Background T&SC V9.0: The Market Operator shall not grant the status of Under Test for the purposes of this Code to Autonomous Generator Units, Pumped.

Slides:



Advertisements
Similar presentations
Demand Side Units in the SEM
Advertisements

Regulatory Framework and Emerging Issues Mahesh Vipradas.
Mod_34_11 : Transition to SEM Intra-Day Trading 6 December 2011.
New EU Rules on Derivatives Trading The EMIR Reporting Technical Standards Victoria Cooley OTC Derivatives & Post Trade Policy Financial Conduct Authority.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
1 Loss Adjustment When Exporting Mod 24_11 Reflection of Physical Fixity of Interconnector Flows in Operational Data Transactions hen Exporting Modifications.
MOD_17_12 Report on Offered Capacity in Implicit Auctions.
Overview of Make Whole Payments Modifications Committee Meeting February 2015.
Mod_03_12 Alignment of TSC with Revised VAT Arrangements 29 th May 2012.
Global Aggregation Working Group 15 th September 2010.
Global Aggregation Working Group 15 th September 2010.
MPID 223 (Failure to Follow Synchronising Instruction) JGCRP 12 th November 2014 (Anne Trotter)
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
MPID 263 GCRP Constitution Modification David Cashman GCRP 11 th February 2015.
Review of Bulk Energy Storage in SEM Gaelectric Energy Storage T&SC Modification Working Group 6 th September 2012 Mullany Engineering Consultancy Energy,
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
Evaluation of Proposals for New Rules for Energy Storage Gaelectric Energy Storage T&SC Modification Working Group 23 rd October 2012.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Metering Modification to T&S code Cathal Kearney Protection & Metering 15/04/2015.
Modification Proposal Mod_11_12 Gaelectric Energy Storage Presentation to Modifications Committee 29/05/2012.
Mod 10_11 Interconnector Under Test Mod 14_11 Pumped Storage Under Test Tuesday, 5 th April 2011.
Single Electricity Market Update Liam Ryan SEMO. Background 2 years in operation Gross Mandatory Pool All Suppliers All Generations units over 10 MW Trading.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
SEM – One Year On Liam Ryan, Market Operations Manager.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
BALANCING IN THE BALTIC REGION WG CONCLUSIONS Ingrid Arus Riga/ Baltic Mini-Fora meeting, 24 th of April 2009.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Code Governance Review Major Policy reform Proposals Gas Customer Forum 26 January 2009.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
A Sustainable Future Powered by Electricity DS3 Workshop EAI Perspectives 14 th October 2013.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
The industrial consumer’s view IFIEC EUROPE 1 GTE 2 nd Annual Conference September 2004 Copenhagen Barriers to competition in the view of a consumer.
The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011.
Market Systems Release Update Modifications Committee Meeting 65 December 3rd
Impact of Increasing Meter Errors on the SEM Modifications Committee Meeting 65 3 rd December 2015.
Metering Modification to T&S code Cathal Kearney Protection & Metering 03/12/2015.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 27 March 2012.
T&SC Modification Proposal: Clarification of Outturn Availability
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
Philippine Feed-In Tariff System Implementation 1.
Juliet Corbett, NIAUR. Regulatory Structure  Ireland  CER  Licenses Generators Suppliers ESBCS ESBPG ESB Networks Eirgrid Transmission License Eirgrid.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
Background and Process
Transmission Workgroup 4th October 2012
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Holistic view of Charging Modifications – In flight 11th June 2018
TSC Modifications Panel Meeting
Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Version 2
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Elections 2013 Modifications Committee June / July 2013
Update to Unit Under Test Process
UNC 0621L: Amendments to Gas Transmission Charging Regime
MOD_10_18 Amendment to Capacity Settlement Statement Publication from Monthly to Daily 13th March 2018.
Interim Suspension Delay Periods
Mod_34_18 Removal of Make-Whole Payments for biased quantities and negative imbalance revenue, and small clarifications to determination of Start Up Costs.
CMC_04_19 Finalisation of Exchange Rate in Auction Information Pack
Summary Issue Modification Aim Effect of the mod Impacts
UNC 0621L: Amendments to Gas Transmission Charging Regime
Use of Technical Offer Data in Instruction Profiling / QBOA Version 2
MOD_03_19 Amended application of the Market Back Up Price if an Imbalance Price(s) fail to calculate Energia.
Part B Suspension When Suspended Under Part A
Ofgem presentation to Gas Transmission Workstream
Modification Proposal 136
Long Term Consumption Adjustments
Presentation transcript:

Background T&SC V9.0: The Market Operator shall not grant the status of Under Test for the purposes of this Code to Autonomous Generator Units, Pumped Storage Units, Demand Side Units, Interconnector Units or Interconnector Residual Capacity Units. Costs to the system will arise when a generator is testing, particularly during the commissioning phase. – Running additional generation – Increased risk of trips etc. – Increased Reserve If a generator is not Under Test, these costs increase Dispatch Balancing Costs and are recovered through the Imperfections Charge, levied across all suppliers.

Background Two modifications raised to date: – Mod 10_11: Interconnector Under Test Recommended for Approval – Mod 14_11: Pumped Storage Under Test Deferred Ongoing work to determine testing requirements for Demand Side Units.

Pumped Storage Testing Tariffs Consultation: 3 responses from 6 explicitly agreed with the proposal that Pumped Storage Units should be subject to Testing tariffs –Energia concurs with the view that the asset owners of interconnectors, including the future East West Interconnector, and pumped storage units should pay appropriate testing charges and we would urge the regulatory authorities and SEMO to ensure this is possible through expeditious modifications, as necessary, to the trading and settlement code and central market systems. – With regards to inclusion of generator types in the testing regime, IWEA believes that both interconnectors, including the proposed 500MW East West Interconnector, and pumped storage units should be liable to pay testing charges. During testing, these generators will have an impact on market imperfections and therefore the cost should be borne by the asset owners. Therefore IWEA believes that the market Modifications Mod_10_11 and Mod_14_11 should be approved and implemented to facilitate this. –BG Energy believes that pumped storage units and interconnector units should be included in this testing tariff, especially during their commissioning phase. ………….As per the general principle of correctly allocating costs, these testing costs should be borne by the asset owners and not socialised across the market. Therefore the implementation of modifications Mod_10_11 and Mod_14_11 should be expedited to make it possible to charge these units the appropriate tariff when they are testing.

Pumped Storage: Current status 1 pumped storage station at present – 292 MW: 4 x 73 MW 1 pumped storage station: Signed connection agreement – 70 MW 10 further pumped storage stations in the application process – Total capacity: 2443 MW – Largest: 418 MW

Pumped Storage: Costs of commissioning Costs to the system of commissioning: – Dependent on a number of factors including unit size, fuel prices and system conditions (demand, generator availability etc) – Estimated possible costs 50 MW unit (Generation testing only): 100k - 200k 100 MW unit (Generation testing only): 200k - 400k – Calculation of the cost of testing pumping component would require further studies

Conclusion Facilitate Code objective ensuring no undue discrimination between persons who are parties to the Code Consultation on the Testing Tariffs: Received support for proposal Lead time for SEM changes – Important to address now rather than delay – Required for future Pumped Storage connections