Madrid, 29 th January 2010 8th RCC Meeting South Gas Regional Initiative.

Slides:



Advertisements
Similar presentations
1 Harmonization of Cross Border Transmission Tariffs between Portugal and Spain (CNE/ERSE) Public hearing 15 th SG Meeting S-GRI Madrid, 7 th February.
Advertisements

1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
PROPOSAL FOR SETTING-UP THE IBERIAN GAS MARKET (MIBGAS) Harmonization of trading licenses in the Iberian area Terms of reference 10 July 2008.
Open seasons in European Markets: Overview and initial lessons learned Dominique Jamme ERGEGs Gas Focus Group (GFG) XIV Madrid Forum, May 2008.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 15 November 2013.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
15 th September 2013 Enagás and TIGF Information to NRAs.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
Madrid, 17 th February th IG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
Lessons from open seasons between France and Spain Regulator’s perspective Benoît Esnault Commission de Régulation de l’Energie (CRE) North West region.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
9th SG Meeting South Gas Regional Initiative 15th July 2009, Madrid.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
French Working Group Evolution of the contractual structure of the gas transportation network South Gas Regional Initiative 8th IG Meeting – 16th February.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative.
Update Transparency project RCC The Hague, 12 May 2011 Konrad Keyserlingk - Ofgem -
1 Madrid, 19 th November th IG Meeting South Gas Regional Initiative.
1 Madrid, 27 th February st IG Meeting South Gas Regional Initiative.
1 Madrid, 07 th February th SG Meeting South Gas Regional Initiative.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
1 July 2007 Gas Interconnection between Spain and France Comments to the TSO’s document on the analysis of the future interconnection infrastructures needed.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
1 Brussels, 27 th February th GRI Coordination Group South Gas Regional Initiative.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
Madrid, 11th February th IG Meeting South Gas Regional Initiative.
XV Madrid Forum, 6-7 November 2008 Gas Regional Initiative Progress and challenges.
French transport structure SG meeting Madrid – 15 July 2009.
Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.
Madrid, 12 th April th IG Meeting South Gas Regional Initiative.
OS 2015: next steps Proposals and agreements by TSOs 12 th IG meeting Paris 14 th December 2009.
Madrid, 27 October 2009 South Gas Regional Initiative Open Season France-Spain Validation of the results.
Madrid, 7 th May th SG Meeting South Gas Regional Initiative.
1 Open season th IG Meeting 26 th March 2010 Paris.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
10 th SG meeting Madrid 13 th November Index Capacities – Results Capacities – Further steps Capacities – Further steps.
8th SG Meeting South Gas Regional Initiative 27th April 2009, Paris.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
PROGRESS REPORT ON THE DEVELOPMENT OF THE IBERIAN GAS MARKET (MIBGAS) Presentation for South Gas Regional Iniciative 17th September 2007.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
Madrid, 1st April th SG Meeting South Gas Regional Initiative.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative TSOs’ report 2013/2015 – Main Findings.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
GRTgaz North  South Link Capacities Sales Organization Considering Future France – Spain Developments 5 th SG meeting of S-GRI in Madrid.
1 CRE proposal on how to allocate capacity according to the Joint Enagas, TIGF and GRTgaz investment plans: points that have been agreed / still need to.
1 South Gas Regional Initiative 14 th Stakeholders Group meeting Madrid, 11 th July 2011.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
21st IG Meeting South Gas Regional Initiative
Harmonization of Cross Border Transmission Tariffs between
2nd SG Meeting South Gas Regional Initiative TSOs’ report 2010/11 – Main Findings Madrid, 6th February 2007.
ERGEG South Gas Regional Initiative
Gas Regional Initiative
26th February 2015 Teleconference
29th April 2014 Teleconference
26th February 2015 Teleconference
Presentation transcript:

Madrid, 29 th January th RCC Meeting South Gas Regional Initiative

2 8th RCC meeting S-GRI- Agenda

3 II. Work program for 2010 INTERCONNECTION CAPACITIES OSP: to continue allocating short term capacity at Larrau, November OS: to monitor infrastructure construction associated to 2013 OS French TSOs and CRE to report on French investments decisions, January TSOs to provide a list of infrastructures, cost and operational start dates, 15 th February OS: to launch 2015 OS Regulators to decide on economic test, tariff visibility and capacity products, January TSOs to provide a list of infrastructures, investments cost and services availability dates, February Regulators and TSOs to communicate Stakeholders the procedure details, early March Final documentation and procedure launch, to be decided Stakeholders to sign contracts before August 4.Regional investment plan to be developed: Regulation 715/2009 (art. 12), December

