Doug Tucker and Jon Jensen WECC Staff

Slides:



Advertisements
Similar presentations
SIS – NBS Online Specimen Tracking System Training
Advertisements

Farm Service Agency Lender’s training for Electronic Submission of Guarantee Fees Implementation Date: September 23, 2009.
Logging In Go to web site:
HELP GUIDE NEW USER REGISTRATION (SLIDE 2) TAKING A QUIZ (SLIDE 8) REVIEWING A QUIZ (SLIDE 17) GROUP MEMBERSHIP (SLIDE 26) CREATING QUIZZES (SLIDE 31)
Doug Tucker and Jon Jensen WECC Staff SRWG Workshop July 15-16, 2014 ColumbiaGrid.
System Installation and Setup Doug Tucker Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
MEGS+ Michigan Electronic Grants System Plus Office of Special Education May 2012.
DWINSA 2007 Website. Website Purpose Allow states to track status of questionnaires Allow systems >100K or states to upload project data.
Online Reporting Guide
Enforcement: Viewing/Editing Your User Profile FMCSA Portal Prioritization Phase I Release, December 2010 v1.4.
Enrolment Services – Class Scheduling Fall 2014 Course Combinations.
Lead Management Tool Partner User Guide March 15, 2013
Drinking Water Infrastructure Needs Survey and Assessment 2007 Website.
IFORM ACCOUNT MAINTENANCE ICT4D SESSION 4. IFORMBUILDER WEBSITE REQUIREMENTS To access the iFormBuilder website, you need the following items: -Reliable.
0 eCPIC Admin Training: Automating User Account Management These training materials are owned by the Federal Government. They can be used or modified only.
Training by the Office of Library and Information Services Contact for more information: karen.gardner- or
Building a Project Jon Jensen Associate Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Page 1 of 42 To the ETS – Create Client Account & Maintenance Online Training Course Individual accounts (called a Client Account) are subsets of the Site.
Step 1 Lead Notifications Dear Partner, New leads have been assigned to your organization based on customer preference and are available for you.
American Diploma Project Administrative Site Training.
1. On the homepage, click the “Register” link below the Login box in the left navigation bar. Registration Step 1.
American Diploma Project Administrative Site Training New Jersey.
Orders – Create Responses Boeing Supply Chain Platform (BSCP) Detailed Training July 2016.
How to complete and submit a Final Report through
Online Submission and Management Information -- Authors
Comprehensive Continuous Improvement Plan (CCIP)
A Quick Start Guide to Online Ordering
Software Application Overview
Training Documentation – Replacing GSPR with RFQ 2.0
Welcome! To the ETS – Create Client Account & Maintenance
Partner Program Platform Training Partner Self Service
NetApp Online Ordering User Tutorial
**Please view the instructional guide as a slideshow**
Comprehensive Continuous Improvement Plan (CCIP)
To the OASIS Royalty Reporting Online Training Course
To the ETS – PNG Continuation: Online Training Course
To the ETS – Agreement Management Online Training Course
ERO Portal Overview & CFR Tool Training
Comprehensive Continuous Improvement Plan (CCIP)
Welcome to Research Wave/IACUC
To the ETS – Agreement Management Online Training Course
Materials Engineering Product Data Management (ePDM)
DrayWatch Training November 2009.
MyGaDOE Portal Provisioning for Security Officers
Students Welcome to “Students” training module..
CSDR Submit-Review Website Submitter Guide
AmeriCorps Member Tutorial – OnCorps Reports 2.0, Standard Reports
The Smarter Balanced Assessment Consortium
The Smarter Balanced Assessment Consortium
Employee Self Service An Introduction to Premier ESS.
Managing Rosters Screener Training Module Module 5
To the ETS – PNG Continuation: Online Training Course
Activating Your Account and Navigating Through TIDE
To the ETS – Encumbrance Online Training Course
The Grants.gov Online Grant Submission Portal November 8, 2017
To the ETS – Agreement Management Online Training Course
To the OASIS Royalty Reporting Online Training Course
To the ETS – PNG Continuation: Online Training Course
To the ETS – Agreement Management Online Training Course
The Smarter Balanced Assessment Consortium
The Smarter Balanced Assessment Consortium
To the ETS – Encumbrance Online Training Course
Jon Jensen Associate Staff Engineer
CFR Enhancement Session
Quick Guide for Online Ordering
iLab Reseachers Training
Create, Upload and Use Data Extensions (Lists)
Presentation transcript:

Doug Tucker and Jon Jensen WECC Staff SRWG Workshop July 15-16, 2014 ColumbiaGrid

Overview BCCS Administration MOD File Builder BCCS Web Interface Base Case Process Discussion and Review

