Kaysville City, UT Electric Rate Study Results

Slides:



Advertisements
Similar presentations
Water Rates Utility Rates & SDCs Presentation to the West Linn City Council October 5, 2009.
Advertisements

Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
CSI Phase II: R Solar for Affordable Housing CPUC Intent: Set aside a “minimum” of 10% of budget $216.8M Solar Economics Less Compelling to CARE-Households.
2014 Budget Department Presentations Infrastructure Funding Options.
Contributions In Aid of Construction Mark Beauchamp Business & Finance Workshop Utility Financial Solutions
Financing. Types of Finance Debt Equity Debt Normally from Banks Amount loaned and interest rate – Depends on risk & developers standing – % of.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
Contributions In-Aid and Development of Fees Utility Financial Solutions Mark Beauchamp, CPA, CMA, MBA President
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Options for Financing Small CHP Systems Barry Sanders, AmericanDG.
Section 6.2 Notes. Can you afford a loan?  First way to tell  Second way to tell.
Department of Water and Power City of Los Angeles Energy Cost Adjustment Factor Modification August 2009 MODIFIED PROPOSAL WILL BE SUBMITTED ON DECEMBER.
1 Why Choose Solar? Solar costs are coming down Solar panels are getting better and better Electricity costs are rising Solar panels last +25 years.
International Center For Environmental Finance Series B – Course #3 Determination of Financial Feasibility.
One Step Ahead: Using a Finance Plan for Regional Water System Operations Deena Hood Central Wyoming Regional Water System Carol Malesky Integrated Utilities.
APPA’s Financial Planning for Municipals Mark Beauchamp, CPA, CMA, MBA September 27, 2005 Business & Finance Workshop.
Financial evaluation 9 March Financial Feasibility Assess the ability of the utility or developer to meet the financial obligations associated with.
THE STRUCTURE OF TURKISH ECONOMY. Table of Content 1. Production Structure 2. Inflation 3. Labor Statistics 4. International Trade and BoP Statistics.
Financial Analysis. Module 1 : Solar Technology Basics Module 2: Solar Photo Voltaic Module Technologies Module 3: Designing Solar PV Systems ( Rooftops)
Presented to the City of Dover, Delaware June 6, 2006 Revenue Requirements, Cost of Service and Rate Adjustments for the Electric Utility.
THE COSTS AND METHODS OF OBTAINING CREDIT PG NAME, TEACHER AND DATE.
Getting Out of Credit Card Debt A Financial Literacy Presentation by Member Name, CPA.
RATE ANALYSIS FY FY 2019 March 6, 2014 CARSON VALLEY WATER UTILITY FUND 326 – DEPARTMENT 864.
Residential Solar Investment Program Installer Discussion Solar Installer Meetings June 26-27, 2012.
Resolution 2014R-099 December 18,  Board Direction ◦ Establish a monthly cost-of-service rate of $ for FY 2015 and utilize a General Fund.
Kevin Burnett Presented by CITY OF TULARE, CALIFORNIA.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Distributed Generation Chau Nguyen, Pricing & Sales Support
U TILITIES 2013 BUDGET OVERVIEW Electric Department – Fund 520 Water Department – Fund 525.
1 City of Cocoa Michael Burton - President Andrew Burnham - Sr. Vice President Eric Grau - Project Consultant Presented by: Water, Sewer & Reclaimed Water.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
Dawn Lund Vice-President Utility Financial Solutions 1.
1 City of Cocoa Michael Burton - President Andrew Burnham - Senior Vice President Ashley Venturoni – Project Consultant Presented by: FY 2013 Water, &
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Personal Financial Management
Inclusive Financing for Housing Energy Upgrades
International School of Ouagadougou
Lesson 9B: Evaluating the Benefits and Costs
Kaysville City, UT Electric Rate Study Results
Utility Financial Solutions
Hartek Group is one of India’s fastest growing company with offerings that span across Engineering, Renewables, Technology , Construction , Fuel and Manufacturing.
Energy Services Company Models: Opportunities for Transit
MAX Program Finance Department
Distributed Generation Chau Nguyen, Pricing & Sales Support
Final Rate Study Findings
City of Sisters, OR 2017 Water & Sewer Rate Study
Photovoltaic Systems Engineering Session 26
Date of download: 3/6/2018 Copyright © ASME. All rights reserved.
Project Management Dr. Aravind Banakar –
Project Management
Plug-In Electric Vehicles
Energy Services Company Models: Opportunities for Transit
LESSON TWO: PERSONAL SPENDING
May 2018 Proposed Electric Rate Increase - First Public Hearing
Water and Sewer Rate Study
Financials of Solar Water Pumping and Off-grid Power Plant Dr
PEPCO Energy here Used there
City of Lebanon, Missouri Electric Department
Customer Dedicated Solar
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
WASTEWATER and SOLID WASTE Rate Study
Island Energy Advisory Committee Board
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
Herb Stevens Jeff Lesk Genevieve Hulick
Photovoltaic Systems Engineering Session 22
Mark Beauchamp Utility Financial Solutions, LLC
Solar Opportunities in Ontario
ACSDA 10th General Assembly
No out of pocket cost No payback period Generate $$$ in energy savings Eliminate your electric bill Give you money annually to spend on other things.
City of Santa Paula Water and Sewer Rate Study Results Public Workshop
Presentation transcript:

Kaysville City, UT Electric Rate Study Results Mark Beauchamp, CPA, CMA, MBA President Utility Financial Solutions 616-393-9722

Assumptions Purchase Power Financing New Building Annual Inflation 2.5% increase through 2021 Annual Inflation Annual Growth 1.5% increase through 2021 Financing New Building Start building in 2020 Over 12 years 6% interest rate Capital Plan 2017 - $2,250,000 2018 - $1,950,000 2019 - $750,000 2020 - $750,000 Plus building cost of $4.6M 2021 - $750,000

Projection without Rate Change

Recommended Rate Track

Debt Coverage Ratio

Electric Department Minimum Cash Reserve

Electric Department Target Operating Income

Electric Cost of Service Results

Energy Charges

Monthly Charge

Solar Avoided Cost per kWh

Residential Option Additional Charge per Month per installed kW. Example: 5 kW Solar unit would be Charged $19.09 ($3.82 times five)