Accidents and analysis January 2015

Slides:



Advertisements
Similar presentations
Line Efficiency     Percentage Month Today’s Date
Advertisements

1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA Oct-2013 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
NIRANTHARA JYOTHI SCHEME
Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA 11 th Aug 2014 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA MARCH-2013 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
Flow of Project-wise budget Monitoring Internal Controls effectively redefined Group of activities in the project which can be defined and monitored in.
Hazardous Materials Emergency Preparedness Grant Multi – Year Award Process Matthew R. Jones Sr. Grants Management Specialist Grants and Registration Branch.
What are they? Where do they come from? How do I make them go away? 1.
Presentation on Annual Action Plan for IWMP
Procedures for work on Fixed Electrical Installations Toolbox Talk 2: Duties of Staff and Contractors.
Mission Khodad Narayangaon Road…Do it Now!!! Review Nov – Jan Prepared by Sanjay Pokharkar.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
Tax Levy Workshop Levy Certification Process September 2016.
Advisor, IDS Cell1 NEGOTIATIONS G.C. Tallur (Former Secretary, PWD) Advisor, IDS Cell Monday, July 11, 2005.
OSHA Inspections.
Mike Ellis Executive Director – Property + Projects
Proposals for State: ……..
Ministry of HRD, Govt. of India
ANNUAL ACTION PLAN INTEGRATED WATERSHED MANAGEMENT PROGRAMME
Issues and Intervention required - Karnataka
G.C. Tallur (Former Secretary, PWD) Advisor, IDS Cell
WELCOME ANNUAL ACTION PLAN For IWMP
(Business Professional)
Tax Levy Workshop Levy Certification Process
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec CONGRESSIONAL ACTIONS
GRANT – RECAPITALIZATION OF LIBRARY SERVICES SEPTEMBER 2009
Summer Plan: 2013 (1st March – 31st May)
GST Trans-1.
Filings GOODS AND SERVICE TAX Mohd. Irshad Ahmed
Completing the State Aid Payment Request
2018 Safety Group 1 – 5 Year Program Timeline Guide
Accidents and analysis August 2015
2017 Safety Group 1 – 5 Year Program Timeline Guide
Tax Levy Workshop Levy Certification Process
Management Civil I Module 6 – Cash Flows.
NIRANTHARA JYOTHI SCHEME
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA
2019 Safety Group 1 – 5 Year Program Timeline Guide
REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA
Stock Maintenance and Condemnation
Electricity Cost and Use – FY 2016 and FY 2017
Value-Based Payments.
REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA 27-Oct-2014
Safety Group Program Timeline
Nine Months Ended December, 2018
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Births as per Civil Registration System,
Text for section 1 1 Text for section 2 2 Text for section 3 3
REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA 28-July-2014
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
2016 Safety Group 1 – 5 Year Program Timeline Guide
Text for section 1 1 Text for section 2 2 Text for section 3 3
2019 Annual Meeting Agenda Secretary – (7:35-7:45)
Safety Group Program Timeline
2012 Safety Group 1 – 5 Year Program Timeline Guide
2012 Safety Group Advantage Program Timeline
2012 Safety Group Advantage Program Timeline
2013 Safety Group Advantage Program Timeline
Comparision of No. of Accidents in BESCOM
Value-Based Payments.
FY 2019 SCHOOL-BASED FEEDING PROGRAM
Presentation transcript:

Accidents and analysis January 2015 By Q,S&S Section

ATR for the Accident Review Meeting held on 13. 01 ATR for the Accident Review Meeting held on 13.01.2015 from Quality, Standards and Safety Section: Sl. No Subject Action taken 1 Compensation pending Circular for conducting Adalats to clear all pending cases issued on 31.12.2014. Dead line 31.01.2015 2 Safety Proposal The formats for Safety equipment's / materials & action plan for safety works required for FY16 is mailed to all SEEs on 24.01.2015, 30.01.2015 and 02.02.2015. The details are yet to be received. 3 Feeder Inspection Requested CEIG on 23.12.2014 to start Rural feeder inspection. Started during Jan 15, Progress yet to be received 4 Spacers All circles floated tenders - Status

Comparision of No. of Accidents in BESCOM Particulars FY-14 FY-14 (April  to Jan) FY-15 (April  to Jan) Jan 14 Jan 15 Fatal Departmental 7 5 1 Non-Departmental 107 96 131 8 9 Non Fatal 53 41 39 2 52 42 37 3 Animal 47 45 38 Total 266 229 252 14 15 Note: 1. Crop burnt –Tumkur - May 2014 2. House hold items burnt - Davanagere - July 2014 3. Crop burnt Tumkur - Nov 2014 4. Shop burnt – Kolar – Dec 2014