What is BCCS? WECC’s tool to create base cases BCCS is a database with a few extras Starts from “Master Base Case” Existing system (Topology) Holds various load and generation patterns System additions or corrections Has the ability to solve a case SAT Testing Interactive training Identify any issues If we need more time please ask and keep this going Siemens support

Overall Process Slide Master Base Case Verify Solution/Solve Case Case Build Projects Profiles BLG DEVC

MOD File Builder Compares PSSE or PSLF cases Creates Project, and Profile files Load Generation Profiles Device Control Profiles Rating Profiles Net Interchange files Load Scaling Configurable data from BCCS

Project Files What is a Project File Naming Convention Project Types (Area Number)_(Company Name Acronym)_(Project Description) Project Types Base Case Corrections (possible extra for different MVA/kV brackets) Existing case errors Generation < 20 MVA Generation > 20 MVA Transmission/Load < 100 kV Transmission/Load > 100 kV

Project Files (cont.) Status Types Base Case Corrections Steady-State Dynamics (not used at this time in the BCCS) WECC Generation and Transmission/Load Planned Proposed Exploratory How to Create a Project File Select the Project Function Create Project – Select a name Project Header Open Base Case – Does not Include project Open New Case – Includes changes Compare all or by Criteria Area Owner Zone DMP Checks Review

Creating a Project file Download Base Case out of BCCS Import and solve case in the desired Powerflow program Export solved case and save for comparison Add project to case Solve and Save case (save with different name) Export raw file and save file With these two raw files you can make a project file in File Builder

Profiles Files What is a Profile File? Naming Convention Rating Profile Bus Load and Generation Profile Voltage Control Profile Net Scheduled Interchange (NSI) Naming Convention (Case Abbrev)_(Area Number)_(Company Name Acronym)_(Profile Type) How to Create a Profile Function Select Profile Function Create Profile Select Type Open Base Case – which has the data that you want to use Compare by all or Criteria View

BCCS Web Interface Administrative Functions Uploading Downloading Viewing data on the web Editing data on web Building Cases

Web Interface: Administrative Overview Login User settings and options Email from BCCS Downloading

Web Interface: User Administrative Functions Login Login on the web at https://bccs.wecc.biz Internet Explorer is only supported browser Other browsers work but layout looks wrong My Account Preferences Able to see type of data you can change, assigned areas, assigned project types, and adjust user profile

Web Interface: User Administrative Functions continued My Account Continued Suppress or allow emails “Send me email notifications” check box See group name and role assigned as user The actions you can perform are listed under the role If you can’t perform an action this is the first place to look

Web Interface: User Administrative Functions continued Groups Decide what data can be modified Based on Bus Number Range Owner Numbers Zone Numbers Area Numbers Roles Decides what actions you are allowed to perform Modify, View, Approve…

Web Interface: Email Notifications Several email categories (ptimod.admin@siemens.com) Data Submittal Requests Data requests are assigned to user groups Initial Data Submittal Request Type of data requested (projects or profiles) Reminder (request creator can designate how often) Past Due Date (daily notifications) Project and Profile Approval Multiple layers of approval (Submit, Approve, and Accept)

Uploading/Downloading How to upload Project Profiles Alternate cases Net Scheduled Interchange Applying to data request Downloading

Uploading a Project Create project using MOD FileBuilder Select import on the project page or on the tree menu Browse to project location on local machine Click Send Must verify project type and status are completed fields

Uploading a Project Cont. Make sure any validation issues are addressed If the change is legitimate but results in a warning Comments can be used to help any approval so contact is not needed Ensure the effective date is correct for each phase Once all validation issues are addressed submit the project

Uploading a Profile Create profile using MOD FileBuilder Type of profile decides how it should be handled. WECC Staff will create a “base profile” Data submission will apply to the specific “base profile” May need specific types for profiles to identify Have not been developed yet

Uploading a Profile Cont. Select import on the profile page or on the tree menu Browse to project location on local machine Click Send Validation Examine that profile changes are made only in assigned area

Uploading Alternate Base Cases What is a Alternate Base Case? Optional tool for case creation Used only in case definition May require different set of projects Primarily used by users, not likely to be used for WECC approved case creation Can be uploaded with PSLF .SEQ data Negative and zero sequence data for fault analysis

Uploading a Alternate Base Case Cont. Select import on the Alternate Base Cases page or on the tree menu Browse to project location on local machine Click Send Alternate base case has basic table views just as the base case does to be discussed next

Viewing Base Case Main page of BCCS provides Equipment summary Tree menu can be expanded to show list of tables Bus, branch, load, generator,… The list includes both data common between PSFL and PSS/E as well as tables found only in each program.

