tuesday morning 08:30-09:00 Squeeze with probe. Very nice and stable orbit – only one ‘spiky’ excursion in the fist part of the squeeze. New parabolic rounding of correctors involved in Xing and separation bumps seems to pay off. Small RT corrections after a few iterations of feed-forward (each at the level of ~60%). Trim by hand 610 out of 925 seconds 2/25/2019 LHC 8:30 meeting

Morning - access 09:00 Just as we wanted to move to collisions, beam dump from access system in Pt8 – shielding wall seen open. Beam gone, 3 sectors OFF from SIS access interlock. Investigation by GS – problem was traced to a cable fault inside a LASS rack. During the investigations, lost all patrols in Pt8. EIS Pt8 seen in bad state during repair  no access possible in the ring. 13:00 New dry test of 90 m un-squeeze. Trip of Q4.R5. Have to lengthen the functions a bit more… 14:00 Machine patrolled. Many thanks to EN/MEF for help with the patrols ! 2/25/2019 LHC 8:30 meeting

Afternoon 15:00 Another access in Pt6 for vacuum (pressure sensor). Pre-cycle, beam back just before 18:00. 18:00: TCDQ angular alignment. Not minimum found for B2 on angle. Decide to remain with ‘0’ angle. B1 TCDQ angle -60 urad, compatible with -100 urad found previously. Apply -100 urad angle. >> new function needed and test ramp. 22:00 TCDI validation prepared ( tonight). Calibration of losses behind collimators. 2/25/2019 LHC 8:30 meeting

Night 23:00 Test ramp and squeeze dumped in ramp – lost S56 & S67, Valves closed, LBDS off due to 400V problem in UA63/67. Cause of trip is not understood. 00:40 400 V back, switching on again. 02:00 Problem with TCSGs in Pt6 – lost steps. STI piquet could reset. 03:30 Ramp finally starting… 04:00 Beam lost in the squeeze, apparently on TCTs in IR8 – collimator functions? Worse than before when the collimator were left in place. 2/25/2019 LHC 8:30 meeting

We can do better.. 2/25/2019 LHC 8:30 meeting

Squeeze 2/25/2019 LHC 8:30 meeting

Losses start ~6m (IR1/5), become massive ~3m (IR1/5) 2/25/2019 LHC 8:30 meeting

Early morning 05:40 S78 trip. Cause unclear… Access needed to restore communication to QPS controller. Next: Collimator setup at 4 TeV (evening) Injection protection validation (night) Thursday: collisions with nominal bunch – only after squeeze problem is understood (another test with probe). 2/25/2019 LHC 8:30 meeting