1 Madrid, 2 nd Nov 2011 17 th IG Meeting South Gas Regional Initiative VI. MIBGAS.

Slides:



Advertisements
Similar presentations
Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
Advertisements

GRIP South Region Gas Regional Investment Plans Investment WS – 29 th Sep 2011.
1 Harmonization of Cross Border Transmission Tariffs between Portugal and Spain (CNE/ERSE) Public hearing 15 th SG Meeting S-GRI Madrid, 7 th February.
Convergence in the structure of access tariffs – Harmonisation between cross border and domestic access tariffs in Spain and Portugal (MIBGAS) Terms of.
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
PROPOSAL FOR SETTING-UP THE IBERIAN GAS MARKET (MIBGAS) Harmonization of trading licenses in the Iberian area Terms of reference 10 July 2008.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Vienna, 8 April th IG Meeting Meeting Guide.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative.
1 Madrid, 27 th February st IG Meeting South Gas Regional Initiative.
1 Madrid, 07 th February th SG Meeting South Gas Regional Initiative.
1 Madrid, 19 th February st SG Meeting South Gas Regional Initiative.
18th SG Meeting South Gas Regional Initiative
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
1 Brussels, 27 th February th GRI Coordination Group South Gas Regional Initiative.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
Madrid, 11th February th IG Meeting South Gas Regional Initiative.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Joint IPE auction implementation and results 1 SWE IG meeting – 7 April 2014 Joint IPE auction Update on launch of long term coordinated product (CNMC.
Madrid, 7 th February 2011 Study on Cross Border Transmission tariffs in the MIBGAS (CNE/ERSE) Current Status.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
8th SG Meeting South Gas Regional Initiative 27th April 2009, Paris.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
Tom Maes, ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Transit contracts.
1 SPANISH HUB DEVELOPMENT 17 th IG meeting 2 nd November 2011.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
1 South Gas Regional Initiative 16 th Dec 2011 South Gas Regional Initiative 16 th Dec 2011.
PROGRESS REPORT ON THE DEVELOPMENT OF THE IBERIAN GAS MARKET (MIBGAS) Presentation for South Gas Regional Iniciative 17th September 2007.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
European Developments Transmission Workgroup 1 st December 2011.
1 South Gas Regional Initiative 14 th Stakeholders Group meeting Madrid, 11 th July 2011.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute NCC, Lithuania 11 th Baltic Electricity Market Mini-Forum 1 st October 2010.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
29th November 2016 Teleconference
Enagás, GRTgaz, Reganosa, REN and TIGF
Harmonization of Cross Border Transmission Tariffs between
4th October 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
Background and Process
18th July 2016 Teleconference
37th IG Meeting South Gas Regional Initiative
26th February 2015 Teleconference
37th IG Meeting South Gas Regional Initiative
29th April 2014 Teleconference
4th October 2016 Teleconference
18th July 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
Enagás, GRTgaz, Reganosa, REN and TIGF
37th IG Meeting South Gas Regional Initiative
29th November 2016 Teleconference
26th February 2015 Teleconference
12th December 2014 Teleconference
LNG Workshop Bilbao, March 13th 2009 GLE.
Presentation transcript:

1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS

2 VI.1 Proposal to achieve an integrated market

3 Regulators common position concerning the priorities for MIBGAS development ERSE and CNE approved a common position document concerning the priorities for MIBGAS development This common position document was sent to the Portuguese and Spanish Governments on 27 September This common position document was triggered by the Memorandum of Understanding signed by the European Commission, the European Central Bank, the International Monetary Fund and the Portuguese Government, where it is stated that In the gas market, the Government will take measures to accelerate the establishment of a functioning Iberian market for natural gas (MIBGAS), in particular through regulatory convergence. Take up political initiatives with Spanish authorities with the aim of eliminating the double tariff. [Q3-2011].

