SMALL INDEPENDENT POWER PRODUCERS

Slides:



Advertisements
Similar presentations
Hydropower Development Policy & Regulatory Framework
Advertisements

A 2030 framework for climate and energy policies Marten Westrup
1/15/ A car starts from rest and travel 10s with uniform acceleration 5m/s 2. Find out its final velocity. Here, u=0 m/s t=10s a= 5m/s 2 v=? We.
Regulatory Framework and Emerging Issues Mahesh Vipradas.
- GDP 2011 versus 2010 – increase by 5.5%
Setting a New Course for Electricity in Ontario Presented to the WNA Annual Symposium by Milton Caplan 2004 September 8.
REGULATORY FRAMEWORK FOR ENERGY INFRASTRUCTURE INVESTMENT – GHANAS EXPERIENCE (PURC). ABUJA – NIGERIA MAY 1, 2008 By Commissioner Andrew Quayson Chairman,
PERSPECTIVES OF THE COMMON BALTIC ELECTRICITY MARKET Prof. Inna Steinbuka, Chair, Public Utilities Commission, Latvia The Institute of Economic Affairs.
The Role of ESCO in Wholesale Trade of Electricity (Capacity) ( REVIEW OF WHOLESALE TRADE OF ELECTRICITY) KUTAISI September,
SOME EXAMPLES OF GEOTHERMAL DEVELOPMENT POLICY AND LEGISLATION Mr. Getahun Demissie Geothermal Energy Consultant African Union Commission Addis Abeba,
Climate Change Mitigation in Developing Countries: South Africa Prepared for the Pew Center on Global Climate Change by Ogunlade.
REGULATORY AND INVESTMENT CHALLENGES IN HYBRID POWER MARKETS IN DEVELOPING COUNTRIES REGULATORY AND INVESTMENT CHALLENGES IN HYBRID POWER MARKETS IN DEVELOPING.
AN OVERVIEW OF REGULATION FOR EMBEDDED GENERATION. LAGOS – JULY, 2014.
WORKING DRAFT Last Modified 8/13/2010 4:05:09 PM Central Europe Standard Time Printed :22:48 Central Europe Standard Time Viktorija Sankauskaitė.
Cambodia’s Profile in Power Sector The First Mekong Energy and Ecology Training May 11-30, 2009, Thailand TONN KUNTHEL, BY HOUR & PHALLUY.
ZPC – Power and Energy Projects
Regulatory Environment and Small-hydro Development Professor Priyantha D C Wijayatunga Public Utilities Commission of Sri Lanka and University of Moratuwa.
RENEWABLE ENERGY FEED – IN TARIFF REGULATORY GUIDELINES Waste-to-Energy Seminar 17 July 2009 Cape Town By Bianka Belinska.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Cambodian Energy Sector Development Ministry of Industry, Mines and Energy Vietnam, Ho Chi Minh, 11 November, 2011 Greater Mekong Subregion Fifth Meeting.
Trading rules in Lithuania Giedrius Radvila Lietuvos energija AB 3 July 2006, Riga II MINI-FORA.
BALTIC ELECTRICITY REGIONAL INITIATIVE Riga, 24 April, 2009 LATEST UPDATE IN LATVIA Ainārs Meņģelsons Public Utilities Commission.
Organization of the electricity supply industry © 2012 D. Kirschen & University of Washington 0.
+ PROJECT BACKGROUND: KENYA THE NEED FOR CONSUMER PARTICIPATION IN THE REFORMS PROCESS OF THE ELECTRICTY SUB-SECTOR Susanne Rabisch, CUTS Nairobi.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
Location Map - Nepal Nepal Source:Great Rivers of the World, National Geographic Society, 1984.
