Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

Beam expected in the afternoon PM: – Establish first-turn – Establish closed orbit – Rough correction of machine parameters Evening: – RF capture Night:
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
LHC Beam Commissioning Meeting V. Kain & R. Alemany
Ion Commissioning: Thursday & Friday
Wednesday 8.9 External crossing angles:
LHC Commissioning with Beam
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Friday 15th June 01:11 Injection.
Wednesday 21 March 2012.
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday 21st January & night
Summary of week 7 Hardware Commissioning:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Operation Week 41 Coordination G.Arduini, M. Lamont
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Machine availability reaching well over 80%
Saturday 1.3 e32 Overnight Morning
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Monday – recovery from MKI flashover
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
LHC Injection and Dump Protection
Lost at 12:05 to power converter (RTQX2.R1) problem
Friday 31st August & night
Friday 14th December - morning
Monday Morning – recovery from cryo.
Thursday :00: Physics fill from the night shift
Wire almost entirely through beam before BLM triggers dump
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Summary Thursday h21: Stable beams fill #1303.
Thursday morning 7:20 – 12:30 faults of BLM sanity check, RQX.L8 QPS trip and iris scanner in UJ47. Access: Pt 8 for ELQA on RQX.L8 (The voltage.
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 24 October hours of 25ns MD
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Saturday 3rd November - morning
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Programme for Friday 9 July
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Tuesday In the morning test cycle with probe for Q’ measurement.
Wednesday 23/2 Thanks CRYO!!!.
Thursday
Saturday 24 September 2011.
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Thursday Morning/Afternoon
Wednesday 26 October 2011.
Wednesday morning / afternoon
Wednesday morning Waiting for PS – problem on RF cavity.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Thursday 10:00 Fill 1986 in stable beams.
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Daniel, Gianluca and Belen (for the Collimator team)
HI2011 Commissioning Status
Presentation transcript:

Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks: Mostly for BI for BPMs and ion changes ALICE, CMS Pre-cycle Proton checks: BCT calibration with ~15 probe bunches BPM orbit reference for high sensitivity setting 05/11/2010 LHC 8:30 meeting

Thursday PM – ions in the lines 18:00 : Ions extracted to TI2/8 TEDs. A bit of steering of the trajectories. No problems. B1 in TI2 before correction (wrt proton reference) 05/11/2010 LHC 8:30 meeting

Thursday PM – ions to the LHC Adjustment of the offsets LHC-SPS to place ions bunch on the MKI of B1. 20:20 First 75+ trajectories in the LHC. B1 turn 1 compared to proton closed orbit – not bad !! 05/11/2010 LHC 8:30 meeting

Circulating B1 20:30-22:00 RF : placing bunch into correct bucket. BLM thresholds on IR2 triplet magnets set back to 0.1 (were reduced to 0.03) to avoid unnecessary PMs from beam to TDI. 22:00 B1 captured and circulating for many seconds. B1 ion orbit compared to proton orbit – no steering ! 05/11/2010 LHC 8:30 meeting

B1 progress 05/11/2010 LHC 8:30 meeting

Beam2 01:00: Beam2 injected OK. 01:50: Both beams circulating. Lifetimes around 10-20 hours. Stepwise losses on B1. 05/11/2010 LHC 8:30 meeting

Optics measurements Initially some problems with AC dipole in H, solved by kicker expert – arming issue. Q-kicker used. Optics in good agreement with protons. Many BPMs do not trigger in capture mode. 05/11/2010 LHC 8:30 meeting

Losses with kicks 05/11/2010 LHC 8:30 meeting

Beam parameters Intensity: Emittance: Around 1-1.2E10 – sometimes even too high to be a probe beam cannot inject into empty ring). Emittance: Both beams around 1.0-1.2 um just after injection (! with Pb gamma) – nominal. Proton equiv. emittance 2.5-3 um. Beam is blowing up quickly to 3-4 um. Energy calibration: from RF frequencies of protons and Pb: fRF[p] = 400.788876 MHz fRF[Pb208]=400.784230 MHz >> Energy[p] = ~450.0 GeV – prel. error around 0.4 GeV 05/11/2010 LHC 8:30 meeting

Plans Friday 5/11 – AM Collimation 450 GeV, loss maps BI, RF Friday 5/11 – PM First ramp, collimation checks, possibly squeeze. Friday night – Saturday Collimation on flat top, squeeze etc 05/11/2010 LHC 8:30 meeting