Value of contract: Length of contract: Contract start date:

Slides:



Advertisements
Similar presentations
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
Advertisements

Nebraska Athletics Green Report Totals to Date Football Recycling reached almost 27,000 pounds of recycling in the 2011 season That is equal.
© Oxford University Press 2011 IP1.9.4 Payback calculations Payback calculations.
122, 124, 126 Palatine Road, Blackpool, Lancashire, FY1 4DS Of interest to investors Opportunity for a strong Return On Investment 13 flats spread over.
13 PLEASANT STREET, BLACKPOOL, FY1 2JA UNOCCUPIED, FREEHOLD, FORMER GUEST HOUSE In need of full refurbishment Potential for conversion STPP Full vacant.
THE SUMMER OF CHANGE Things are happening ….. WEEK ONE.
Hogan Residence Bathroom Remodel Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition (see other presentation) Upstairs.
Stick Mann Remodeling a Bathroom. My Background Interested in construction from a young age Took 5 sections of woodshop in high school.
St Helens High School Building Construction
Construction Drawings for Graphic Communication A building or construction project requires a complete set of specialised drawings. These drawings are.
Educational qualifications and experience required from the technical staff of contracting activities # Activity code Activityeducational qualification.
Sapphire INTERIOR DESIGN – PROJECT MANAGEMENT – MAIN CONTRACTORS COMPANY PROFILE Head Office:- Sapphire House, 18 Gladstone Road, Croydon, Surrey, CR0.
FOR SALE Napier Avenue Blackpool FY4 1PA Large Garage and patio garden PVCu Double Glazing & Gas Central Heating No Chain & close to the Promenade Large.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
Jacob Ruiz W# ET Senior Design Instructor: C. Koutsougeras Advisors: R. Rode May 9, 2014 Jacob Ruiz W# ET Senior Design Instructor:
Sectoral Coverage – Construction and related services Workshop on Scheduling Specific Commitments for Construction and related engineering services and.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
FOR SALE 132 Park Road Blackpool Lancs FY1 4ES 3 Bedrooms Rear porch/ conservatory PVCu Double Glazing Gas Central Heating Price: £74,950 Middle Terraced.
TO LET Various Suites of Offices to the rear: 35/37 Victoria Road East Thornton-Cleveleys Lancs, FY5 5BU INDIVIDUAL OFFICE SUITES AVAILABLE FROM £30 PER.
All Saints’ RC School Mansfield PE Changing Room Refurbishment 2007 Consultant : CP Associates Contractor : Tanbry Construction, Mansfield Cost :£372,
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
NCHA ENERGY AND ENVIRONMENTAL SERVICES. NCHA has two major energy related aims to reduce carbon emissions to provide warm, affordable homes They aim to.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
Bathroom Remodel Checklist Tel: Fax:
A series of refurbishment and alteration projects leading to the vacating of most of level 3P and some of level 2P to allow the opening of the new College.
FOR SALE Flat F, Lincoln Court 143 Hornby Road Blackpool FY1 4JG Two bedrooms Garage to the rear PVCu double glazing Price: £69,950 Purpose built, self.
MY House By Jayuana Ware. Master Suite The Area of the floor is 128. The color is shell frost. The type of floor is carpet. The Price is $ 1.23.
Designers & Consultants - LIGHT CLIENT : Balajee Group ID : PIA, Bangkok ARCHITECT : L.S.Vaswani PROJECT : Marriott, Indore BANQUET ZONE LIGHTING DETAILS.
RMIS Engineering At RMIS Engineering we specialise in Mechanical Engineering Contracting and Fabrication works to serve a wide range of industries in Carbon/Mild.
Home Repair and Building Contract We undertake New House Construction and Various Repairing works of your Dream Home. New House building Contract House.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02.
Consultation Process within the Street Lighting PFI SSE Contracting Working in partnership with Nottingham City Council.
1 Consultation Process within the Street Lighting PFI SSE Contracting Working in partnership with Nottingham City Council.
Energy transformation. Law of Conservation of Energy.
.,. Contents 1ABOUT US 2OUR PURPOSE & VISION 3HISTORY & MANAGEMENT 4VALUES 5SERVICES 6SERVICES CONTINUED 7WORKDONE 8WORKDONE CONTINUED 9CONTACT DETAILS.
Brigade Parklane
EDENSVILLE ESTATE SIMAWA.
Construction Drawings for Graphic Communication
10 years in a “light green” house
Welcome to Haberfield Holdings
QMC Nottingham - Refurbishment works to Wards A23 & B50
14 High Leys Drive, Ravenshead, NG15 9HQ
20 Chestnut Drive, Mansfield
The Beehive House, Castledine Street, Loughborough
St Nicholas Church, Tuxford Nave, South & North Aisle Re-ordering
Field House, Car Colston
The Hollies, Ravenshead
2007 Bond Issue Capital Improvement Program
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
Widmerpool House, Kinoulton Road, Widmerpool
The Acorn Medical Practice, Wood Street, Mansfield
Value of contract: Length of contract: Contract start date:
Westminster House, The Wells Road Centre, Nottingham
Value of contract: Length of contract: Contract start date:
White Post Farm, Farnsfield
14 Crow Hill Rise, Mansfield
No. 4 Wood Street, Mansfield
145 Main Street, Burton Joyce, Nottingham
Hardwick Park Farm, Hardwick Estate, Norwood
Lindleys Mill, Prospect Place, Sutton In Ashfield
Bathroom renovation Masters build.
PKL INVESTMENTS LTD Value of contract: Length of contract:
Poswillow Suite, Children's Dental Unit
Ashfield District Council Disabled Facilities Adaptations
Field House, Car Colston
Coppice Ridge, Fiskerton, Newark
Eaton MEDC, Sutton-In-Ashfield
Value of contract: Length of contract: Contract start date:
Value of contract: Length of contract: Contract start date:
Presentation transcript:

Basford Hall & Clarendon College, Nottingham Refurbishment of Toilet Blocks Value of contract: Length of contract: Contract start date: Completion date: £137,000 1 month September 2011 October 2011 Works/services provided: Strip out, Demolition & Structural alterations Non slip vinyl Flooring Plumbing and heating IPS, bespoke Partitions cubicle systems & Vanity Units ‘Large format’ Porcelain wall tiling and detailing Sanitary ware Electrical installation & Energy efficient lighting Decoration Detailed description of contract: Complete refurbishment of existing toilet blocks including new sanitary ware, cubical systems, porcelain tiling and flooring. Particular challenges to be overcome: Contact details: Working in a “live” education environment the installation works in three separate areas were accurately programmed to suit the needs of the client, students and staff Simon Rhodes (Senior Building Surveyor) Gaskell Construction Consultants Victoria House 104 Mansfield Road Nottingham. NG1 3HD Tel: 01159 484744