Percentage increase/decrease of accidents compared to previous year Particulars FY-14 & FY-15 (April  to Jan) Jan-14 & Jan-15 Fatal Departmental 40.0 0 to 1 Non-Departmental 36.5 12.5 Non Fatal -4.9 -50.0 -11.9 0.0 Animal -15.6 Total 10.0 7.1

Division wise no. of accidents in Descending order-for FY-15 ( April-14 to January -15) Sl. No. Name of the division Name of the Circle Fatal Non-Fatal Animal Total Total Fatal Accidents Dept Non-Dept 1 Madhugiri Tumkur 15 4 6 26 2 Davanagere 11 8 21 12 3 KGF Kolar 13 Yalahanka BRC 7 5 Ramanagar Other Divisions

INSPECTORATE REPORT

Total accidents occured during FY-14 Balance analysis to be furnished Analysis of accident based on Electrical Inspectorate report for FY-15 ( upto January -15) Sl.No Cause of Accidents Total accidents occured during FY-14 Fatal Non-Fatal Fatal Animal Total Balance analysis to be furnished Dept Non-Dept 1 Accidental contact with live electrical wire/equipment 252 23 5 3 31 127 2 Snapping of Conductor 12 10 Violation/Neglect of safetymeasures/lack of supervision 4 21 Inadequate /Lack of maintenance 8 9 19 Unauthorised work 16 6 Defective appliances/apparatus/tools 7 Any other reasons 73 11 13 125

Attributable to BESCOM Not Attributable to BESCOM Analysis of Fatal accident based on Electrical Inspectorate report during FY-15 ( Upto January-15) Sl.No Cause of Accidents Fatal Total Dept Non-Dept Attributable to BESCOM Not Attributable to BESCOM 1 Accidental contact with live electrical wire/equipment 14 9 23 2 Unauthorised work 16 17 3 Snapping of Conductor 12 4 Defective appliances/apparatus/tools 10 5 Violation/Neglect of safetymeasures/lack of supervision 8 6 Inadequate /Lack of maintenance 7 Any other reasons   36 37 78

Observations attended by Sub Division Inspection carried out by Inspectorate in FY-15 ( April – January - 15) Sl. No. Division Sub Division Inspected month Inspection conducted Observations attended by Sub Division Remarks No. of Feeders No. Of DTCs 1 Feeder wise inspection not done in Rural areas 11 Feeders & 309 DTCs inspection done in BMAZ for which 45 DTC has been attended NOTE: Inspection will be carried out in Rural areas BMAZ

COMPENSATION PAID

Compensation paid during FY-14 & FY-15 upto January 2015 Sl No Month Animals Persons Property Total No. of cases Total Amount (Rs in Lakhs.) Nos. Amount ( Rs in Lakhs.) Amount (Rs in Lakhs.) Nos 1 FY-14 28 1.39 21 73.30 0.75 50 75.44 2 FY-15 upto Jan 15 26 1.35 33 97.76 1.67 60 100.77 Compensation Pending: 2013-14 2014-15

STATUS OF FATAL ACCIDENT FILES: The number of fatal accidents for the month of January 2015: 1. Departmental - 0. 2. Non Departmental – 9 nos. B. All files forwarded to GM (Admin & HRD) for conducting enquiry by 3 member Committee as per circular CYS 95 dated 26.11.2013 . C. Fatal Accidents : 09

REPLACEMENT OF IRON POLES

Details of iron poles replaced during FY-15 ( April – January - 15) Sl. No. Division Circle No. identified as per Divisions Replaced during Apr - Jan - 2015 Corporate Directions During Jan-15 Cumulative poles which cannot be replaced Balance to be replaced 1 Kolar 1799 40 105 1694 To carry out the work departmentally also till the tender is finalized 2 K G F 5231 35 127 5104 Completion target 3 C B Pura 4877 100 316 4561 1.Kolar – 6 months 4 Chinthamani 3520 45 278 3242 2.BRC – Mar 15 5 Nelamangala BRC 1220 201 589 631 3.R’’ nagar – Jun 15 6 Yelahanka 1653 109 362 217 1074   7 C D pura Ramanagara 568 78 322 246 8 343 63 216 9 Kanakpura 361 15 102 259  BRAZ Total 19572 686 2417 16938

Details of iron poles replaced during FY-15 ( April – January 15) Sl. No. Division Circle No. identified as per Divisions Replaced during Apr - Jan - 2015 Corporate Directions During Jan-15 Cumulative poles which cannot be replaced Balance to be replaced 3 Tumkur 845 52 225 620 Completion target Tiptur 2509 38 239 2270 1.Tumkur – 5 months Madhugiri 468 96 291 177 2.Davangere – 6 months Davanagere Davangere 1240 70 281 471 488   Harihara 1222 105 396 826 Chitradurga 738 86 325 413 Hiriyur 1028 67 241 787 CTAZ Total 8050 514 1998 5581 BESCOM 29689 1297 4620 921 24148

