MATERIAL PRESENTED PROPRIETARY

Slides:



Advertisements
Similar presentations
FUTURE OF INFORMATION ACCESS OVERVIEW OF OECD AND LATIN AMERICA PERSPECTIVE ACCESSING TRANSPORTATION INFORMATION RESOURCES WORLDWIDE July 29 - August 2,
Advertisements

Infrastrukturë Backbone ALBANIAN NATIONAL FIBER OPTIC NETWORK.
Sterling Atlantic Fast Closing System: System Objectives Close small cap investments in rapid, low time cost, and low money cost system Close small cap.
WORLD BANK Overview of Procurement Opportunities Peter R. Easley, Esq.
NSF ANNUAL REVIEW June 2010 Ocean Observatories Initiative Terrestrial CyberPoPs and Network.
Abstract: This chapter mainly tells about the concept and characteristic of various trade forms; main contents of various trade agreement; and issues of.
HZTAdvantage© Methodology Overview HZ Technologies, LLC Doc ID: CON02.
LMP G parameters draft-dharinigert-ccamp-g lmp-09.txt Gabriele Galimberti Cisco Systems Zafar Ali Cisco Systems Ruediger KunzeDeutsche Telekom.
Network Design and Implementation
DOL AME Grant RFPs Manufacturing Lab Equipment Pre-Award Webinar July 25, 2013.
Software Application Acquisition – Not a Simple Task! Eddie Whitfield CPIM, CIRM, CSCP, P.E.
Business Plan Preparation Frank Moyes Leeds School of Business University of Colorado Boulder, Colorado Operations & Development Strategy.
Software Development Contracts and Legal Issues Cost plus Fixed price Combined.
Business Plan Preparation Frank Moyes Leeds School of Business University of Colorado Boulder, Colorado Operations & Development Strategy.
ACTION PLAN LIN ASSISTANT ENGINEER KUNMING-CHINA.
LSST Camera Performance and Safety Assurance Plan and Safety Overview Joe Kenny Camera Safety Manager LSST Safety Council Review 18 August 2015.
Virtual Packet Core Cloud solution for LTE. if you need to construct LTE network for 1mln users... How will it work for operator?
OSI Model Honolulu Community College Cisco Academy Training Center
OPERATING LEASES FROM THE MARKETPLACE POINT OF VIEW THE RESIDUAL VALUE AND THE TECHNICS TO MITIGATE THE RISK.
Expense Reduction: the timing has never been better! Lycia Rettig, Director Expense Reduction Analysts
Lit fibre service Lada Altmannová CESNET Praha, September 19th, 2007.
© Ciena Corporation The Path to 100 G Ethernet Martin Nuss VP & Chief Technologist.
1 Second Safety Council Meeting Tucson, AZ April 10-11, 2014 Name of Meeting Location Date - Change in Slide Master Safety in the Procurement Process Bill.
Chapter 10 Marketing.
EVALSO a high bandwidth communication link for Paranal ESO Lunch Talk /11/30 G.Filippi
Models to manage G parameters 1.draft-galikunze-ccamp-g snmp-mib-09.txt 2.draft-dharinigert-ccamp-g lmp-08.txt 3.draft-dharini-netmod-g yang-01.txt.
PNOs-Suppliers Technical Interfaces Heidelberg, 3 March 1998 Telecom Italia Supplier Qualification and Monitoring 1 TELECOM ITALIA SUPPLIER QUALIFICATION.
Models to manage G parameters draft-galikunze-ccamp-g snmp-mib-11.txt Gabriele Galimberti Cisco Systems Ruediger KunzeDeutsche Telekom Lam,
Name that Source ABCD E Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Final Final Question.
LSST VAO Meeting March 24, 2011 Tucson, AZ. Headquarters Site Headquarters Facility Observatory Management Science Operations Education and Public Outreach.
O&M of dark fibre networks (based) - good practices, procedures
Your Financial Toolkit: Who can provide the right financial tools for your charter school? presented by SEFCU.
Business Utilities What is “utility”? Economic term that means…
At vision payment solutions, we are here to recommend the entire range of advanced and techno-savvy payment solutions.
Building Europe Link to Latin America Fernando Liello and Thomas Fryer | BELLA Consortium | 15 June 2016 | TNC2016.
Framework for DWDM interface Management and Control draft-kdkgall-ccamp-dwdm-if-mng-ctrl-fwk-01 Ruediger KunzeDeutsche Telekom Gabriele Galimberti Cisco.
Network Administration and Systems Services. Dark fiber ring.
PROCUREMENT General Overview of Procurement Process on Dublin Waste to Energy Project.
Slide 1 A Practical Guide to Issuing a Request for Proposals Notes.
HRM 319 Week 2 DQ 1 What is included in a request for proposal (RFP)? How do companies use an RFP when sourcing software? When evaluating vendor software.
An evolutionary approach to G-MPLS ensuring a smooth migration of legacy networks Ben Martens Alcatel USA.
AmLight-ExP: Collaboration at 100G
National Research Platform Meeting August 6-7, 2017
02C.08 International Communications and Base Site
Procurement Management
Project Name Company Name Presenter Name
LSST - IN2P3 connectivity
Cluster Communications
Needs Analysis & Alternative IT investment strategies Pertemuan 3-4
What are DM folks working on?
FCS MARKETPLACE & LAUNCHPAD
Project Name | Company Name | Presenter Name
Proposals and Progress Reports
Business Plan Preparation
CHILEAN NETWORKS La Serena to Santiago Fiber. Contract 1. $5,760,000 IRU Base to AURA Gatehouse Fiber. Contract 1a. IRU AURA Gatehouse.
Presented to Department of Information Technology February 24, 2010
Model Contract for Health
Project Name Company Name Presenter Name
Superintendent’s Proposed Budget
Project Name Company Name Presenter Name
Alcatel Confidential and Proprietary
Decommissioning Workshop Surabaya 25 – 27 August 2004 (organized by BPMIGAS – facilitated by ConocoPhillips)
Project Name | Company Name | Presenter Name
Business Plan Preparation
Defining project management
Cross border sales The End Customer The Receiver The Seller.
PURCHASE MANAGEMNET.
Project Name Company Name Presenter Name
ISLAMIC ECONOMICS PROJECT
An extended warranty can be added to the purchase of many products, it can be a camera, refrigerator or TV extended warranty. You may be motivated to.
Presentation transcript:

MATERIAL PRESENTED PROPRIETARY Status of Chilean DWDM RFP Ronald Lambert - LSST Sandra Jaque - Reuna Fernando Liello – Garr LSST AHM AUGUST 18, 2016 MATERIAL PRESENTED PROPRIETARY

OVERVIEW Charter to purchase DWDM equipment for the following locations with 100Gb Lambdas Cerro Pachon – LSST and AURA La Serena – LSST, AURA and Reuna Santiago – Reuna AHM Tucson. August, 2016.

OVERVIEW Following DWDM vendors invited to compete In the process AHM Tucson. August, 2016.

METHODOLOGY AHM Tucson. August, 2016.

METHODOLOGY Commenced process in August 2015. Economical Progress AHM Tucson. August, 2016.

METHODOLGY Technical Progress AHM Tucson. August, 2016.

SUMMARY August 2016. Process terminated. Effectively selected the vendor. Advantages of the negotiated procedure. We are significantly under budget Lambdas have increased from 100Gb to 200/400Gb Optical protection on the AURA and LSST links Added a second Lambda to the AURA Base to Summit link Added a chassis in the Santiago International Exchange Obtained the best warranty and service agreements - OPEX Original budget $1.4M Original equipment CAPEX costs = $900,000 Additional DWDM node equipment CAPEX cost= $200,00 Total = 1,100,000 AHM Tucson. August, 2016.

Technology Technically the two companies in the process are quite similar They offer: OTU-4 Line card (4 x OTU-4) Client interfaces (nx10GE or 4x100GE) One uses a single card for the line and client interface but in a different chassis The other uses two cards, one for the line side and the other for the client AHM Tucson. August, 2016.

Thank you. LSST AHM August 18, 2016