4 II. Work program for 2010 INTEROPERABILITY 1.Study on CMPs at interconnection points: current status in each country, characterization, identification of problems taking into account CAM/CMP ERGEG paper, future action plan to solve them at the borders (Regulation715/2009, art. 16), October (Possibility to have different timetable for the interconnection Fr-Sp, Pt-Sp) 2.Study on compatibility between LNG terminals and interconnected pipeline networks: regulation 715/2009, art. 17, to be developed once fulfilled the first priority TRANSPARENCY 1.Update of Regulators 2007 Transparency Study: 1 st to check compliance (regulators) September with Regulation715/2009, 2 nd to invite comments by Stakeholders afterwards 2.TSOs to update building status records of OS infrastructures, June and December 3.TSOs to report on ENTSOG progress, quaterly REGULATORY HARMONIZATION 1.Regulatory proposals regarding common trading licence between Pt-Sp, Done January 2.Comparative study on cross border access tariffs between Pt and Sp, July 3.Regulatory proposal regarding cross border access tariffs between Pt-Sp, November, and Public Consultation on the proposal, December

5 III. Open Season Procedures III. Open Season Procedures Second Phase of 2015 OS STRUCTURE IN THE FRENCH NETWORK Information by CRE

6 III. Open Season Procedures III. Open Season Procedures Second Phase of 2015 OS CREs PROPOSAL ON ECONOMIC TEST, CAPACITY PRODUCTS AND OS PHASES Information by CRE

7 III. Open Season Procedures III. Open Season Procedures Second Phase of 2015 OS CNE COMMENTS ON CREs PROPOSAL: POINTS TO BE CLARIFIED 1.What are the infrastructures, investments costs and the annual recovery via TPA tariffs if building …? Irún-Biriatou project Midcat project: capacities at the border 2.What will the tariffs be in France in each possibility mentioned above…? TPA tariff structure TPA entry/exit tariffs values /MWh/day/year 1. Buliding 60 GWh/day 2. Building 100 GWh/day 1. Buliding 180 GWh/day 2. Building 80 GWh/day 3. Building 0 GWh/day

8 III. Open Season Procedures III. Open Season Procedures Second Phase of 2015 OS MIDCAT +IRÚN INVESTMENTS: Biriatou TIGF X1 MIDCAT TIGF X2 Artére Midi X3 Artére Rhône X4 X1+X2+X3+X4 MIDCAT MC2 INVESTMENTS: MIDCAT TIGF Artére du Midi Artére du Rhône X2+X3+X4 MIDCAT MC1 INVESTMENTS: MIDCAT TIGF CS Montpellier X5 Artére Rhône X2+X4+ X5 MIDCAT MC0 INVESTMENTS: MIDCAT TIGF Artére Rhône X2 + X4 IRÚN/BIRIATOU INVESTMENTS: Irún/Biriatou X1 N S GWh/d GWh/d N S 144 GWh/d 184 GWh/d N S 64 GWh/d 184 GWh/d N S 0 GWh/d 184 GWh/d N S 48 GWh/d

9 III. Open Season Procedures III. Open Season Procedures Second Phase of 2015 OS CAPACITY PRODUCTS TO BE OFFERED (for discussion) Midcat project: 1.Products: Spain- France: Spain-TIGF, Spain-GRTgaz South or Spain-TIGF and Spain-GRTgaz South TIFG-GRTgaz South GRTgaz South-GRTgaz North 2.Capacity (GWh/day) at every interconnection point 3.Capacity availability date (start of the services) 4.Multiannual / multiseasonal capacities 5.Firm/interruptible capacities Irún project: new capacities from South to North and vice versa, date of capacity availability

10 IV. Developments between Spain and Portugal UPDATE OF WORK: PROGRESS ON THE COMMON TRADING LICENSE A proposal containing required regulatory changes have been already sent to Ministries Information by ERSE and CNE

11 IV. Developments between Spain and Portugal Objective: To develop a proposal of cross border access tariffs between Spain and Portugal. It is an important step in order to reach the harmonization/integration of gas markets Creation of a task-force between ERSE and CNE to prepare a joint proposal for cross border access tariffs between the Spanish and Portuguese systems. CROSS BORDER ACCESS TARIFFS BETWEEN SPAIN AND PORTUGAL

12 IV. Developments between Spain and Portugal CROSS BORDER ACCESS TARIFFS BETWEEN SPAIN AND PORTUGAL 1.Develop comparative study of current cross border access tariffs between Spain and Portugal Identify the problems and main impacts for Iberian network users. We need to analyze the distortions and difficulties that cross border access tariffs between Spain and Portugal may pose for the creation of an Iberian market due to a possible pancaking effect, and to separate treatment of cross-border and domestic flows. 2.Making a proposal of harmonization cross border access tariffs Cross border access tariffs should facilitate the development of Iberian Market. 3.Public consultation process of the document conducted by CNE and ERSE