HAZARDOUS LOCATIONS

Details of hazardous locations for FY-15 ( April- January - 15) Sl. No. Division Hazardous locations identified During Jan-15 Rectified during April- Jan -15 Balance to be rectified No. of photographs submitted Corporate Directions 1 Kolar 122 4 71 51 •As per KERC directives for prevention of electrical accidents, instructions are issued to rectify the hazardous locations. K G F 199 47 152 C B Pura 204 8 79 125 Chinthamani 106 2 73 33 Nelamangala 158 16 118 40 Yelahanka 44 10 Chandapura 3 9 7 Kanakapura 69 32 37  0 Ramanagara 58 5 34 24   BRAZ Total 976 59 507 458

Details of hazardous locations for FY-15 ( April- January - 15) Sl. No. Division Hazardous locations identified During Jan-15 Rectified during April- Jan -15 Balance to be rectified No. of photographs submitted Corporate Directions 2 Tumkur 76 7 52 24 •As per KERC directives for prevention of electrical accidents, instructions are issued to rectify the hazardous locations. Tiptur 165 44 88 77 Madhugiri 185 3 117 68 Davanagere 160 15 143 17 Harihara 139 38 109 30 Chitradurga 138 4 121 Hiriyur 75 14 35 40 13 on 10.02.15   CTAZ 938 125 665 273 BESCOM 9259 570 7278 1970

Details of Surprise Checks Sl. No Designation of the inspecting officer Total No. of inspections carried out during Jan-15 Cumulative inspection (April-Jan-15) Total Penalty imposed (if any) 1 CEE, BRAZ 4 17 Rs. 600 from staff and warning given to staff and agency 2 SE, Kolar 28 Nil 3 SE,BRC 7 66 SE, Ramanagar 53 5 EE,Nelmangala 14 6 EE,Yelhanka 12 40 EE, Kanakpura 8 EE,Chandapura 18 Rs. 400 9 EE,Ramanagar Rs.100 10 EE, Kolar 20 11 EE,KGF EE,Chintamani Rs.1000 from Agency and also notice issued to agency 13 EE, CB pura Rs.400 from staff BRAZ 80 306  

Details of Surprise Checks Sl. No Designation of the inspecting officer Total No. of inspections carried out during Jan-15 Cumulative inspection (April-Jan-15) Total Penalty imposed (if any) 1 CEE, CTAZ 7 23 Rs.700 from staff 2 SE,Davangere 4 65 Nil 3 SE, Tumkur 6 21 EE,Tumkur 5 EE,Madhugiri 25 133 Rs. 50 for not wearing uniform EE,Tiptur 14 69 EE,Davangere 101 131 8 EE,Chitradurga 9 EE,Harihara 12 42 10 EE,Hiriyur 11 CTAZ 178 516  

Progress of LTD Boxes fixed in FY-15 ( April – Jan- 15) Sl. No Division No. of LTD Boxes allotted No. of LTD Boxes Fixed during Jan - 15 Cumm. No. of LTD Boxes Fixed Balance to be fixed 100 KVA 250 KVA 1 Kolar 500 150 48 27 89 49 411 101 2 K G F 198 132 20 4 135 33 63 99 3 C B Pura 495 100 93 9 402 91 Chinthamani 300 38 109 10 191 28 5 Nelamangala 230 84 78 146 129 6 Yelahanka 624 250 35 75 201 124 423 126 7 Chandapura 494 323 141 32 431 138 185 8 Ramanagara 255 113 180 68 45 Kanakapura 74 77 -3 BRAZ TOTAL 3090 1336 376 216 1461 532 1629 804 Note: The No. of 100KVA LTD Boxes available in all stores = 1193 Nos. and 250KVA = 638 Nos. including BESCOM stores /

Progress of LTD Boxes fixed in FY-15 ( April – January - 15) Sl. No Division No. of LTD Boxes to be Fixed No. of LTD Boxes Fixed during Jan 15 Cumm. No. of LTD Boxes Fixed Balance to be fixed 100 KVA 250 KVA 1 Tumkur 485 307 122 78 260 173 225 134 2 Tiptur 160 18 41 133 12 27 6 3 Madhugiri 298 51 19 32 4 Davanagere 350 200 187 325 177 25 23 5 Chitradurga 250 100 94 52 66 34 Hiriyur 50 58 24 26 7 Harihara 90 CTAZ 1943 751 592 146 1666 478 277 273 BESCOM 6364 4788 1110 706 3957 3286 2407 1502 Note: The No. of 100KVA LTD Boxes available in all stores = 1193 Nos. and 250KVA = 638 Nos. including BESCOM stores