Capitalising on Experience

Slides:



Advertisements
Similar presentations
The Challenge to Install 1,300 New Water Meters. Scope Install electromagnetic meters (mostly) + telemetry + solar power ~700 sites in Upper Murray Valley.
Advertisements

10/9/ WECC Human Performance Work Group Conference “Building the Burning Platform for a Human Performance Program” Kent Peterson Human Performance.
HIPSSA Cost model training workshop: Session 4: The 7 Habits of Highly Effective Cost Modelling EXPERT LEVEL TRAINING ON TELECOM NETWORK COST MODELLING.
1 NRC Regulatory Initiatives National Radiological Emergency Preparedness Conference 2009 April 21, 2009 Bill Dean Deputy Director, Office of Nuclear Security.
Slide 1 Achieving Excellence in Delivering Mega Oil Sands Projects APEGGA Annual Conference April 26 and 27, 2007 Calgary Facilitated by Dr. George Jergeas.
SMART METER TEXAS Status Update April 1, AGENDA Release 1 Smart Meter Texas Online Portal Update One on one REP SMT FTPS and API Integration Process.
Challenges in developing a Safety Case WG5. How to Develop a Safety Case SC can be a tool for providing information to stakeholders other than regulators.
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
Leadership SGA Leadership Conference  Michael Nunez- President  Jessie Miller- Vice President  Angel Aranda- Cultural Diversity Ambassador  Kenneth.
Modification Process Simplification Mike Hayes Exelon Nuclear.
Do now! Can you remember all the different types of energy we discussed last lesson?
Learning by Experience A Project in the Design Phase 2:15 – 3:00 Performed by: A Cast of Many.
3rd Party Update To RMS November 20, 2013 Bob Frazier Senior Director of Electric Technology CenterPoint Energy (representing SMT JDOA)
Tusp, Barrow Hill, Maidstone Road, Ashford, England, TN24 8TY – – Tel: The Planning Lock Process Richard D Smith.
1 Emerging Issues: Materials and Mechanical Michele G. Evans, Session Chair 2009 RIC.
New Reactor Construction Inspection
New Event Model Summary. AIAA’s Goals in New Event Model Ensure our Institute is relevant to aerospace professionals Ensure our conferences integrate.
Enhancements to the NRC Allegation Program Technical Session: NRC/Industry Response to Security Inattentiveness Concerns Lisamarie L. Jarriel Agency Allegation.
Integrating information towards Digital ATM Welcome Presented By: Joshua Gustin Director, AIM Date:August 27, 2013.
Tallahassee, Florida, 2015 COP4710 Database Systems Project Overview Fall 2015.
National Nuclear Regulatory Portal (NNRP) (Concept, Development and Experience) FNRBA Training Course on Knowledge Safety Networks, 14–18 October 2013,
INTEGRATED STRATEGIC PLANNING PROCESS (ISPP) 10 year planning outlook10 year planning outlook Monia Lahaie, DCFO and Director General Finance at Statistics.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
Nuclear power. Lesson Starter Write down any information you know about the use of nuclear power. Do you think nuclear power is a good idea and should.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
CAMSS Collaborations Credentialing Sallye Marcus, Anthem Blue Cross Mei Ling Christopher, UnitedHealthcare.
Steven Barnett Division Chief IMF Asia and Pacific Department January 2014 The views expressed in this presentation are those of the author and do not.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
SLC – You tell me Web design – Using software design a website.
Transition mechanisms Large Projects. Proposed capital expenditure Categories  Purpose of the session is to provide − a summary of the proposed transition.
Learning and remembering.
SAMPE Long Beach FluidReview Website
Please sign in on the clipboard!
Please sign in on the clipboard!
Offerings for design safety from harmonization
Department of Science & Technology (DST) Nuclear Skills Programme
Session Name Speaker Name & Info
Ageing Management Session Name: Principles of Ageing Management
Session Name: Ageing Management
تكملة الوحدة الاولى الفصل الثاني بالكتاب للاطلاع ثم الفصل الثالث التخطيط لبناء الاختبارات التحصيلية الفصل الثالث من الكتاب (87-164)
Promoting Rational Drug Use in the Community
Local Nuclear Industry Readiness
Session Name: Lessons Learned from Mega Projects
LIST OF CRITERIA TO EVALUATE A LESSON PLAN
Developing of Licensing Process for NPP
Board of Regents Capital Projects Review & Approval Process
Overview of Vogtle Nuclear Power Plant
Integrated National Reporting System of Radioactive Waste Management in Indonesia (SALT) By developing SALT reporting system, BAPETEN will be able to control.
TOOLKIT Idea Fact-Finding Feasibility Business Planning Implementation
CNL Training & Contractor Site Orientation
Introduction to Remediation
Panel Session 3 Small Modular Reactors Chairman: Prof Johan Slabber.
Strengthening nuclear science and technology skills in South Africa
WFRN 2018 post-conference survey
A Streamlined Approach for R&G Approvals
950 Chairs (Group Leaders) Worldwide 13,000 U.S. Members
30 Regulatory Activities and Lessons Learned in Korea for a LILW repository E. J. Seo1, M. C. Song1 1Korea Institute of Nuclear Safety, Daejeon, Republic.
Sloan’s Schedule 1st Period :20 – 8: PAP World Geography
Bell Schedule Regular 1st Hour – 8:17 - 9:10 -- CBA
Joint Application Development (JAD)
NRS Ed.1: 2010 National Code of Practice: Emergency Load Reduction and System Restoration Practices CHECKLIST.
Infrastructure Development
RADIOBIOLOGY OF THE EYE LENS
S.M. Oyeyemi, T .C. Akpa, T.A. Faru
Company name New City Glass Counyry Egypt Industry Manufacturing
Session: Tidemark Interface Session
For More Details:
Project Owyhee MOSIS Digital Lock
Session #: Title: #IASA2020
Presentation transcript:

Capitalising on Experience Session Name: Lessons Learned from Mega Projects Speaker Details: Rod Speedy Eskom, Group Capital, Project Development, Chief Advisor - Nuclear Power

2nd NUCLEAR REGULATORY INFORMATION CONFERENCE Energy Planning

2nd NUCLEAR REGULATORY INFORMATION CONFERENCE

2nd NUCLEAR REGULATORY INFORMATION CONFERENCE Integration Management Staged Approvals Requirement planning Shared resources Integrated realistic schedule Defined interface points Site access Integrated Planning Interdependencies Change control

2nd NUCLEAR REGULATORY INFORMATION CONFERENCE FIN – but remember….