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
. Juan de Fuca Cable. Safe Harbor Statement Included in this document is certain information which is “forward looking information” as defined by the.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
PACE - Private Public Partnerships in Rural Electrification Uganda International Stakeholders Meeting Presentation by Arthur B. Mugyenzi Renewable Energy.
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
Electricity Reforms in Bangladesh
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
Turkish Power System Overview March 2012
Lessons Drawing from Evaluations Relating to PPPs
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 9 Renewable Energy Module 9: REGULATORY MEASURES AND POLICY OPTIONS TO ENCOURAGE DEVELOPMENT.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Prof F.D. Yamba I NTERNATIONAL S EMINAR REFIT AND CHALLENGES IN ZAMBIA 30 TH – 1 ST M ARCH, 2015.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
EWEC Forum WINDFARMS PROJECTS IN MORROCO MILAN- 9 MAY, 2007.
CAPTIVE POWER POLICY. Section 44 of the Electricity(Supply) Act, 1948 gave birth to Captive Generation.  Any other person to establish or to acquire.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
BRIEF ON RE PROGRAMMES STATUS AND REFITS IN TANZANIA. For International seminar on Global Renewable Energy Support Programme focusing on Globally funded.
Course 3.6 Regulatory Commissions: Management & Staff Functions, Bangladesh, Mar 31- Apr 4, 2002 SOUTH ASIA REGIONAL INITIATIVE/ENERGY Regulatory Commission.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
Electricity Power Market: Competitive and Non-competitive Markets Ito Diejomaoh.
1 9. BUSINESS STRATEGIES IN ELECTRICITY MARKETS Asko Vuorinen.
Energy and Power Supply Papua New Guinea 1. PNG Power Limited PNG Power Ltd  is a State owned Corporation with the Government’s ownership interest held.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Energy Regulatory Authority (ERA) of Mongolia Mr.Tumentsogt Tsevegmid, MSc, MPA Regulator, Energy Regulatory Authority University Street 2A, Ulaanbaatar.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
CARILEC. An Association of Electric Utilities CARILEC An Association of Electric Utilities The Caribbean Electric Utility Service Corporation (CARILEC)
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
Electricity & Regulatory Overview of Korea
ELECTRICITY COMMISSION
Damitha Kumarasinghe Director General
Electric Power Industry Reform Act (EPIRA)
GEORGIAN ELECTRICITY MARKET OPERATOR
COUNTRY PRESENTATION OUTLINE: BURUNDI
GREEN MINIGRID REGULATORY REFORM: TRENDS AND APPROACHES *
THE REPUBLIC OF MALAWI MALAWI PRESENTATION AT
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Economic Policy interventions in the energy and mining sectors
THE STATE AND FUTURE OF INFRASTRUCTURAL PROJECTS IN UGANDA
Presentation transcript:

SMALL INDEPENDENT POWER PRODUCERS IN UGANDA BY BARBARA ASIIMWE KASULE REA 4/1/2017

BACKGROUND In 1997, the Government of Uganda through the Ministry of Natural Resources then, drew up a Strategic Plan for the power sector in Uganda. The objective was to strengthen and enlarge the power sector, so that it is able to provide adequate and reliable energy in order to ensure sustainable social and economic development. 4/1/2017

BACKGROUND (Contd) This plan resulted into the enactment of the Electricity Act of 1999. The Act ushered in changes like the unbundling of Uganda Electricity Board (the Government owned parastatal that had a monopoly in electricity operations), liberalization of the power sector and the introduction of competition in the sector, a regulatory framework for players in the sector and rural electrification. 4/1/2017

SMALL IPPS Renewable Energy Sources Co-generation - Bagasse As part of the Renewable Energy Policy framework, the Government promotes the development of small electricity generation projects. Renewable Energy Sources Co-generation - Bagasse Kakira Sugar Works (1985) Ltd – Generates 20MW, sells 12MW to the main grid (UETCL) and consumes 8MW internally. Kinyara Sugar – Generates 2 to 4MW consumes some and sells to UETCL. 4/1/2017

SMALL IPPS (Contd) Mini hydros Kilembe Mines Ltd – Generates 3 to 5MW depending on the hydrology and sells to the main grid. Kasese Cobalt Limited – Generates 10.5MW (Mostly for own use and sell 2MW surplus to the main grid). Tronde Power (Bugoye) – Has a capacity of 13MW. Is currently producing 6 – 10 MW depending on the hydrology and sells to the main grid.. .Kisiizi Hospital – Generates 374KW, uses some and distributes and sells surplus in neighboring environs. 4/1/2017

SMALL IPPS (Contd) Non-Renewable Energy Sources Thermal Electromax (Heavy Fuel Oil plant) – capacity 17.5MW but is currently producing 8MW cause of technical problems. It is connected to the main grid and sells power to UETCL. WENRECO (Heavy Fuel Oil plant) – Not connected to the main grid. It generates 1.5MW and distributes to consumers in West Nile. 4/1/2017

Mini –hydros in the Pipeline SMALL IPPS (Contd) Mini –hydros in the Pipeline Mpanga – Capacity of 18MW , has signed a PPA with UETCL. Commissioning scheduled July 2010. Ishasha – Capacity of 6.5MW, has signed a PPA with UETCL. Commissioning scheduled Aug 2010. Early production in April 2010 of 3 to 4 MW. Buseruka, Hoima – Capacity of 9MW, connected to the main grid and under construction. Nyagak – Not connected to the main grid. Is to generate 3.5MW and distributes to consumers in West Nile. 4/1/2017

PPA ARRANGEMENTS Under the Electricity Act there is the single buyer model. UETCL is designated as the bulk supplier of power and has a license to perform this functions. It transmits and sells electricity in bulk to distribution and sales companies. All the IPPs that are connected to the main grid sell electricity to UETCL The IPPs that are not interconnected to the main grid are licensed by the Regulator to generate, distribute and sale electricity. 4/1/2017

INCENTIVES OFFERED BY THE GOVERNMENT A subsidy was initially extended to small IPPs to buy down the cost of generation. So the feed in tariff was low. The situation was such that the feed in tariff and PPA were negotiated on a case by case basis. This increased the transaction time, costs and resulted into low investor turn out. In some instances investors abandoned at the negotiation stage. 4/1/2017

INCENTIVES OFFERED BY THE GOVERNMENT (Contd) The subsidy was replaced by published standardized feed in tariffs that give a certain Internal Rate of Return of about 15%. (Go to Table for Standardized Tariffs) 4/1/2017

Simple Weighted Average Published feed-in-tariffs Uganda Electricity Transmission Company Ltd in consultation with the Electricity Regulatory Authority for capacities under 20 MW Time of Use Year 1 to 6 Year 7 to 20 Simple Weighted Average Year 1 to 6 (Bagasse) Year 7 to 20 (Bagasse) Weighted Average Peak (1800-2400hrs) (US Cents/KWh 12.00 9.00 8.00 9.60 Shoulder (0600-1800hrs) (US Cents/KWh) 6.40 5.40 5.70 6.00 4.50 5.10 Off-Peak (0000-0600hrs) (US Cents/KWh) 4.00 1.50 2.25 4.10 4.04 Average Tariffs 7.20 5.33 5.89 7.03 5.25 5.96 4/1/2017

INCENTIVES OFFERED BY THE GOVERNMENT (Contd) With the removal of the subsidy the tariff is higher but the business environment has become more predictable and actually investments have increased. Most of the above IPP’s have been done after the event of subsidy. A standard PPA for all IPPs to have uniformity. An interconnector to evacuate electricity from the generation source is constructed by the Government. 4/1/2017

HOW IPPs ARE INITIATED According to the Electricity Act there are two ways: 1) An investor notifies the Regulator in writing about project. Notice contains aspects like description of project, technical and industrial competence of investor plus financial and legal status. The Regulator invites public to give comments about notice. After receipt of comments a permit can be issued by Regulator for investor to conduct studies. After studies an investor can proceed to apply for a generation license from Regulator. 4/1/2017

HOW IPPs ARE INITIATED (Contd) 2) Through solicitation. A project is packaged and advertised through a fair, open and competitive process by the Regulator. 4/1/2017

THANK YOU 4/1/2017