Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973

Slides:



Advertisements
Similar presentations
Olivier Pirotte AT-ECR-ME NTof Examples of cryogenic equipment installed by AT/ECR-ME O. PIROTTE.
Advertisements

1 New baseline for the magnet cooling system Yury Ivanyushenkov Engineering and Instrumentation Department, Rutherford Appleton Laboratory.
BUILDING – FROM THE GROUND UP HOSPITAL ENGINEERING INVOLVEMENT IN PROJECT IMPLEMENTATION.
2 Technical seminar - 5 th June 2014 Vincent Roger - TE-MSC-TF.
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
 Over 25 years experience  Contingent Labor Specialists  Branch offices Nationwide  Dedicated account managers  National recruiting teams  Financially.
Travel Website Enhancement Project Project Update First Name Last Name.
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
Positions for 100 Rules for 100 Teams for 100.
Project Status Report Presenter Name Presentation Date.
Inpro Systems Pvt Ltd. This presentation is about Who we are Who we are Background Background Services Services Software Tools Software Tools Standards.
Exhaust to atmosphere G1 V1 V2 V3 LN2 Storage Vessel 150 l Dewar Cryostat Exhaust to atmosphere Nitrogen or helium gas bottle LN2 Circuit for MIT Test,
1 Class #1 Assignments Mark E. Sampson UPDATED 8/02/04 EMIS 8390 Systems Engineering Tool—applying tools to engineering systems.
1 Excel Core Objective 4: Managing Worksheets and Workbooks Microsoft Office 2010 Certification Prep: Microsoft Office Specialist 2010 Exam Practice Story/Walls.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
WP10 General Meeting, Giovanni Volpini, CERN 1 December 2015 Test progress INFN 1.
SEAPERCH WIRING DIAGRAM. OBJECTIVE You will see several examples of wiring diagrams. These are the “old” “generic” ones that every team will have in their.
WP High Beta Cavities Delivery
Final Design Cryogenic and mechanical configurations
Teleconf ACS – FREIA 28th March 2017
Teleconf ACS – FREIA 13th March 2017
Mechanical and cryogenic configurations
Control System and Automatic Sequences
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973
2K Cold Box FDR Introduction
Solenoidal magnet. The status of manufacture, forthcoming works
Dipole status & update DISCO_RAP (NTA)
HFM Test Station Main Cryostat
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200
Teleconference ACS – FREIA 18th April 2017
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
Teleconference ACS – FREIA 10th May 2017
Cryostat design Mechanical design: Thermal screens: Specifications:
Teleconference ACS – FREIA 17th October 2017
Teleconference ACS – FREIA 31st October 2017
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
ACCESS to magnet testing facilities
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects & the Roles and Responsibilities.
(vertical cryostat, Gersemi)
ESS RF Development at Uppsala University
Status of the cryogenic system for B180
Cryostat design Mechanical design: Thermal screens: Specifications:
Team member, Team member and Team member
Overview of Project Management
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Project or Team name: Vision: Mission Statement:
Project Organization Chart Roles & Responsibilities Matrix
UAB School of Medicine: MD Core Curriculum Schematics
Status of the PANDA Solenoid Magnet Production in BINP
Teleconference ACS – FREIA 20th February 2018
Click to insert your name. Click to insert your status update.
در تجزیه و تحلیل شغل باید به 3 سوال اساسی پاسخ دهیم Job analysis تعریف کارشکافی، مطالعه و ثبت جنبه های مشخص و اساسی هر یک از مشاغل عبارتست از مراحلی.
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200
DPO Audit Log & Action Plan
ESS Installation Binders Readiness Reviews Work Orders Mikael Jakobsson ESS Installation Manager Sep , 2018.
Status of the PANDA Solenoid Magnet Production in BINP
Team member, Team member and Team member
Tasks and responsibility sharing in the KA Team
Teleconference ACS – FREIA 19th June 2017
Discussion on MERIT Cryogenics Specifications
Accelerator NCFE Liaison Officer
PANDA Cryostat and Yoke
Overview of Project Management
UPPSALA UNIVERSITY_GERSEMI PROJECT
(vertical cryostat, Gersemi)
PROJECT MANAGEMENT WORKFLOW
Port Back Data Collection & Transition
Port Back Data Collection & Transition
Key Activities/ Milestones
Presentation transcript:

Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973 Vertical Cryostat GERSEMI

GENERAL ARRANGEMENT

DEWAR

MAGNET INSERT

BATH INSERT

QA (1/5)

QA (2/5)

QA (3/5)

QA (4/5)

QA (5/5)

Project: Design: Quality: Manufacturing: Resources Project: 1 x Product specialist (General overview including SC) 1 x Project Engineer (CD’s core scope) Design: 1 x Solidworks station 2 x SolidEdge stations Quality: 1 x Welding expert (IWE) 1 x Documentation officer Manufacturing: 1 x Foreman 3 x Dedicated teams (1 for dewar, 1 for inserts, 1 for valves box, lines and misc.)

Planning

Monthly Progress reports PHOTO DIAGRAM IPN WP1 heater / design 0% / total 0% / pending: 3D input model WP2 cryostat / design 0% / total 0% / pending: 3D input model WP5 valves box / design 0% / total 0% / pending: 3D input model WP status SC status Subcontracting status: none