T2K Run8 MUMON Summary.

Slides:



Advertisements
Similar presentations
Beam direction and flux measured by MUMON K. Matsuoka (Kyoto) for the MUMON group Contents: 1.Beam stability (direction/flux) 2.Absolute  beam flux.
Advertisements

MERIT Pump/Probe Data Analysis Outline  The pump/probe program  Particle detector response correction  Pump/probe analysis results NFMCC Collaboration.
Particle Detector Waveforms for Shots and T. Tsang BNL (Dec. 17, 2009)
Beamline Takashi Kobayashi 1 Global Analysis Meeting Nov. 29, 2007.
CESR Beam-Beam Effects at CESR Mark A. Palmer Cornell University July 14, 2001.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Calibration issues for the CALICE 1m 3 AHCAL LCWS11 - International Workshop on Future Linear Colliders Granada, Spain 2011/9/28 Jaroslav Zalesak Institute.
Beam Secondary Shower Acquisition System: Cables Measurements Student Meeting Jose Luis Sirvent PhD. Student 22/07/2013.
S. White, LBS 17 May Van Der Meer Scans: Preliminary Observations.
Coincidence analysis in ANTARES: Potassium-40 and muons  Brief overview of ANTARES experiment  Potassium-40 calibration technique  Adjacent floor coincidences.
Profile Measurement of HSX Plasma Using Thomson Scattering K. Zhai, F.S.B. Anderson, J. Canik, K. Likin, K. J. Willis, D.T. Anderson, HSX Plasma Laboratory,
T-980 Crystal Collimation Recent Results T-980 Collaboration: FNAL, SLAC, BNL, CERN, PNPI, IHEP, INFN D. Still CM14 April 27, 2010.
IPBSM status and plan ATF project meeting M.Oroku.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
Rosen07 Two-Photon Exchange Status Update James Johnson Northwestern University & Argonne National Lab For the Rosen07 Collaboration.
Validation workshop, Frascati, 13 December 2002Page 1 SCIAMACHY products quality and recommendations Based on presentations and discussions during this.
E.C. Aschenauer RSC-Meeting, January 21st T h e b e s t k e p t s e c r e t n u m b e r a t R H I C / B N L / U S A f o r s u r e n o t t o b e.
Fiber Loss Monitor and Carbon IP Scanner Setup and operational tips August
Mitglied der Helmholtz-Gemeinschaft Calibration of the COSY-TOF STT & pp Elastic Analysis Sedigheh Jowzaee IKP Group Talk 11 July 2013.
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
BPMs period General BPM Tasks/Projects New single bunch BPM electronics on ALICE AR1 + ST2 They had been tested already last year by Alex and Ian.
A simple formula for calculating the momentum spread from the longitudinal density distribution and RF form Recycler Meeting March 11, 2009 A. Shemyakin.
» RHIC Polarimetry « Oleg Eyser for the RHIC Polarimetry Group 2014 RHIC Retreat, August 14.
Optimization of  exclusion cut for the  + and  (1520) analysis Takashi Nakano Based on Draft version of Technical Note 42.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
K. Matsuoka (Kyoto Univ.) for T2K muon monitor group
Jyly 8, 2009, 3rd open meeting of Belle II collaboration, KEK1 Charles University Prague Zdeněk Doležal for the DEPFET beam test group 3rd Open Meeting.
Muon absolute flux measurement in anti-neutrino mode A.Ariga 1, C. Pistillo 1, S. Aoki 2 1 University of Bern, 2 Kobe University.
A. Bross MICE CM17 February MuCool RF Program 805 and 201 MHz Studies.
T2K muon measurement 2014 Momentum module A.Ariga, C. Pistillo University of Bern S. Aoki Kobe University 1.
NuMI Horn Alignment Cross-hair System NuMI Horn Alignment Cross-hairs Target Hall Instrumentation Review November 18, 2002 David Ayres Argonne National.
Some feedbacks from DRS data analysis (very preliminary) F. Scuri - I.N.F.N Sezione di Pisa RD52 – Collaboration Meeting – Pavia, March 12, 2013 F. Scuri.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
Calibration issues for the CALICE 1m3 AHCAL ALCPG11 - Linear Collider Workshop of the Americas Eugene, Oregon, USA 2011/3/22 Jaroslav Zalesak Institute.
Muons at CalDet Introduction Track Finder Package ADC Corrections Drift Points Path Length Attenuation Strip-to-Strip Calibration Scintillator Response.
2016/3/31 Fast kicker Experiment at ATF ATF2 - 40nm beam production, measurement Extraction kicker The difficulty of the beam extraction is that the kick.
Absolute Polarization Measurement at RHIC in the Coulomb Nuclear Interference Region September 30, 2006 RHIC Spin Collaboration Meeting RIKEN, Wako, Japan.
Calibration of PPTA Data R. N. Manchester Australia Telescope National Facility, CSIRO Sydney Australia Summary Effect of calibration on timing Non-linearities.
Beam direction and flux measured by MUMON K. Matsuoka (Kyoto) for the MUMON group Contents: 1.Horn focusing effect 2.Beam stability (direction/flux) 3.Beam.
RHIC pC Polarimeters in Run9: Performance and Issues A.Bazilevsky for the RHIC CNI Group Polarimetry Worshop BNL, July 31, 2009.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
K2K and JHF-nu muon monitor Jun Kameda (KEK) 1. K2K muon monitor 2. JHF-ν muon monitor 3. Summary International workshop on Neutrino Beam Instrumentation,
Preliminary Analysis of the New Focusing DIRC Prototype Beam Data
Hardware considerations about Ar vs. Ne
PreShower Characterisations
HYPERIAS Consortium Meeting
The PSD at Pb-Pb run PSD drawbacks at Ar beam
Transfer line test: Beam stability measurements
K2K and JHF-nu muon monitor
Analysis Test Beam Pixel TPC
Development of the muon monitor for the T2K experiment
New Discriminator Board Test
Tuesday 22nd January - morning
Strip-line Kicker R&D at KEK-ATF
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
NanoBPM Status and Multibunch Mark Slater, Cambridge University
Status of Phase Feedforward Tests
BESIII EMC electronics
MUMON / emulsion total flux uncertainty
HyCal Energy Calibration using dedicated Compton runs
Soft X-Ray pulse length measurement
Optical links in the 25ns test beam
Neutrino Beam Profile Measurement
Development of hybrid photomultiplier for Hyper-Kamiokande
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Feedforward correction to injection bump error in the SPring-8
The ATLAS LAr. Calibration board K. Jakobs, U. Schaefer, D. Schroff
Stability of Calibration Data
Presentation transcript:

T2K Run8 MUMON Summary

troubles, setting changes proton beam bunch width increased from run710058 : timing offset adjusted frequent timing error run720182 : timing fix applied timing module replacement, delay changed by 15ns from run720187 : timing offset adjusted IC attenuator 0dB  6dB from Run710098 EMTs installed ver.2, 3 : from Run71 ver.4 : from run74

history plots Run70,72,73,74 Run71 BSD files BSD is not reprocessed use updated one instead of BSD

profile center X stable within 2 cm Si & IC are consistent anti-correlation w/ proton beam position

profile center Y stable within 3 cm Si & IC are consistent anti-correlation w/ proton beam position

SSEM – Si correlation w/ angle corr.

profile width X 2~3 cm fluctuation Si & IC are consistent correlated w/ proton beam width

profile width Y 2~3 cm fluctuation Si & IC are consistent correlated w/ proton beam width

Si/CT history Horn PS current correction works very well w/ Horn PS correction Horn PS current correction works very well slightly decreasing after the correction ?

IC/CT history Horn PS current correction works very well w/ Horn PS correction calibration run (IC is 25cm displaced) attenuator 0dB  6dB Horn PS current correction works very well slightly increasing after the correction ?

Si/IC history IC attenuator 0dB  6dB Si / IC is gradually decreasing

investigation of Si yield decrease

run by run mean value history use run>=710098 ( IC attenuator setting change ) same vertical scales (2% full range)

run by run mean value history use run>=710098 ( IC attenuator setting change ) linear decrease  can be a radiation damage degradation rate ~ 1% / 5x1020 POT

bunch by bunch yield 1st bunch yield is decreasing faster 1st bunch 2nd bunch 3rd bunch 4th bunch 5th bunch 6th bunch 7th bunch 8th bunch 1st bunch yield is decreasing faster suggesting increase of tail (slow) component IC 8th bunch is saturating as beam power increase

proton beam bunch width bunch width affects Si/CT or Si/IC checked CT pulse width 50% of peak FWHM 10% of peak rise time decay time

proton beam bunch width drastic change on Nov.24 (run071058) variation after run71 is not monotonically cannot be a main reason of Si yield decrease

waveform comparison selected runs which have similar CT5 pulse width 1st bunch waveform normalized by CT5 1st bunch ppp averaged waveform (~1300shots), timing adjusted Run date power CT5 FWHM rise time 710229 Dec. 16 430 kW 94.8 ns 66.0 ns 720053 Jan. 17 440 kW 96.4 ns 66.5 ns 730034 Mar. 13 96.2 ns 65.7 ns 740035 Apr. 9 450 kW 95.2 ns 65.1 ns

CT5 waveform run710229 run720053 run730034 run740035

IC center ch waveform run710229 run720053 run730034 run740035

Si center ch waveform run710229 run720053 run730034 run740035 pulse height of Si signal is gradually decreasing

backup