4 VI.1 Proposal to achieve an integrated market Regulators common position concerning the priorities for MIBGAS development The priorities identified are foreseen in the South Gas Regional Initiative Work Plan priorities were identified: CAM harmonization between Spain and Portugal Proposal for the harmonization of the access tariffs applied in the interconnections between Spain and Portugal, towards the elimination of pancaking effects Proposal for the harmonization of the balancing mechanisms between Portugal and Spain Proposal of models for the integration of the Spanish and Portuguese gas markets into an Iberian Natural Gas HUB

5 VI.1 Proposal to achieve an integrated market Regulators common position concerning the priorities for MIBGAS development CAM harmonization between Spain and Portugal Approval by the Regulators (ERSE and CNE) of a common Capacity Allocation Mechanism to be applied in the interconnections between Portugal and Spain in a harmonized way by the TSOs (REN and ENAGAS) in line with the ACER framework guidelines. TSOs have presented to the regulatory authorities a CAM proposal for public consultation. (Conclusion: January 2012) Development of a common Congestion Management Procedure to be applied to the interconnections between Portugal and Spain. (Conclusion: January 2013)

6 VI.1 Proposal to achieve an integrated market Regulators common position concerning the priorities for MIBGAS development Proposal for the harmonization of the access tariffs applied to the interconnections between Spain and Portugal, towards the elimination of pancaking effects Presentation by the Regulatory Authorities (ERSE and CNE) of an action proposal for the harmonization of the access tariffs in the interconnections between Portugal and Spain that enhance and facilitate market development avoiding tariffs pancaking effects on cross border flows. Taking into account the dispositions foreseen in the directives these tariffs and/or the methodologies for their calculation shall be approved and implemented by the National Regulators. (Conclusion December 2011)

7 VI.1 Proposal to achieve an integrated market Regulators common position concerning the priorities for MIBGAS development Proposal for the harmonization of the balancing mechanisms between Portugal and Spain Presentation by the Regulatory Authorities (ERSE and CNE) of an action proposal for the harmonization of the balancing mechanisms applied in the natural gas infrastructures, on the available flexibility to suppliers in each infrastructure, on the available balancing information and on the role of the market, the users and the TSOs on the resolution of the unbalance situations. This proposal has to be in line with 3 rd Package developments and a roadmap should be also presented, in line with the other actions necessary to the implementation of MIBGAS. (Conclusion: June 2013)

8 VI.1 Proposal to achieve an integrated market Regulators common position concerning the priorities for MIBGAS development Proposal of models for the integration of the Spanish and Portuguese gas markets in an Iberian Natural Gas HUB Presentation by the Regulatory Authorities (ERSE and CNE) of an analyses of the possible models for the integration of the Spanish and Portuguese gas markets in a common Iberian Natural Gas HUB (National Market Areas, Regional Market Zones or Supra National Market), analyzing the advantages and drawbacks, the regulatory harmonization requisites for its implementation and a proposal roadmap for its entry into force. (Conclusion: December 2013).

9 VI. MIBGAS VI.2 Update of the ERSE-CNE study on cross border tariffs between Portugal and Spain

10 Assessment of case studies based on the supply of a CCGT/industrial cons. from a MIBGAS entry point (LNG terminal/interconnection). For each case study: Entry costs into the transmission network are assessed as well as regasification costs Transmission costs include one country or two countries depending on the origin and destiny of the supply Costs for using underground storage or for balancing purposes are not considered Coherence check with the Target Model and the FGs under discussion Discussion on CBT target scenario and consultation on interim steps VI.2 Update of the ERSE-CNE study on cross border tariffs between Portugal and Spain

11 Next steps 1.Completing the study and submission to public consultation 2.Stakeholders will be asked to identify most needed developments to cross border transit tariffs 3.NRAs will issue a proposal on short term measures to foster market integration through cross border tariff harmonization 4.Long term European target model for market integration will provide guidance for short term developments VI.2 Update of the ERSE-CNE study on cross border tariffs between Portugal and Spain