General wiring procedure for a new instrument

Slides:



Advertisements
Similar presentations
CRIMPING Introduction
Advertisements

Optical Manufacturing Solutions 1 Probe Assembly.
Installation. Indoor Unit Installation Typical Installation.
Preparing a Launch Release Device. Gather the required parts 1 – Appropriate sized balloon 1 – Burner coil 1 – Spool 1 – String with small loop on one.
How to Sew a Button Step by Step Instructions. Thread the Needle If you like, you can double the thread to make this job quicker. Simply pull it through.
Digital Counter Training Video’s & Instructions. Contents: Digital Counter Components Step 1: How to assemble the Digital Counter Step 2: How to attach.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
Revised FR :25 EST Created TU (c) 2006 Evansdale Library, West Virginia University 1/21 Using a Personal Laptop in the Electronic.
GO ORDNANCE !!! ORDNANCECORPS 1 Troubleshoot the DC Electrical Control System on the EPP III.
How to Build A Computer By John A. Saiz. Materials Required Tools Screw driver Screw driver Tweezers Tweezers Flashlight FlashlightHardware PC Case PC.
1 Build a DC motor Prof. Anderson Electrical and Computer Engineering.
111 © 2002, Cisco Systems, Inc. All rights reserved. Trim out phase steps Cutting cables to length Labeling cables Dressing cables Terminating cables Installing.
How to Replace Your Desktop PC’s Power Supply Computer Based Training Objectives.
OBJECTIVES 1. Create correctly sized connectivity cabling.
Parts list 1 – 8’ 2” OD stainless steel pipe, chamfered at both ends 1 –7’ 4” PVC pipe 2 – 4” PVC end caps, with appropriate holes 1 – heater (model#=Omegalux.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
1 66 blocks are prevalent in the telecommunications industry Today they are used primarily for phone applications only 66 blocks are prevalent in the telecommunications.
The Saigon CTT Semester 1 CHAPTER 9 Le Chi Trung.
Chapter 6 Adding SCSI cards and Drives
Mark a line at the center of the canvas for its entire length. Place frame on a table or saw horses, bottom up.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
Procedure of Connecting Coil Unit In series with Capacitor 10 April 14 Product: Fully Automatic Washing Machine.
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Magnets Chapter 8.
Parts list 1 – 8’ 2” OD stainless steel pipe, chamfered at both ends 1 –7’ 4” PVC pipe 2 – 4” PVC end caps, with appropriate holes 1 – heater (model#=Omegalux.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Mounting System for new modules Module AIT-PL-6. Mounting way The mounting system for new frameless modules AIT PL-6 was designed and is produced by Spanish.
PC Systems Building System Components Installation Procedures Sample PowerPoint Presentation.
How to Sew a Button Step by Step Instructions. Thread the Needle For buttons, you should double the thread to make the job quicker. Pull it through the.
STEP BY STEP INSTRUCTIONS Basic Hand Sewing. Thread the Needle If you like, you can double the thread to make this job quicker. Simply pull it through.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Notes taken from Gillette’s Designing with Light.
2003/Nov/16 version #1.Page 1 Aerogel HV cable assembling procedures (for W1-SOUTH-side of 80 Aerogel Boxes) Phenix high-pt PID upgrade team Original version(Oct/11/’03):
P 5 CONNECTING HARDWARE Lynda Spencelayh 1. Connecting hardware This is a practical task you will be expected to evidence these procedures via photos.
Level 1 Diploma in Electrical Installation © 2014 City and Guilds of London Institute. All rights reserved. 1 of 13 PowerPoint presentation Stripping and.
RockOn! RockOn! Structure Build RockOn! 2009.
Schematic Diagrams Schematic diagrams are used to graphically represent the components and interconnections of electrical circuits. Electronic schematics.
Materials. Bend wire in middle to create an open loop 9 to 10 inches wide in diameter.
Nowadays HP scanner facility comes with printer that provides all-in one facility for multiple purpose use through a single device. HP scanner is not.
30’ Wireless Mast – Self Install
PostBase Automatic Feeder Component Removal Service Training
Chapter Two Power Supply Dr. Mohammad AlAhmad
X-Spot Lamp Socket Replacement Procedure
Changing Strings on the Guitar
Hardware, Installation & maintenance
Service channels between Tracker and PP1
Introduction To Computing
Sewing Basics: How to Sew on a Button
Wiring the Breadboard (the right way).
Best Practices for using Laptops
S12700 CSS Card Clustering 1 Components and Tools 2 Installing Cards
First of all we will remind some numbers:
Beckwith Tap changer with TapTalk
HP Printer Support Ireland Toll-Free Number:
SKYLINE SKYLINE HAS CHANGED THE WAY THE POLEBOX CARD SHOULD BE WIRED AND ALL FUTURE NEW INSTALLS WILL BE DONE THIS WAY. IF YOU GO TO A SITE TO WORK ON.
How to Install the Engine Block Heater in your Car
Essential Tips to Perform Ignition System Checks.
What are the Symptoms of Low Oil Pressure in Car Engine
Step by Step Instructions
LST Module Installation
Wiring the Light and Relay
TEC Services Status 30/12/2018 Nick Lumb.
Step by Step Instructions
1.11: Robot Controller.
Step by Step Instructions
Sewing Basics: How to Sew on a Button
Step by Step Instructions
Prof. Anderson Electrical and Computer Engineering
Presentation transcript:

General wiring procedure for a new instrument A problem that we have faced over and over in building new devices or instruments is to wire up a components properly. We need to take more time and effort to do this properly adding flexibility and robustness to the design. Use robust wire or multi-wire cable. Use “mate-n-lok” or similar connectors between devices so that the device can be removed and worked on easily. Leave excess length and coil the wire on both ends. Tie wrap down to frame. Tie wrap the wire to a frame, controller, gauge or computer. Keep all the wires low on the frame if possible, but visible and run along the rear of the frame until reaching the device . Wires should not be “floating” within the instrument frame. Floating wires get in the way. If it looks like spaghetti you have done it wrong! Use the label printer to label both ends of each wire connection. In the example below, we require four labels at each end of the wires/cables. Labels should clearly state what the connector should be plugged into. Use tie wraps or conduit to hold and run wires along the frame. If you have a drawer that holds the controller or device make sure that you leave enough slack in the wire to open the drawer completely. Place the power module low on the instrument and to the back. 110/220 VAC Power module at the bottom of frame. Shown above the frame here. Loops of wire that are tie wrapped to frame label device Multi-pin Connector Wire is inside conduit which is mounted to the frame KEEP THIS SPACE FREE! Alternative wiring routing scheme Tie wrap points. Controller 2/25/2019 M. Bier