Viewing Base Case Continued Useful for anyone without access to a power flow program Others unlikely to use the viewing capabilities extensively Tables navigated through tree menu or list menu at the bottom of each table Limited number of records per page Filtering is provided Base case not directly edited

Viewing Projects Navigate to the projects page from the tree menu Select project you would like to view and select the view button at bottom of list of projects This takes you to the high level project page To view specifics of a project choose the phase and view

Viewing Projects Continued Projects are broken into the tables they change For example: to view bus changes select Bus from the menu at base of screen Changes are on the phase level, entire project changes are not seen in web interface Useful to verify that the project was read in correctly

Viewing Profiles Navigate to the profiles page from the tree menu Select profile you would like to view and select the view button at bottom of list of profiles Specific profiles show specific data For example: BLG profiles Bus, load, and generation data listed in tables

Viewing Alternate Base Case Select alternate base case from the tree menu on left Select the alternate base case you wish to view Select view on the bottom of the screen Very similar to viewing the base case No tree menu on the side of the screen

Downloading Base Case Download the base case for project file creation On home screen below equipment list Select Download Base Case Alternate Option: Build a case with no projects or profiles

Downloading a Project Select Projects from the tree menu Select the project you want to download from the list This will highlight the line Select download (it has been observed that this does not work) Can also be done for each phase of the project

Building Cases Project selection Profile selection When WECC builds a case we will include all the approved projects up to the date of the case being build Users will have the option to build cases Can include other projects or exclude some approved projects depending on the use of the case Profile selection Only one profile may be used for each case build

Building Cases Case build order Ratings applied to case This is handled outside of the online application If not being applied as expected we can adjust Ratings applied to case 8 Ratings for PSLF users (Want all 8 populated) PSS/E 3 Rating selected PSS/E users will need different ratings profiles for each year and season based on the case description

Approval Process Why have an approval process Catch data errors Data quality Verify that data (projects) should be in base cases Who performs the approval Initial Submitter (Data Owner, sub-coordinator) Approve Data (Area Coordinator) Accept Data for Case (Staff)

Approved Project What happens after approved Project will included in WECC case builds Considered “good data” Editing projects after they have been approved Will restart the approval process Committing a project Added to the master base case No longer a “project”

Profiles WECC base case profile process Changes to Base Profile must go through approval process Different profiles will have different approvals Example: Net Scheduled Interchange profiles will be different than the BLG profile Independent case/Profile creation Can build profiles for own use and case builds Will not go through the approval process

Profiles continued Profile approval process After creation in MOD FileBuilder Submit to BCCS Validation will be run Verify only changing “your” data Based on Group that responsible for Base Profile creation and Modification WECC Staff will create a base profile for each base case Will be modified by data owners

Deleting Data (Projects or Profiles) Deleting data has an approval process A request is created when delete is selected by a user with permission to delete If confirmed it will proceed to the next step A request is sent to the approver If approved sent to next step A request is sent to the accepter If accepted the data is removed from the active list Deleted data is not eliminated and can still be viewed

Data request from BCCS Data requests can specify type of data request Profiles Projects Data submission Apply data provided through uploading to various data requests Done through web interface Manual process

Data Submission Select Data Submission Request from the tree menu Will list the data requests applicable to your group When data is applied to the request it will show the submission Allows tracking for data Will create the late data log Automatic email reminders are sent daily after due date passes

Support WECC staff administrative support Area Coordinators User names requests Forgotten passwords Website issues Area Coordinators Received Training from Siemens Primary support on MOD FileBuilder Primary approval, Data Checking

Parallel Process for Building Cases Verify that we can build the “same” case in both processes This will require extra time Likely two data requests One for data to be sent to Area Coordinator and Sub Coordinators as usual One for data to be submitted to BCCS Will do as many cases as it takes to build confidence in and improve the process

BCCS Process Should be two update processes Normally static data* (e.g., impedances, dynamics data) Operationally variant data (e.g., generator dispatch for a specific scenario) Two processes have different update cycles *Note: This process will change after initial population of the BCCS

Normally Static Data Collection Process (Implementation Phase) Primarily: “Project” Files Ratings Files Dynamics Data

Normally Static Data Collection Process (Ongoing Process) Data provided “as needed” No official data request – similar to current process for Generator Testing Program

Operationally Variant Data Collection Process “Profile” information (loads, generation, reactive devices, interchange, etc.) Data request for each base case data set Similar to current base case development schedule Data provided from a solved case Includes initial submittal and data review periods

Operationally Variant Data Collection Process

BCCS Process As we use the tool the process will evolve What works What is more difficult Changes that would make the process better To the BCCS To the process SRWG and the Data Preparation Manual Will be updated with the process Maintained at SRWG

Group Hands On – Build a Case WECC Staff Area Coordinator Approval WECC Accept BCCS Web App Sub-Coord. Case Build

Log of Issues

Questions? Further Discussion